Tender Overview

The Indian Army, Department of Military Affairs, invites bids for a Cooling Unit for Cooling Room of 2.5 TON to be deployed in Aurangabad, Maharashtra (PIN 423701). The tender encompasses Supply, Installation, Testing and Commissioning of the cooling system with the potential for quantity variation up to 25% during contract execution. Bidders must account for all costs in the bid price, including delivery, installation, and commissioning. The option clause governs how extensions or reductions in quantity affect delivery timelines, with a minimum additional period of 30 days. The procurement aims to modernize or augment cooling capacity for defense use, under government GEM channels, with delivery terms tied to order placement and extended periods.

Technical Specifications & Requirements

  • Product/Service: Cooling Unit for Cooling Room, 2.5 TON capacity
  • Scope: Supply, Installation, Testing and Commissioning of the cooling equipment
  • Location: Aurangabad, Maharashtra 423701; procurement under Indian Army
  • Delivery/Timeline: Delivery period starts from the last date of the original delivery order; option to extend delivery within contract terms; minimum extended period is 30 days if required
  • Quantity: Up to 25% increase/decrease during contract; exact quantity not disclosed in data
  • BoQ: Not available; no specific itemized list provided
  • Compliance: No explicit standards listed in data; bidders must align with Army procurement expectations
  • Differentiator: The option clause enables flexible quantity management at contracted rates
  • Context: Part of government cooling infrastructure upgrades for military facilities

Terms, Conditions & Eligibility

  • EMD: Not specified in data; bidders should prepare as per standard GEM terms
  • Scope of Supply: Bid price must cover Supply, Installation, Testing and Commissioning of the cooling unit
  • Quantity Flexibility: Up to 25% increase/decrease during contract; additional time calculated by formula: (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days
  • Delivery & Payment Terms: Delivery schedule tied to order dates; payment terms not detailed in available data
  • Documents: Typical submissions include GST, PAN, experience certificates, financial statements, OEM authorizations, and technical bids; exact list not specified in data
  • Warranty/Support: Not specified in data; bidders should anticipate standard defense procurement warranties and AMC considerations
  • Penalties: Not specified; propose standard performance penalties aligned with government contracts

Key Specifications

    • Product/service name: Cooling Unit for Cooling Room
    • Capacity: 2.5 TON cooling capacity
    • Scope: Supply, Installation, Testing and Commissioning of the cooling unit
    • Location/Context: Aurangabad, Maharashtra under Indian Army procurement
    • Quantity flexibility: Option to increase/decrease up to 25% during contract; delivery period adjustments per clause

Terms & Conditions

  • Key Term 1: Option clause allows ±25% quantity variation with corresponding delivery time adjustments

  • Key Term 2: Scope of supply includes Supply, Installation, Testing and Commissioning

  • Key Term 3: Delivery period begins from the last date of original delivery order; minimum extension rule of 30 days

Important Clauses

Delivery Terms

Delivery period commences from the last date of the original delivery order; extended periods apply if quantity increases, using the formula (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days

Option Clause

Purchaser may increase/decrease quantity up to 25% at contract placement and during currency of contract at contracted rates

Supply Scope

Bid price to include all costs for Supply, Installation, Testing and Commissioning of the cooling unit

Bidder Eligibility

  • Experience in supplying and installing cooling systems for defense/local government facilities

  • Capability to supply and commission a 2.5 TON cooling unit

  • Financial stability and ability to meet installation and commissioning requirements

Advertisement

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Tender Data

Bid Details

Quantity

1

Bid Type

Two Packet Bid

Bid Validity

60 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

125

OEM Avg. Turnover

10

Past Performance

50 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

COOLING UNIT FOR COOLING ROOM OF 2.5 TON

Pre-Bid & Qualification

Pre-Bid Date

07-10-2026 12:00:00

Pre-Bid Venue

Military Station, Ch. Sambhajinagar

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

Aurangabad

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-AurangabadAurangabad--115-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 3

GeM-Bidding-9978056.pdf

Main Document

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Annual Turnover

6

Additional Doc 1 (Requested in ATC)

7

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

8

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Frequently Asked Questions

Key insights about MAHARASHTRA tender market

How to bid on the cooling unit tender in Aurangabad Maharashtra 2026?

Bidders must prepare a bid covering Supply, Installation, Testing and Commissioning of the 2.5 TON cooling unit. Include relevant documents (GST, PAN, experience). The tender allows up to 25% quantity variation with delivery timelines computed per clause; ensure readiness for extended delivery periods and contract rates.

What documents are required for the Indian Army cooling equipment bid 2026?

Submit standard government bid documents: GST certificate, PAN card, experience certificates, financial statements, OEM authorizations, technical bid documents, EMD security if applicable. While exact EMD not specified, prepare a security deposit per GEM guidelines and include installation/comissioning plans.

What are the key technical requirements for the 2.5 TON cooling unit tender

The tender requires a 2.5 TON cooling unit with scope to supply, install, test and commission. While no standards are listed, bidders should ensure robust performance, reliable installation capabilities, and military-grade installation services consistent with defense procurement norms.

When is the delivery deadline for the Aurangabad cooling unit procurement 2026?

Delivery timing is linked to the last date of the original delivery order; if quantity increases under the option clause, the extended delivery time uses the specified formula with a minimum 30 days. Exact final deadlines will be stated in the order; plan for potential extensions.

What are the payment terms for the Indian Army cooling unit contract 2026

Payment terms are not detailed in the available data. Prepare for standard GEM/defense practices, typically milestone-based payments tied to delivery, installation, and commissioning; ensure clarity on advance and final payment terms in the bid response to avoid disputes.

What is the scope of supply for the 2.5 TON cooling unit tender in Maharashtra?

The scope includes Supply, Installation, Testing and Commissioning of the cooling unit. Bidders must include all costs in the bid price; ensure logistics for installation near defense facilities, and provide commissioning support to meet Army operational requirements.