Bid Publish Date
05-Sep-2026, 4:00 pm
Bid End Date
16-Sep-2026, 4:00 pm
Location
Progress
The opportunity is issued by the Indian Army (Department Of Military Affairs) for a package of security and electrical components, including items such as Armature, Battery Cut Off Switch, Solenoid, Brush Carrier Assembly, Change Over Switch, Horn, Regulator Assy 12 V, and related Reliability parts. Located in Aurangabad, Maharashtra 423701, this procurement references a multi-item BOQ with 17 total items and a broad category mix across electrical and mechanical assemblies. The anticipated scope is defined by the project’s 17-line Bill of Quantities (N/A for item specifics in the data) and the requirement for vendors to complete registration steps for Vendor Code creation. The distinguishing factors include the military procurement context, the need to upload standard corporate documents, and ATC/Corrigendum adherence. A pre-bid sample might be requested two days prior to bid opening. Bidders should prepare for formal, credential-based submission in compliance with Army procurement practices and documented terms. The opportunity is location-specific and requires compliance with the Government of India procurement framework and Army-specific vendor onboarding.
Armature, Battery Cut Off Switch, Solenoid, Brush Carrier Assembly, Change Over Switch, Horn, Regulator Assembly 12 V, P A system Amplifier, Weather Strip, Field Coil Assembly
17 total items in BOQ; specific quantities not disclosed (N/A in provided data)
Vendor Code creation requires PAN, GSTIN, cancelled cheque, EFT mandate
No explicit technical standards or IS/ISO codes listed in data
Sample/submission prerequisites may be requested 2 days before bid opening
EMD and payment terms not disclosed; verify in official ATC
Documents for bid: PAN, GST, cancelled cheque, EFT mandate
Vendor Code creation mandatory; no liquidation or bankruptcy
Pre-bid sample may be required 2 days prior to bid opening
Details to be provided in official ATC; ensure bank EFT mandate is certified
Not specified; Army procurement terms to govern delivery timelines post order
Not specified in data; standard Govt of India procurement penalties may apply per ATC
Not under liquidation or bankruptcy; provide undertaking
Must upload PAN, GST, cancelled cheque, EFT mandate
Vendor Code creation readiness and ability to supply security equipment components
Quantity
28
Category
Armature
Bid Type
Two Packet Bid
Bid Validity
90 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Past Performance
40 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Armature , Battery Cut Off Switch , Solenoid , Brush Carrier Assy , Change Over Switch , Horn , Ruibber Bush Upper , Regulator Assy 12 v , Repair Kit Drying and Distributtion Unit , P A sysdtem Amplifiere , TFF Micke , Hoter Siren , Bushing Sleeve , Reglator sr 60 24v , Fuel Supply Tube , Weather Strip W Strip Back Window Side , Field Coil Assy
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Aurangabad
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Aurangabad | Aurangabad | - | - | 5 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Armature
Armature
Battery Cut Off Switch
Battery Cut Off Switch
Solenoid
Solenoid
Brush Carrier Assy
Brush Carrier Assy
Change Over Switch
Change Over Switch
Horn
Horn
Ruibber Bush Upper
Ruibber Bush Upper
Regulator Assy 12 v
Regulator Assy 12 v
Repair Kit Drying and Distributtion Unit
Repair Kit Drying and Distributtion Unit
P A sysdtem Amplifiere
P A sysdtem Amplifiere
TFF Micke
TFF Micke
Hoter Siren
Hoter Siren
Bushing Sleeve
Bushing Sleeve
Reglator sr 60 24v
Reglator sr 60 24v
Fuel Supply Tube
Fuel Supply Tube
Weather Strip W Strip Back Window Side
Weather Strip W Strip Back Window Side
Field Coil Assy
Field Coil Assy
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Armature | Armature | 5 | pieces | [email protected] | 15 | |
| 2 | Battery Cut Off Switch | Battery Cut Off Switch | 2 | pieces | [email protected] | 15 | |
| 3 | Solenoid | Solenoid | 1 | pieces | [email protected] | 15 | |
| 4 | Brush Carrier Assy | Brush Carrier Assy | 2 | pieces | [email protected] | 15 | |
| 5 | Change Over Switch | Change Over Switch | 2 | pieces | [email protected] | 15 | |
| 6 | Horn | Horn | 1 | pieces | [email protected] | 15 | |
| 7 | Ruibber Bush Upper | Ruibber Bush Upper | 1 | pieces | [email protected] | 15 | |
| 8 | Regulator Assy 12 v | Regulator Assy 12 v | 1 | pieces | [email protected] | 15 | |
| 9 | Repair Kit Drying and Distributtion Unit | Repair Kit Drying and Distributtion Unit | 2 | pieces | [email protected] | 15 | |
| 10 | P A sysdtem Amplifiere | P A sysdtem Amplifiere | 1 | pieces | [email protected] | 15 | |
| 11 | TFF Micke | TFF Micke | 1 | pieces | [email protected] | 15 | |
| 12 | Hoter Siren | Hoter Siren | 1 | pieces | [email protected] | 15 | |
| 13 | Bushing Sleeve | Bushing Sleeve | 3 | pieces | [email protected] | 15 | |
| 14 | Reglator sr 60 24v | Reglator sr 60 24v | 1 | pieces | [email protected] | 15 | |
| 15 | Fuel Supply Tube | Fuel Supply Tube | 1 | pieces | [email protected] | 15 | |
| 16 | Weather Strip W Strip Back Window Side | Weather Strip W Strip Back Window Side | 1 | pieces | [email protected] | 15 | |
| 17 | Field Coil Assy | Field Coil Assy | 2 | pieces | [email protected] | 15 |
Discover companies most likely to bid on this tender
PAN Card copy
GSTIN copy
Cancelled Cheque copy
EFT Mandate copy certified by bank
Bidder undertaking on financial standing (no liquidation/bankruptcy)
Certificates/documents required by Bid Document, ATC and Corrigendum
OEM authorizations (if required by terms)
Key insights about MAHARASHTRA tender market
To bid, register for Vendor Code creation, upload PAN, GSTIN, cancelled cheque, and an EFT mandate certified by your bank. Ensure you meet the Army's onboarding requirements and submit all certificates listed in the Bid Document/ATC to avoid rejection.
Submit PAN Card, GSTIN, Cancelled Cheque, and an EFT Mandate certified by your bank. Include the vendor financial standing undertaking and any certificates requested by the Bid Document or ATC; non-submission may lead to disqualification.
The tender lists items including Armature, Battery Cut Off Switch, Solenoid, Regulator Assembly 12 V, and related parts, but does not provide explicit measurements or standards in the data. Bidders should await official ATC for exact model numbers, ratings, and compatibility requirements.
Exact bid opening date is not provided in the data. A sample may be requested two days before bid opening; bidders should monitor the official portal and ATC for the precise timeline and submission windows.
EMD details are not disclosed in the available data. Check the official tender documents (ATC) for the exact EMD amount, payment method, and eligibility criteria to avoid disqualification.
Upload PAN, GST, Cancelled Cheque, and EFT Mandate certified by the bank. Ensure you are not under liquidation or bankruptcy; provide an undertaking confirming financial standing as part of the registration process.