TenderDekho Logo
GEM

Cochin Shipyard Ltd GEM Tender 2026 Procurement of Goods Services Kochi Kerala with 25% Quantity Option Clause 2026

Bid Publish Date

10-Jun-2026, 8:41 am

Bid End Date

16-Jul-2026, 3:00 pm

Generate Docs

Progress

Issue10-Jun-2026, 8:41 am
Corrigendum09-Jul-2026
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

372

Category

DISTRIBUTION BOARD TYPE 4116A BY 531

Bid Type

Two Packet Bid

Categories 10

Tender Overview

Organization: Cochin Shipyard Ltd; Department: Department Of Public Enterprises; Location: Kochi, Kerala; Product/Service: Government procurement through GeM with 96 BOQ items (N/A specifications listed); Estimated Value: Not disclosed; EMD: Not disclosed. The tender includes an option clause allowing ±25% quantity variation at contract award and during the contract period, with delivery timing linked to the original delivery schedule. Bidders must adhere to GST and vendor-code requirements, and arrange participation through GeM with required registrations. Acknowledgement of integrity pact and post-award material inspection are specified. Unique aspects include potential six-month post-order supply postponement at no extra cost and mandatory supplier registration with Cochin Shipyard prior to bid opening.

Technical Specifications & Requirements

  • Documentation and onboarding: PAN Card copy, GSTIN copy, Cancelled Cheque copy, EFT Mandate copy (certified by bank) for vendor-code creation; Integrity Pact upload; GST invoice via GeM portal with GST payment screenshot; must be registered/empa­nnelled with Cochin Shipyard for the required goods/services category.
  • Quality and safety: Non-toxic materials; if toxic materials are used, provide Material Safety Data Sheet (MSDS).
  • Inspection: Receipt inspection by Buyer QC team or nominated external agency at yard.
  • Delivery/activation: Option clause permits quantity increase up to 25% and extended delivery period calculations; minimum 30 days if extended period applies.
  • Compliance: Delivery terms, GST reimbursement guidance, and post-order schedule adjustment built into terms.

Terms, Conditions & Eligibility

  • EMD and price terms: Not disclosed; GST applicability to be self-ascertained by bidder; GST invoicing must be uploaded on GeM with payment screenshot.
  • Delivery: Delivery timing linked to last date of original delivery order; option-adjusted time calculated as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days.
  • Registration: Bidders must be registered/empanelled/enlisted with Cochin Shipyard for the required goods/services at bid opening; prospective bidders should obtain registration prior to opening.
  • Integrity Pact: Upload signed Integrity Pact per buyer policy.
  • Post-order flexibility: Purchaser may postpone material supply by up to 6 months without extra cost after finalization.
  • Safety: Products must be non-toxic; MSDS required for toxic items.

Key Specifications

    • Product/service names: not specified in tender data; scope inferred from 96 BOQ items (N/A details)
    • Quantities: 25% quantity variation allowed; specific quantities not disclosed
    • EMD/Estimated value: not disclosed
    • Standards/certifications: not specified in tender data
    • Delivery: base delivery period referenced; extended period calculation formula provided
    • Inspection: yard receipt inspection by QC or external agency

Terms & Conditions

  • Option clause allows ±25% quantity variation at award and during contract with calculated extension

  • GST to be checked by bidder; GST reimbursement as actuals or applicable rate, whichever is lower

  • Vendor-code creation requires PAN, GSTIN, cancelled cheque, EFT mandate; Integrity Pact mandatory

  • Must be registered/empa­nnelled with Cochin Shipyard before bid opening; post-order postponement up to 6 months

Important Clauses

Payment Terms

GST applicability to be self-assessed by bidder; GST invoice uploaded on GeM with GST portal payment screenshot

Delivery Schedule

Delivery period starts from last date of original delivery order; option period calculated by (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days

Penalties/Liquidated Damages

Not specified

Bidder Eligibility

  • Must be registered/enlisted with Cochin Shipyard for required goods/services

  • Must upload signed Integrity Pact

  • Must provide PAN, GSTIN, Cancelled Cheque, and EFT Mandate for vendor-code creation

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Authority Records

MINISTRY OF PORTS, SHIPPING AND WATERWAYSPUBLIC ENTERPRISES DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-9436565.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

AC Distribution Board 1,AC Distribution Board 2,AC Distribution Board 3,AC Distribution Board 4,AC

Kerala State Electricity Board (kseb)

THIRUVANANTHAPURAM, KERALA

Posted: 6 November 2025
Closed: 25 November 2025
GEM

POWER DISTRIBUTION BOARD

Cochin Shipyard Ltd

ERNAKULAM, KERALA

Posted: 17 February 2025
Closed: 22 March 2025
GEM

BOARD, DISTRIBUTION

Durgapur Steel Plant

BARDHAMAN, WEST BENGAL

Posted: 22 April 2025
Closed: 7 May 2025
GEM

ITEM_ 10_ M8548306877_ 30004402_ Distribution Board

Ntpc Limited

BILASPUR, CHHATTISGARH

Posted: 11 March 2025
Closed: 21 March 2025
GEM

Bids are Invited For SUPPLY OF DISTRIBUTION BOARD in MUMBAI, MAHARASHTRA

N/A

MUMBAI, MAHARASHTRA

Posted: 9 November 2020
Closed: 1 December 2020
EPROCURE

Bill of Quantities (BOQ) 96 Items Sign in for GEM prices

#1

DISTRIBUTION BOARD TYPE 4116A BY 531

DISTRIBUTION BOARD TYPE 4116A BY 531

10 set Delivery: 240 days
#2

DISTRIBUTION BOARD TYPE 4116AE BY 531

DISTRIBUTION BOARD TYPE 4116AE BY 531

1 set Delivery: 240 days
#3

DISTRIBUTION BOARD TYPE 4116AV BY 531

DISTRIBUTION BOARD TYPE 4116AV BY 531

4 set Delivery: 240 days
#4

DISTRIBUTION BOARD TYPE 4218AW BY 531

DISTRIBUTION BOARD TYPE 4218AW BY 531

2 set Delivery: 240 days
#5

DISTRIBUTION BOARD TYPE 4106A BY 531

DISTRIBUTION BOARD TYPE 4106A BY 531

1 set Delivery: 240 days
#6

DISTRIBUTION BOARD TYPE 2115A BY 531

DISTRIBUTION BOARD TYPE 2115A BY 531

3 set Delivery: 240 days
#7

DISTRIBUTION BOARD TYPE 2110D BY 531

DISTRIBUTION BOARD TYPE 2110D BY 531

1 set Delivery: 240 days
#8

DISTRIBUTION BOARD TYPE 2118B BY 531

DISTRIBUTION BOARD TYPE 2118B BY 531

4 set Delivery: 240 days
#9

DISTRIBUTION BOARD TYPE 2130BW BY 531

DISTRIBUTION BOARD TYPE 2130BW BY 531

2 set Delivery: 240 days
#10

DISTRIBUTION BOARD TYPE 2130B BY 531

DISTRIBUTION BOARD TYPE 2130B BY 531

8 set Delivery: 240 days
#11

DISTRIBUTION BOARD TYPE 2109B BY 531

DISTRIBUTION BOARD TYPE 2109B BY 531

2 set Delivery: 240 days
#12

DISTRIBUTION BOARD TYPE 2130BH BY 531

DISTRIBUTION BOARD TYPE 2130BH BY 531

2 set Delivery: 240 days
#13

DISTRIBUTION BOARD TYPE 2121D BY 531

DISTRIBUTION BOARD TYPE 2121D BY 531

4 set Delivery: 240 days
#14

DISTRIBUTION BOARD TYPE 2125BE BY 531

DISTRIBUTION BOARD TYPE 2125BE BY 531

6 set Delivery: 240 days
#15

DISTRIBUTION BOARD TYPE 2124B BY 531

DISTRIBUTION BOARD TYPE 2124B BY 531

3 set Delivery: 240 days
#16

DISTRIBUTION BOARD TYPE 2115B BY 531

DISTRIBUTION BOARD TYPE 2115B BY 531

1 set Delivery: 240 days
#17

LIGHT SWITCH PANEL BY 531

LIGHT SWITCH PANEL BY 531

1 set Delivery: 240 days
#18

EMERGENCY SHUTDOWN SYSTEM BY 531

EMERGENCY SHUTDOWN SYSTEM BY 531

1 set Delivery: 240 days
#19

GALLEY ISOLATION SWITCH INCLUDING INDICATION PANEL BY 531

GALLEY ISOLATION SWITCH INCLUDING INDICATION PANEL BY 531

1 set Delivery: 240 days
#20

ON BOARD SPARES FOR PANELS BY 531

ON BOARD SPARES FOR PANELS BY 531

1 set Delivery: 240 days
#21

INSTALLATION_COMMISSIONING SPARES FOR PANELS BY 531

INSTALLATION_COMMISSIONING SPARES FOR PANELS BY 531

1 set Delivery: 240 days
#22

DOCUMENTATION FOR PANELS BY 531

DOCUMENTATION FOR PANELS BY 531

1 set Delivery: 240 days
#23

TRAINING BY 531

TRAINING BY 531

1 au Delivery: 240 days
#24

INSTALLATION_COMMISSIONING BY 531

INSTALLATION_COMMISSIONING BY 531

1 au Delivery: 240 days
#25

DISTRIBUTION BOARD TYPE 4116A BY 532

DISTRIBUTION BOARD TYPE 4116A BY 532

10 set Delivery: 480 days
#26

DISTRIBUTION BOARD TYPE 4116AE BY 532

DISTRIBUTION BOARD TYPE 4116AE BY 532

1 set Delivery: 480 days
#27

DISTRIBUTION BOARD TYPE 4116AV BY 532

DISTRIBUTION BOARD TYPE 4116AV BY 532

4 set Delivery: 480 days
#28

DISTRIBUTION BOARD TYPE 4218AW BY 532

DISTRIBUTION BOARD TYPE 4218AW BY 532

2 set Delivery: 480 days
#29

DISTRIBUTION BOARD TYPE 4106A BY 532

DISTRIBUTION BOARD TYPE 4106A BY 532

1 set Delivery: 480 days
#30

DISTRIBUTION BOARD TYPE 2115A BY 532

DISTRIBUTION BOARD TYPE 2115A BY 532

3 set Delivery: 480 days
#31

DISTRIBUTION BOARD TYPE 2110D BY 532

DISTRIBUTION BOARD TYPE 2110D BY 532

1 set Delivery: 480 days
#32

DISTRIBUTION BOARD TYPE 2118B BY 532

DISTRIBUTION BOARD TYPE 2118B BY 532

4 set Delivery: 480 days
#33

DISTRIBUTION BOARD TYPE 2130BW BY 532

DISTRIBUTION BOARD TYPE 2130BW BY 532

2 set Delivery: 480 days
#34

DISTRIBUTION BOARD TYPE 2130B BY 532

DISTRIBUTION BOARD TYPE 2130B BY 532

8 set Delivery: 480 days
#35

DISTRIBUTION BOARD TYPE 2109B BY 532

DISTRIBUTION BOARD TYPE 2109B BY 532

2 set Delivery: 480 days
#36

DISTRIBUTION BOARD TYPE 2130BH BY 532

DISTRIBUTION BOARD TYPE 2130BH BY 532

2 set Delivery: 480 days
#37

DISTRIBUTION BOARD TYPE 2121D BY 532

DISTRIBUTION BOARD TYPE 2121D BY 532

4 set Delivery: 480 days
#38

DISTRIBUTION BOARD TYPE 2125BE BY 532

DISTRIBUTION BOARD TYPE 2125BE BY 532

6 set Delivery: 480 days
#39

DISTRIBUTION BOARD TYPE 2124B BY 532

DISTRIBUTION BOARD TYPE 2124B BY 532

3 set Delivery: 480 days
#40

DISTRIBUTION BOARD TYPE 2115B BY 532

DISTRIBUTION BOARD TYPE 2115B BY 532

1 set Delivery: 480 days
#41

LIGHT SWITCH PANEL BY 532

LIGHT SWITCH PANEL BY 532

1 set Delivery: 480 days
#42

EMERGENCY SHUTDOWN SYSTEM BY 532

EMERGENCY SHUTDOWN SYSTEM BY 532

1 set Delivery: 480 days
#43

GALLEY ISOLATION SWITCH INCLUDING INDICATION PANEL BY 532

GALLEY ISOLATION SWITCH INCLUDING INDICATION PANEL BY 532

1 set Delivery: 480 days
#44

ON BOARD SPARES FOR PANELS BY 532

ON BOARD SPARES FOR PANELS BY 532

1 set Delivery: 480 days
#45

INSTALLATION_COMMISSIONING SPARES FOR PANELS BY 532

INSTALLATION_COMMISSIONING SPARES FOR PANELS BY 532

1 set Delivery: 480 days
#46

DOCUMENTATION FOR PANELS BY 532

DOCUMENTATION FOR PANELS BY 532

1 set Delivery: 480 days
#47

TRAINING BY 532

TRAINING BY 532

1 au Delivery: 480 days
#48

INSTALLATION_COMMISSIONING BY 532

INSTALLATION_COMMISSIONING BY 532

1 au Delivery: 480 days
#49

DISTRIBUTION BOARD TYPE 4116A BY 533_BY 534

DISTRIBUTION BOARD TYPE 4116A BY 533_BY 534

20 set Delivery: 630 days
#50

DISTRIBUTION BOARD TYPE 4116AE BY 533_BY 534

DISTRIBUTION BOARD TYPE 4116AE BY 533_BY 534

2 set Delivery: 630 days
#51

DISTRIBUTION BOARD TYPE 4116AV BY 533_BY 534

DISTRIBUTION BOARD TYPE 4116AV BY 533_BY 534

8 set Delivery: 630 days
#52

DISTRIBUTION BOARD TYPE 4218AW BY 533_BY 534

DISTRIBUTION BOARD TYPE 4218AW BY 533_BY 534

4 set Delivery: 630 days
#53

DISTRIBUTION BOARD TYPE 4106A BY 533_BY 534

DISTRIBUTION BOARD TYPE 4106A BY 533_BY 534

2 set Delivery: 630 days
#54

DISTRIBUTION BOARD TYPE 2115A BY 533_BY 534

DISTRIBUTION BOARD TYPE 2115A BY 533_BY 534

6 set Delivery: 630 days
#55

DISTRIBUTION BOARD TYPE 2110D BY 533_BY 534

DISTRIBUTION BOARD TYPE 2110D BY 533_BY 534

2 set Delivery: 630 days
#56

DISTRIBUTION BOARD TYPE 2118B BY 533_BY 534

DISTRIBUTION BOARD TYPE 2118B BY 533_BY 534

8 set Delivery: 630 days
#57

DISTRIBUTION BOARD TYPE 2130BW BY 533_BY 534

DISTRIBUTION BOARD TYPE 2130BW BY 533_BY 534

4 set Delivery: 630 days
#58

DISTRIBUTION BOARD TYPE 2130B BY 533_BY 534

DISTRIBUTION BOARD TYPE 2130B BY 533_BY 534

16 set Delivery: 630 days
#59

DISTRIBUTION BOARD TYPE 2109B BY 533_BY 534

DISTRIBUTION BOARD TYPE 2109B BY 533_BY 534

4 set Delivery: 630 days
#60

DISTRIBUTION BOARD TYPE 2130BH BY 533_BY 534

DISTRIBUTION BOARD TYPE 2130BH BY 533_BY 534

4 set Delivery: 630 days
#61

DISTRIBUTION BOARD TYPE 2121D BY 533_BY 534

DISTRIBUTION BOARD TYPE 2121D BY 533_BY 534

8 set Delivery: 630 days
#62

DISTRIBUTION BOARD TYPE 2125BE BY 533_BY 534

DISTRIBUTION BOARD TYPE 2125BE BY 533_BY 534

12 set Delivery: 630 days
#63

DISTRIBUTION BOARD TYPE 2124B BY 533_BY 534

DISTRIBUTION BOARD TYPE 2124B BY 533_BY 534

6 set Delivery: 630 days
#64

DISTRIBUTION BOARD TYPE 2115B BY 533_BY 534

DISTRIBUTION BOARD TYPE 2115B BY 533_BY 534

2 set Delivery: 630 days
#65

LIGHT SWITCH PANEL BY 533_BY 534

LIGHT SWITCH PANEL BY 533_BY 534

2 set Delivery: 630 days
#66

EMERGENCY SHUTDOWN SYSTEM BY 533_BY 534

EMERGENCY SHUTDOWN SYSTEM BY 533_BY 534

2 set Delivery: 630 days
#67

GALLEY ISOLATION SWITCH INCLUDING INDICATION PANEL BY 533_BY 534

GALLEY ISOLATION SWITCH INCLUDING INDICATION PANEL BY 533_BY 534

2 set Delivery: 630 days
#68

ON BOARD SPARES FOR PANELS BY 533_BY 534

ON BOARD SPARES FOR PANELS BY 533_BY 534

2 set Delivery: 630 days
#69

INSTALLATION_COMMISSIONING SPARES FOR PANELS BY 533_BY 534

INSTALLATION_COMMISSIONING SPARES FOR PANELS BY 533_BY 534

2 set Delivery: 630 days
#70

DOCUMENTATION FOR PANELS BY 533_BY 534

DOCUMENTATION FOR PANELS BY 533_BY 534

2 set Delivery: 630 days
#71

TRAINING BY 533_BY 534

TRAINING BY 533_BY 534

2 au Delivery: 630 days
#72

INSTALLATION_COMMISSIONING BY 533_BY 534

INSTALLATION_COMMISSIONING BY 533_BY 534

2 au Delivery: 630 days
#73

DISTRIBUTION BOARD TYPE 4116A BY 535_BY 536

DISTRIBUTION BOARD TYPE 4116A BY 535_BY 536

20 set Delivery: 780 days
#74

DISTRIBUTION BOARD TYPE 4116AE BY 535_BY 536

DISTRIBUTION BOARD TYPE 4116AE BY 535_BY 536

2 set Delivery: 780 days
#75

DISTRIBUTION BOARD TYPE 4116AV BY 535_BY 536

DISTRIBUTION BOARD TYPE 4116AV BY 535_BY 536

8 set Delivery: 780 days
#76

DISTRIBUTION BOARD TYPE 4218AW BY 535_BY 536

DISTRIBUTION BOARD TYPE 4218AW BY 535_BY 536

4 set Delivery: 780 days
#77

DISTRIBUTION BOARD TYPE 4106A BY 535_BY 536

DISTRIBUTION BOARD TYPE 4106A BY 535_BY 536

2 set Delivery: 780 days
#78

DISTRIBUTION BOARD TYPE 2115A BY 535_BY 536

DISTRIBUTION BOARD TYPE 2115A BY 535_BY 536

6 set Delivery: 780 days
#79

DISTRIBUTION BOARD TYPE 2110D BY 535_BY 536

DISTRIBUTION BOARD TYPE 2110D BY 535_BY 536

2 set Delivery: 780 days
#80

DISTRIBUTION BOARD TYPE 2118B BY 535_BY 536

DISTRIBUTION BOARD TYPE 2118B BY 535_BY 536

8 set Delivery: 780 days
#81

DISTRIBUTION BOARD TYPE 2130BW BY 535_BY 536

DISTRIBUTION BOARD TYPE 2130BW BY 535_BY 536

4 set Delivery: 780 days
#82

DISTRIBUTION BOARD TYPE 2130B BY 535_BY 536

DISTRIBUTION BOARD TYPE 2130B BY 535_BY 536

16 set Delivery: 780 days
#83

DISTRIBUTION BOARD TYPE 2109B BY 535_BY 536

DISTRIBUTION BOARD TYPE 2109B BY 535_BY 536

4 set Delivery: 780 days
#84

DISTRIBUTION BOARD TYPE 2130BH BY 535_BY 536

DISTRIBUTION BOARD TYPE 2130BH BY 535_BY 536

4 set Delivery: 780 days
#85

DISTRIBUTION BOARD TYPE 2121D BY 535_BY 536

DISTRIBUTION BOARD TYPE 2121D BY 535_BY 536

8 set Delivery: 780 days
#86

DISTRIBUTION BOARD TYPE 2125BE BY 535_BY 536

DISTRIBUTION BOARD TYPE 2125BE BY 535_BY 536

12 set Delivery: 780 days
#87

DISTRIBUTION BOARD TYPE 2124B BY 535_BY 536

DISTRIBUTION BOARD TYPE 2124B BY 535_BY 536

6 set Delivery: 780 days
#88

DISTRIBUTION BOARD TYPE 2115B BY 535_BY 536

DISTRIBUTION BOARD TYPE 2115B BY 535_BY 536

2 set Delivery: 780 days
#89

LIGHT SWITCH PANEL BY 535_BY 536

LIGHT SWITCH PANEL BY 535_BY 536

2 set Delivery: 780 days
#90

EMERGENCY SHUTDOWN SYSTEM BY 535_BY 536

EMERGENCY SHUTDOWN SYSTEM BY 535_BY 536

2 set Delivery: 780 days
#91

GALLEY ISOLATION SWITCH INCLUDING INDICATION PANEL BY 535_BY 536

GALLEY ISOLATION SWITCH INCLUDING INDICATION PANEL BY 535_BY 536

2 set Delivery: 780 days
#92

ON BOARD SPARES FOR PANELS BY 535_BY 536

ON BOARD SPARES FOR PANELS BY 535_BY 536

2 set Delivery: 780 days
#93

INSTALLATION_COMMISSIONING SPARES FOR PANELS BY 535_BY 536

INSTALLATION_COMMISSIONING SPARES FOR PANELS BY 535_BY 536

2 set Delivery: 780 days
#94

DOCUMENTATION FOR PANELS BY 535_BY 536

DOCUMENTATION FOR PANELS BY 535_BY 536

2 set Delivery: 780 days
#95

TRAINING BY 535_BY 536

TRAINING BY 535_BY 536

2 au Delivery: 780 days
#96

INSTALLATION_COMMISSIONING BY 535_BY 536

INSTALLATION_COMMISSIONING BY 535_BY 536

2 au Delivery: 780 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

PAN Card copy

2

GSTIN copy

3

Cancelled Cheque copy

4

EFT Mandate copy certified by bank

5

Signed Integrity Pact (as per Buyer policy)

6

GST invoice copy uploaded on GeM with GST portal payment screenshot

7

Vendor registration/enlistment with Cochin Shipyard for required goods/services

8

Any MSDS if toxic materials are supplied

Corrigendum Updates

2 Updates
#1

Update

09-Jul-2026

Extended Deadline

16-Jul-2026, 3:00 pm

Opening Date

16-Jul-2026, 3:30 pm

#2

Update

29-Jun-2026

Extended Deadline

09-Jul-2026, 3:00 pm

Opening Date

09-Jul-2026, 3:30 pm

Frequently Asked Questions

Key insights about KERALA tender market

How to bid in Cochin Shipyard GeM tender in Kerala 2026

Bidders must register with Cochin Shipyard for the required goods/services, submit PAN, GSTIN, cancelled cheque, and EFT mandate for vendor-code creation, upload signed Integrity Pact, and provide GST invoice on GeM with payment confirmation. Ensure compliance with the 25% quantity option clause and delivery timing rules.

What documents are required for Cochin Shipyard GeM bid 2026

Required documents include PAN Card, GSTIN, Cancelled Cheque, EFT Mandate certified by bank, signed Integrity Pact, GST invoice on GeM with payment screenshot, and proof of Cochin Shipyard registration/enlistment. MSDS is needed if toxic materials are supplied.

What is the delivery extension formula in this tender

Delivery extension is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days. The purchaser may extend up to the original delivery period while exercising the option clause.

What are the GST considerations for this procurement

Bidders must determine GST applicability themselves; GST reimbursement will be as actuals or at the applicable rate (whichever is lower), limited to quoted GST percentage. GST invoice must be uploaded on GeM with payment confirmation.

What is required for Integrity Pact submission in this tender

Bidders must sign and upload the Integrity Pact as per the buyer's policy before bid opening. The pact must be scanned and attached in the GeM bid submission alongside other mandatory documents.

When can the purchaser postpone material supply after order finalization

The purchaser may postpone supply by up to 6 months from the order finalization date without any additional cost implications; bidders should plan logistics accordingly and confirm any interim arrangements during bid submission.

What inspection will occur on material receipt at the yard

Receipt inspection will be conducted by the Buyer QC team or an external agency nominated by the buyer at the yard. Supplier should ensure ready-to-inspect materials and accompanying MSDS (if applicable).

What is the scope of 25% quantity variation in this GeM tender

The option clause allows increasing or decreasing bid quantity by up to 25% at contract placement and during the contract at contracted rates. The extended delivery is calculated per the specified formula with a minimum 30 days.

Similar Tenders

5 found
Urgent

Item 1: BOARD, MEASUREMENT, PN: 181B0077, DANFOSS,Item 2: SHUNT BOARD, 29.322OHM, 181B0924, DANFOSS

Rourkela Steel Plant

📍 SUNDERGARH, ODISHA

⏰ Deadline: 7 days left
🛒 Type: Goods
View GEM
Urgent

7104009006 STUD 520.04. 009-06

Armoured Vehicles Nigam Limited

📍 TIRUVALLUR, TAMIL NADU

⏰ Deadline: 7 days left
🛒 Type: Goods
View GEM
Urgent

959BR61706/ PACKING- 1345JEJF171D

Bharat Earth Movers Limited (beml)

📍 KOLAR, KARNATAKA

⏰ Deadline: 6 days left
🛒 Type: Goods
View GEM
Urgent

M9470006038,M9470002534

Ntpc Limited

📍 BILASPUR, CHHATTISGARH

⏰ Deadline: 3 days left
🛒 Type: Goods
View GEM

Procurement Opportunity: Installation of 08 Nos. of 440V distribution panel with MCCB 800A, 630A and 400A inside the metal enclosure with overcurrent, earth fault, short circuit and earth leakage protection for Shubhas Nagar Colony, Kali Mandir Colony, Filter Plant, PO Offic in RANCHI, JHARKHAND

Central Coalfields Limited

📍 RANCHI, JHARKHAND

EMD: ₹65,500
Est: ₹55.6 L
⏰ Deadline: 2 weeks left
🛒 Type: Works
View EPROCURE