Bid Publish Date
29-Aug-2026, 1:42 pm
Bid End Date
08-Sep-2026, 2:00 pm
Location
Progress
Option Clause: quantity may be increased up to 25% during contract; delivery extension proportional to quantity change with minimum 30 days
Delivery timeline: starts from last date of original delivery order; extensions follow the formula provided in the clause
ATC: Buyer has uploaded a Term & Conditions document; bidders must align with ATC specifics and any OEM requirements
Details not disclosed in data; expect standard defense procurement payment schedules aligned with delivery acceptance and milestone-based payments
Delivery periods governed by original order date; if quantity increases, extended duration calculated as (Increased quantity ÷ Original quantity) × Original delivery period with a minimum of 30 days
Not specified in available data; ATC may include LD or performance penalties in the final terms
Experience in supplying military-grade electrical/electronic components or spare parts
GST registration and valid PAN
Demonstrated financial stability (audited statements) for defense-scale procurement
Quantity
19
Category
SMPS
Bid Type
Two Packet Bid
Bid Validity
30 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
SMPS , Cooling Fan , Stud Diode 30A With Head Sink , Relay , Temperature Connector , Viraj 3 pin Male Connector , Temperature Toggle Switch , MCB , DC to DC Converter , Piston Ring , Gasket Set , Connection Fuel Pipe , Filter Air Intake , Pipe High Pressure , Fuel Filter Element Primary , Fuel Pipe Feed Pump Filter to Tank
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
West Kameng
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | West Kameng | West Kameng | - | - | 1 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
SMPS
Viraj Camera
Cooling Fan
Viraj Camera
Stud Diode 30A With Head Sink
Viraj Camera
Relay
Viraj Camera
Temperature Connector
Viraj Camera
Viraj 3 pin Male Connector
Viraj Camera
Temperature Toggle Switch
Viraj Camera
MCB
Viraj Camera
DC to DC Converter
Viraj Camera
Piston Ring
Viraj Camera
Gasket Set
Viraj Camera
Connection Fuel Pipe
Viraj Camera
Filter Air Intake
Viraj Camera
Pipe High Pressure
Viraj Camera
Fuel Filter Element Primary
Viraj Camera
Fuel Pipe Feed Pump Filter to Tank
Viraj Camera
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | SMPS | Viraj Camera | 1 | nos | qmclk@847 | 15 | |
| 2 | Cooling Fan | Viraj Camera | 1 | nos | qmclk@847 | 15 | |
| 3 | Stud Diode 30A With Head Sink | Viraj Camera | 1 | nos | qmclk@847 | 15 | |
| 4 | Relay | Viraj Camera | 1 | nos | qmclk@847 | 15 | |
| 5 | Temperature Connector | Viraj Camera | 1 | nos | qmclk@847 | 15 | |
| 6 | Viraj 3 pin Male Connector | Viraj Camera | 1 | nos | qmclk@847 | 15 | |
| 7 | Temperature Toggle Switch | Viraj Camera | 1 | nos | qmclk@847 | 15 | |
| 8 | MCB | Viraj Camera | 1 | nos | qmclk@847 | 15 | |
| 9 | DC to DC Converter | Viraj Camera | 1 | nos | qmclk@847 | 15 | |
| 10 | Piston Ring | Viraj Camera | 4 | nos | qmclk@847 | 15 | |
| 11 | Gasket Set | Viraj Camera | 1 | nos | qmclk@847 | 15 | |
| 12 | Connection Fuel Pipe | Viraj Camera | 1 | nos | qmclk@847 | 15 | |
| 13 | Filter Air Intake | Viraj Camera | 1 | nos | qmclk@847 | 15 | |
| 14 | Pipe High Pressure | Viraj Camera | 1 | nos | qmclk@847 | 15 | |
| 15 | Fuel Filter Element Primary | Viraj Camera | 1 | nos | qmclk@847 | 15 | |
| 16 | Fuel Pipe Feed Pump Filter to Tank | Viraj Camera | 1 | nos | qmclk@847 | 15 |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar items or projects
Financial statements (last 2-3 years)
EMD/Security deposit submission proof (as applicable)
Technical bid documents and compliance statements
OEM authorisation letters or dealers’ authorization
Any ATC-specific documents uploaded by Buyer
Key insights about ARUNACHAL PRADESH tender market
Bidders must submit GST and PAN, financials, experience certificates, and EMD proof. Review the uploaded ATC, ensure compliance with defense-grade components, and prepare OEM authorizations. The 25% quantity variation clause impacts pricing, delivery planning, and schedule risk management.
Submit GST certificate, PAN, 3-year financial statements, experience certificates for similar work, and EMD proof. Include security/operational authorization letters and OEM authorizations. Technical bid must demonstrate conformity to ATC terms and any ISI/IS 550-like standards referenced.
Delivery extensions apply if quantity increases; extended period equals (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum extension of 30 days. Extensions can span up to the original delivery period while applying the option clause.
While not explicit in the data, suppliers should anticipate ISI/ISI-mark compliance, ISO 9001 quality frameworks, and OEM certifications. ATC may specify additional requirements; verify with the buyer document to ensure compliant product submissions.
The BOQ lists 16 item categories spanning SMPS, cooling components, electrical connectors, relays, switches, MCBs, DC-DC converters, and fuel system parts. Specific quantities are not disclosed; bidders should prepare offers aligned with these categories and await detailed quantities in the ATC.
Exact submission deadlines are not provided in the available data. Bidders should monitor the GEM portal for the ATC-issued timeline, ensure timely submission of technical and financial bids, and align with the extended delivery clauses if quantities change.
Prepare unit-costs for each item with contingency pricing for variations. Include a robust delivery plan, risk-adjusted timelines, and standby capacity. The 25% clause requires pricing resilience and supply chain flexibility to avoid penalties on delayed deliveries.
Eligibility evidence includes GST, PAN, audited financials, experience certificates for similar items, OEM authorizations, and vendor compliance statements. Ensure the ATC-specific criteria are satisfied and provide any security clearances required by the buyer.