Progress
The Indian Army, Department Of Military Affairs, is inviting bids for a set of VTOL-related components including VTOL Snap parts, VTOL Arm Strengthening Sleeve, VTOL Arm End Cap, Battery Charging Cable, Communication Box Charging Cable, GPS Module Assembly, Thermal Payload Case, and Mid Wing Outboard Wing Connector Mount. The procurement scope specifies only the supply of goods with an estimated value and EMD not disclosed. The Buyer reserves a 25% quantity variation during contract placement and within the currency of the contract, with delivery time adjustments based on the calculated formula, ensuring a minimum of 30 days extra delivery time. Key differentiator is the breadth of VTOL components and OEM compatibility requirements. Unique aspects include consortium submission and a Data Sheet verification requirement. This tender targets suppliers capable of ISO 9001:2015-compliant manufacturing or OEM-level supply for defense-grade VTOL components.
VTOL Snap components (itemized by title)
VTOL Arm Strengthening Sleeve
VTOL Arm End Cap
Battery Charging Cable
Communication Box Charging Cable
GPS Module Assembly
Thermal Payload Case
Mid Wing Outboard Wing Connector Mount
Scope: Supply of Goods only; no installation
Confirm OEM/brand alignment with VTOL platform requirements
Deliverables must align with ISO 9001:2015 quality management
Up to 25% quantity variation at contract award and during currency
Delivery periods extendable via calculation formula with minimum 30 days
ISO 9001 certification required for bidder or OEM
Data Sheet verification mandatory with bid submission
End User Certificate to be provided in Buyer format
GST handling is on bidder's responsibility; reimbursement as actual or applicable rate, whichever lower, subject to quoted GST percentage
Delivery starts from last date of original delivery order; extended delivery time based on (Increased quantity ÷ Original quantity) × Original delivery period, min 30 days
No explicit LD details provided; standard defense procurement penalties may apply; refer to ATC if any
ISO 9001:2015 certified bidder or OEM required
Capability to supply defense-grade VTOL components (8 listed items)
Data Sheet accuracy and consistency with provided product specifications
Quantity
8
Category
VTOL Snap
Bid Type
Two Packet Bid
Bid Validity
90 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
VTOL Snap , VTOL Arm Strengthening Sleeve , VTOL Arm End Cap , Battery Charging Cable , Communication Box Charging Cable , GPS Module Assembly , Thermal Payload Case , Mid Wing Outboard Wing Connector Mount
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Ambala
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Ambala | Ambala | - | - | 1 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
VTOL Snap
VTOL Snap
VTOL Arm Strengthening Sleeve
VTOL Arm Strengthening Sleeve
VTOL Arm End Cap
VTOL Arm End Cap
Battery Charging Cable
Battery Charging Cable
Communication Box Charging Cable
Communication Box Charging Cable
GPS Module Assembly
GPS Module Assembly
Thermal Payload Case
Thermal Payload Case
Mid Wing Outboard Wing Connector Mount
Mid Wing Outboard Wing Connector Mount
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | VTOL Snap | VTOL Snap | 1 | pieces | oictss104 | 15 | |
| 2 | VTOL Arm Strengthening Sleeve | VTOL Arm Strengthening Sleeve | 1 | pieces | oictss104 | 15 | |
| 3 | VTOL Arm End Cap | VTOL Arm End Cap | 1 | pieces | oictss104 | 15 | |
| 4 | Battery Charging Cable | Battery Charging Cable | 1 | pieces | oictss104 | 15 | |
| 5 | Communication Box Charging Cable | Communication Box Charging Cable | 1 | pieces | oictss104 | 15 | |
| 6 | GPS Module Assembly | GPS Module Assembly | 1 | pieces | oictss104 | 15 | |
| 7 | Thermal Payload Case | Thermal Payload Case | 1 | pieces | oictss104 | 15 | |
| 8 | Mid Wing Outboard Wing Connector Mount | Mid Wing Outboard Wing Connector Mount | 1 | pieces | oictss104 | 15 |
Copy of PAN Card
Copy of GSTIN
Copy of Cancelled Cheque
Copy of EFT Mandate certified by Bank
ISO 9001 certificate (bidder or OEM)
Data Sheet of offered products
End User Certificate in Buyer’s format
Consortium undertaking (if applicable)
Key insights about HARYANA tender market
Bidders must ensure ISO 9001 certification, submit Data Sheets for all eight VTOL items, provide PAN, GSTIN, Cancelled Cheque, and EFT Mandate certified by bank. Include End User Certificate in Buyer format and, if applicable, consortium undertaking. Adhere to 25% quantity variation terms and compute delivery extensions accordingly.
Required documents include PAN Card, GSTIN, Cancelled Cheque, EFT Mandate, ISO 9001 certification, Data Sheets for each offered item, and End User Certificate. Consortium undertakings must be attached if multiple vendors bid together, with a clear leader.
Bidders must ensure ISO 9001:2015 quality management compliance for the bidder or OEM. Data Sheets must reflect product specifications; mismatches can lead to rejection. No other standards are explicitly stated in the tender data.
Delivery extensions apply when the quantity varies up to 25% during contract execution. The additional delivery time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days added to the original schedule.
Scope specifies 'Only supply of Goods' for eight VTOL items, with no installation or services included. Ensure all items are supplied as complete Data Sheets and OEM-aligned components to meet procurement requirements.
GST is the bidder’s responsibility; reimbursement is provided at actuals or applicable rate (whichever is lower), capped to the quoted GST percentage. Calculate GST implications during bid pricing and ensure GSTIN validity.
Data Sheet mismatch can lead to bid rejection. Ensure precise alignment between Data Sheets and product specifications; cross-verify part numbers, dimensions, and OEM references before submission.
If forming a consortium, one leader must be identified; all members share equal responsibility for execution. An undertaking confirming this arrangement must be uploaded with the bid, and Data Sheet integrity remains essential.