Bid Publish Date
17-Aug-2026, 10:42 am
Bid End Date
31-Aug-2026, 11:00 am
Location
Progress
Organization: Indian Coast Guard; Procurement: repair, maintenance, and installation of plant/system equipment (Version 2) for ICGS C-423; Location: not specified; Estimated Value/EMD: not disclosed. Scope centers on service for suboptimal air conditioning with observed defects in AC compressor and AHU evaporator coil fins clogged; includes in‑way jobs and related maintenance. Tender references include ATC and SOW attachments; potential for scope modification per 50% option clause; no BOQ items listed. The entry highlights the need for on‑site service capability and alignment with buyer terms.
AC system repair and maintenance for ICGS platform C-423
Diagnose and service AC compressor defects
Clean and restore AHU evaporator coil fins
On-site service with potential in‑way tasks per SOW
50% option clause for quantity or duration variation
50% contract quantity/duration variation allowed by buyer
Delivery timeline and payment terms to be defined in ATC/SOW
EMD, GST, PAN and OEM authorizations to be validated per ATC/SOW
Payment terms not disclosed; refer to ATC for milestones and schedule
Delivery/install timeline not specified; expect site-specific scheduling in ATC/SOW
LD details not disclosed; verify in ATC/SOW
Experience in repair/maintenance of HVAC systems on defence vessels or platforms
Capability to perform on-site AC and AHU service
Compliance with OEM authorizations and relevant defence procurement norms
Quantity
1
Bid Type
Two Packet Bid
Bid Validity
120 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Tech Clarification Time
2 Days
EMD Required
No
MII Compliance
Yes
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Experience Required
1 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Service
Bid To RA
No
Bid To RA Enabled
No
Item Category
Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C-423; E 057 Performace of AC system is sub optimal defect observed on Ac compressor and AHU evaporator coil fins chocked All inway jobs included; Service Provider
Delivery Locations
1
Delivery Cities
South Andaman
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | South Andaman | South Andaman | - | - | Project / Lumpsum Based | - | Estimated Cost of Spare/Consumable s/Items on Reimbursement basis in Rs (please input 0 if not applicable) : 0 |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
ATC
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
GEM_GENERAL_TERMS_AND_CONDITIONS
Extended Deadline
31-Aug-2026, 5:30 am
Opening Date
31-Aug-2026, 6:00 am
Extended Deadline
27-Aug-2026, 5:30 am
Opening Date
27-Aug-2026, 6:00 am
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar AC system repair/maintenance projects
Financial statements to demonstrate capacity (if required by ATC/SOW)
EMD documentation (as per ATC/SOW exact amount and mode)
Technical bid documents confirming capability to perform on-site AC/AHU work
OEM authorization letters (if required by ATC/SOW)
Any other documents specified in ATC/SOW attachments
Key insights about ANDAMAN & NICOBAR tender market
Bidders must review ATC/SOW attachments for eligibility, submit GST and PAN, provide prior HVAC repair experience on defence platforms, and include OEM authorizations if required. Include EMD as specified in ATC, and ensure compliance with site scope such as AC compressor and AHU coil service.
Required documents typically include GST certificate, PAN, experience certificates in HVAC maintenance, financial statements, EMD submission, technical bid, OEM authorizations, and any ATC-specific forms. Verify exact list in the ATC/SOW attachments before submission.
The tender notes defects in AC compressor and AHU evaporator coil fins; scope includes on-site diagnostics, cleaning, and repair. Specific performance metrics or standards are not listed; refer to SOW for exact technical compliance and testing requirements.
A fixed delivery timeline is not disclosed in the available data. Expect scheduling per ATC/SOW after contract award, with potential site constraints. Confirm milestone dates and acceptable delivery windows in the ATC.
Payment terms are not explicitly stated in the provided data. Review ATC/SOW for milestone-based payments, possible advance, and completion-based settlement. Ensure the bidder’sCashflow plan aligns with stated milestones.
OEM authorization requirements are not explicitly listed; however, defence tenders often require OEM or equivalent certifications. Check ATC/SOW for exact authorization needs and attach supporting documentation in the technical bid.
The buyer may increase or decrease contract quantity or duration up to 50% at contract issue and post-issuance, with the service provider’s consent for scope changes in lump-sum tasks. Prepare for potential scope adjustments in bid pricing.
The SOW and ATC documents are linked in the tender attachments section. Open the provided file links to extract exact scope, eligibility criteria, EMD value, submission format, and compliance requirements before bid submission.