TenderDekho Logo
Closed GEM

India Tourism Development Corporation Limited LED Lighting Tender South Delhi 2026 – ISI/ISO Compliant Fixtures & Electrical Accessories

Bid Publish Date

10-Aug-2026, 1:15 pm

Bid End Date

21-Aug-2026, 3:00 pm

Value

₹92,226

Progress

RA
Issue10-Aug-2026, 1:15 pm
Reverse Auction08-Sep-2026, 3:00 pm
AwardPending

Tender Overview

Organization: India Tourism Development Corporation Limited, located in South Delhi, Delhi 110016. Procurement scope: multiple lighting and electrical items per tender specification, including LED COB lights (12W/9W, 3000K), LED bulkhead lights (20W, 6500K), E27/E14 bulbs (5W, 10W), extension boards, wall fans, LED candle bulbs, and related electrical accessories. Estimated value: ₹92,226. Product category spans interior lighting and small electrical fittings. 13 items listed with varied wattages and base types; no itemized BOQ quantities disclosed. Tender emphasizes standard-compliant fixtures and generic tender-specific terms with option to increase quantity by up to 25%. Unique element: requirement to obtain advance sample approval before bulk manufacturing, with 2 samples due within 7 days of award. Location relevance: tender in South Delhi for lighting/electrical fittings, targeting suppliers capable of rapid delivery and sample-based approval.

Technical Specifications & Requirements

  • Item types include: LED COB light 12W 3000K, LED COB light 9W 3000K, LED Candle bulb 5W, 2M 30Amp key tag, PVC Tape, 3-pin top 6 Amp/15 or 16 Amp, Extension board 4+1 6 Amp, Remote with stand 4-way, Wall fan 400 mm, LED Bulkhead Light 20W 6500K, E27 10W bulbs (3000/4000K), E14 Candle bulb 5W.
  • No explicit technical specifications or mandatory standards disclosed in the BOQ data beyond item descriptions; however, the buyer terms require adherence to the contract framework and advance sample approvals. The estimated contract value suggests a small to moderate procurement of standard electrical fittings for government/organization use.
  • Key delivery phrase: supply in line with original/extended delivery orders; option to adjust quantity up to 25% with contracted rates; delivery timelines tied to delivery order dates.

Terms, Conditions & Eligibility

  • EMD amount not disclosed in the tender data; bidders should expect typical government EMD practices unless stated otherwise.
  • Delivery flexibility: option to increase/decrease quantity by up to 25%; extended delivery period calculated as (increased quantity/original quantity) × original delivery period, minimum 30 days.
  • Advance sample process: submit 2 samples within 7 days of award; approval or modification list provided within 7 days; bulk supply to follow approved sample.
  • Penalties/LDs: not specified in available data; contract allows for sample-based deviations and potential contract termination for major non-conformities.
  • Documents required: GST, PAN, experience certificates, financials, EMD documentation, technical compliance, OEM authorizations, and other bid submission materials as per standard terms.

Key Specifications

  • LED COB light 12W 3000K

  • LED COB light 9W 3000K

  • LED Candle bulb 5W Clear Glass 3000K

  • Key tag 2M 30Amp

  • PVC Tape

  • 3pin top 6 Amp

  • 3 pin top 15 or 16 Amp

  • Extension board 4+1 6 Amp

  • Light Remote with stand 4 way

  • Wall fan 400 mm

  • LED Bulkhead Light 20W 6500K

  • E27 10W Clear Glass bulb 3000/4000K

  • E14 Candle bulb 5W Clear Glass 3000/4000K

  • Standards/Compliance: Not specified in tender data

Terms & Conditions

  • Quantity variation up to 25% at contract stage with same rates

  • Advance sample approval required within 7 days of award

  • 2 samples to be submitted for buyer approval; modification list issued within 7 days

  • Delivery/extension period tied to original delivery order dates; minimum 30 days for extra time

  • EMD amount and specific submission documents to be provided per standard terms

Important Clauses

Payment Terms

Not specified in the data; typical government terms would apply post-approval of samples and delivery milestones

Delivery Schedule

Delivery period begins from last date of original delivery order; extended delivery time governed by option clause with 30-day minimum

Penalties/Liquidated Damages

No LD details provided; contract may terminate for major deviations from approved sample/specifications

Bidder Eligibility

  • Demonstrated experience in supplying lighting/electrical fittings to institutions

  • GST registered vendor with valid certifications

  • Ability to provide advance sample approval and adhere to delivery timelines

Authority & Contact

Office Name

India Tourism Development Corporation Limited

Grievance Contact

[email protected]

Reverse Auction Schedule

Upcoming

Start

08-Sep-2026, 3:00 pm

End

09-Sep-2026, 3:00 pm

Duration: 24 hours

Reverse Auction Document

⏳ RA scheduled. Ensure you are registered to participate.

Tender Data

Bid Details

Quantity

595

Category

LED COB light 12W 3000 K as per tender specfication

Bid Type

Two Packet Bid

Bid Validity

30 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

7 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

LED COB light 12W 3000 K as per tender specfication , LED COB light 9W 3000K as per tender specfication , LED Candle bulb 5W Clear Glass 3000K B-22 as per tender specfication , Key tag 2M 30Amp as per tender specification , PVC Tape as per tender specification , 3pin top 6 Amp as per tender specification , 3 pin top 15 or 16 Amp as per tender specification , Extension board 4 plus 1 6 Amp as per tender specification , Light Remote with stand 4 way as per tender specification , Wall fan 400 mm as per tender specification , LED Bulkhead Light 20 W 6500K as per tender specification , E 27 10W Clear Glass bulb 3000 or 4000 as per specification , E 14 Candle bulb 5W Clear Glass 3000 or 4000K as per specification

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

New Delhi

Delivery Pincodes

110021

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Malkeet Singh110021,Hotel Ashok, 50 B, Diplomatic Enclave, Chanakyapuri, Delhi, New DelhiNew DelhiDelhi1100214015-

Authority Records

MINISTRY OF TOURISMINDIA TOURISM DEVELOPMENT CORPORATION LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9692148.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 13 Items Sign in for GEM prices

#1

LED COB light 12W 3000 K as per tender specfication

LED COB light 12W 3000 K as per tender specfication

40 nos Delivery: 15 days
#2

LED COB light 9W 3000K as per tender specfication

LED COB light 9W 3000K as per tender specfication

20 nos Delivery: 15 days
#3

LED Candle bulb 5W Clear Glass 3000K B-22 as per tender specfication

LED Candle bulb 5W Clear Glass 3000K B-22 as per tender specfication

50 nos Delivery: 15 days
#4

Key tag 2M 30Amp as per tender specification

Key tag 2M 30Amp as per tender specification

10 nos Delivery: 15 days
#5

PVC Tape as per tender specification

PVC Tape as per tender specification

180 nos Delivery: 15 days
#6

3pin top 6 Amp as per tender specification

3pin top 6 Amp as per tender specification

40 nos Delivery: 15 days
#7

3 pin top 15 or 16 Amp as per tender specification

4 pin top 15 or 16 Amp as per tender specification

20 nos Delivery: 15 days
#8

Extension board 4 plus 1 6 Amp as per tender specification

Extension board 4 plus 1 6 Amp as per tender specification

5 nos Delivery: 15 days
#9

Light Remote with stand 4 way as per tender specification

Light Remote with stand 4 way as per tender specification

5 nos Delivery: 15 days
#10

Wall fan 400 mm as per tender specification

Wall fan 400 mm as per tender specification

5 nos Delivery: 15 days
#11

LED Bulkhead Light 20 W 6500K as per tender specification

LED Bulkhead Light 20 W 6500K as per tender specification

20 nos Delivery: 15 days
#12

E 27 10W Clear Glass bulb 3000 or 4000 as per specification

E 27 10W Clear Glass bulb 3000 or 4000 as per specification

100 nos Delivery: 15 days
#13

E 14 Candle bulb 5W Clear Glass 3000 or 4000K as per specification

E 14 Candle bulb 5W Clear Glass 3000 or 4000K

100 nos Delivery: 15 days

Categories 8

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar lighting/electrical supply

4

Financial statements (last 2-3 years)

5

EMD submission proof (amount not disclosed in tender data)

6

Technical bid documents demonstrating compliance with tender scope

7

OEM authorizations or Authorized distributor certificates

8

Any pre-bid/technical qualification certificates referenced in ATC

Frequently Asked Questions

Key insights about DELHI tender market

How to bid for LED lighting tender in South Delhi 2026 India Tourism Development Corporation?

Bidders must submit GST, PAN, experience certificates, financial statements, EMD evidence, OEM authorizations, and technical bid documents. The contract allows a 25% quantity variation and requires 2 advance samples within 7 days of award. Ensure compliance with sample approval timelines and delivery order terms.

What documents are required for South Delhi lighting tender submission 2026?

Required documents include GST certificate, PAN, company financials, at least 2 years of experience in similar lighting supply, and OEM authorization. Also provide EMD proof, technical bid, and any ATC-compliant certifications to demonstrate spec adherence.

What are the delivery terms for the LED lighting procurement in Delhi?

Delivery starts after the last delivery order date; if quantities increase, extended delivery is (increased/original) × original period with a minimum 30 days. Sample approval can adjust timelines; no LD details are specified in the available data.

What is the EMD requirement for this Delhi lighting tender 2026?

EMD amount is not disclosed in the tender data. Vendors should anticipate standard EMD practices and prepare payment mechanisms accordingly, ensuring readiness to submit when the formal notice specifies the amount and mode.

Which standards apply to LED lighting items in this procurement?

The tender data does not specify mandatory standards. Suppliers should ensure general quality for electrical fittings and be prepared to align with contract-specified framework, plus any future BOQ or ATC-derived standards.

How many samples must be submitted for advance approval in this tender?

The bidder must submit 2 samples within 7 days of contract award. The buyer will approve or request modifications within 7 days; failure to approve may lead to supply adjustments or contract termination at buyer's discretion.