TenderDekho Logo
GEM

Indian Army LED Lighting Tender Pune Maharashtra 410301 ISI BIS Standards 2026

Bid Publish Date

07-Jul-2026, 6:45 pm

Bid End Date

17-Jul-2026, 7:00 pm

EMD

₹2,00,000

Progress

Issue07-Jul-2026, 6:45 pm
AwardPending
Explore all 6 tabs to view complete tender details

Quantity

2769

Category

Space Box Saddle 20mm

Bid Type

Two Packet Bid

Key Highlights

  • Mandatory OEM authorizations on OEM letterhead for every item with current bid reference
  • 1-year OEM warranty; replacement obligation within 20 days of complaint
  • EMD of ₹200,000; eligibility requires Make in India certificate where applicable
  • IS/IS0 standards: IS 16102 (Part 2), IS 10322 (Part 5/Section 2), IS 7809 (Part 3/Sec1), IS/IEC 60898 (Part 1)
  • BIS Scheme II compliance and ISI marking when materials demand it
  • Advance sample submission required prior to supply commencement
  • Comprehensive post-installation service and installation/commissioning support nationwide
  • Non-blacklisting affidavit and OEM warranty certificates to be uploaded with bid

Categories 63

Tender Overview

The Indian Army, Department Of Military Affairs, invites bids for a wide range of LED lighting products and accessories in Pune, Maharashtra 410301. Targeted categories include LED Garden Light (V2), Self Ballasted LED Lamps conforming to IS 16102 (Part 2), LED Luminaire (Ceiling Light) conforming to IS 10322 (Part 5/Section 2), and multiple electrical fittings, wiring, MCBs and related hardware. Estimated value is not disclosed; EMD is ₹200,000. The scope also encompasses BIS Scheme II compliance, ISI marking, and OEM warranty obligations. Bidder must provide OEM authorizations and ensure Make in India certification where applicable. Unique requirements include sample submissions and post-sale service capability across India. The contract emphasizes strict adherence to IS and BIS standards, with dedicated after-sales support infrastructure near consignee locations.

Technical Specifications & Requirements

  • Product categories: LED Garden Light, LED Bulbs, LED Luminaire (recessed ceiling light), PVC tapes, MCBs, switches, sockets, candle/rope lighting, decorative lighting fixtures, distribution boards, busbars, connectors, and related electrical components.
  • Standards & certifications: IS 16102 (Part 2), IS 10322 (Part 5/Section 2), IS 7809 (Part 3/Sec 1), IS/IEC 60898 (Part 1); BIS CRS compliance; ISI marking where GI/MS/CI materials used.
  • Technical specs: LED wattages (e.g., 20W LED rods, 7W globes, 5W rope light), color temperatures (Warm/White variants), IP ratings, diffuser materials, wire lengths, mounting types, and pole construction details.
  • Performance & testing: System efficacy in lumen/watt, LED lamp cap design, BEE star rating, wind-load rating for pole structure, thermal management, and ambient operating temperatures.
  • Quality & warranty: Minimum warranty of 1 year from acceptance; OEM warranty certificates at delivery; Make in India certification; required OEM authorizations and service center network.
  • Documentation: Advance sample provision prior to supply; BIS/CRS compliance proof; OEM warranties; Make in India certificate; MII documentation where applicable.

Terms, Conditions & Eligibility

  • EMD: ₹200,000 (as per bid terms).
  • Warranty: 1 year warranty from final acceptance; OEM warranty certificates required at delivery.
  • OEM authorization: Mandatory OEM authorization on OEM letterhead for each item; reference bid number; ensure direct OEM contact in warranty period.
  • Documentation: Upload Make in India (MII) certificate; GST registration; PAN; experience certificates; financial statements; non-blacklisting affidavit; MSE certificates if claiming exemptions.
  • Delivery & after-sales: Installation, commissioning, training, and maintenance service network across India; response/repair obligations within defined timeframes (20 days for replacements under warranty).
  • Brand & compliance: Only standard-brand items; ISI/BIS/CRS compliance as applicable; ensure BIS CRS and ISI mark for relevant items.
  • Sample & approval: Advance samples to buyer for approval before commencement of supply; adhere to supplier performance and warranty conditions.

Key Specifications

  • Product/service: LED lighting and electrical accessories per IS BIS standards

  • Quantities: 52 items listed in BOQ; exact values not disclosed in data

  • EMD/Value: ₹200,000 EMD

  • Experience: Demonstrated capability for nationwide installation and support

  • Quality: ISI/BIS compliant, BIS CRS, OEM warranties, Make in India

Terms & Conditions

  • EMD of ₹200,000 and 1-year OEM warranty

  • OEM authorization on OEM letterhead for all items

  • Advance samples required; Make in India certification where applicable

  • Upload GST, PAN, experience, financials, and non-blacklisting affidavits

  • Post-sale service network and 20-day replacement window

Important Clauses

Payment Terms

Not specified in data; bidders should expect standard govt terms including payment upon delivery or milestone-based payment per contract.

Delivery Schedule

Delivery and installation timelines to be defined in the contract; ensure availability of service network across India and rapid replacement within 20 days for warranty items.

Penalties/Liquidated Damages

Not explicitly stated; bidders should assume LD clauses per GeM/Government procurement norms for delays and non-compliance.

Bidder Eligibility

  • Valid GST registration and PAN

  • Experience certificates for similar LED/electrical supply- installation projects

  • OEM authorization letters for each item and Make in India certification

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

LED Garden Light (V2) (Q2) , Self Ballasted LED Lamps (LED Bulb) (V3) Conforming to IS 16102 (Part 2) (Under BIS Scheme - II) (Q2) , LED Luminaire (Recessed Luminaire) (Ceiling Light) Conforming To IS 10322 (Part 5/Section 2) (V4) (Under BIS Scheme - II) (Q2) , Plasticized PVC Tapes with Non-Thermosetting Adhesive for electrical purpose (V2) ISI marked to IS 7809 (Part 3/ Sec1) (Q2) , Miniature Circuit Breakers (MCB) for AC Operation Marked To IS/IEC 60898 (Part 1) (Q2) , Spike light green 1012w , Fan Regulator switch 4 step type , LED Rod 20w metal , Single Socket normal 5 Amp , Switch 6 Amp Roma modular 2 module screw typer terminal 2 pole , Socket 6 Amp Roma modular 3 pin No of Pole single module , Buzzer Bell stereophonic , Gyser indication light Red Green each set , Rope light warm white 18 mtr 5 watt , Wall Mounting Decorative light opal globe glass with chrome finish 7W , Circular boxes with lid surface mounting 4 way output , terminal 1 way 25 mm PVC , Through Angle 2 Way 20 mm PVC rigid , Tee 3 way 25MM PVC rigid , Coupler for conduit 20mm , Coupler for conduit 25mm , Coupler Tee 20mm , Coupler Tee 25mm , Space Box Saddle 20mm , Space Box Saddle 25mm , Slip type bend 20mm , Slip type bend 25mm , Round Plate White for 25mm round box surface mounted , Fan box with rod white , Fan box with rod Black , Stainless steel metal box 12mm thick 3 module 79x99x46 , Stainless steel metal box 12mm thick 6 module 79x207x52 , Two Component gel set sealing compound 1200 ml make Hensel GH 1200 , Dew guard of size 75 mmx100 mm for size 2 cable entry , LED Plate for Bollard light 10w , VTPN MCCB 250A Distribution Board Bouble Door 4 Way IP 43 , VTPN MCCB 250A Distribution Board Bouble Door 6 Way IP 43 , VTPN MCCB 250A Distribution Board Bouble Door 8 Way IP 54 , Change over switch 63 A 4 P with all enclosure for out door , Change over switch 100 A 4 P with all enclosure for out door , FLEXI Distribution Board Double Door 14x3 Row IP 54 , 7 Segment Distribution Board Double Door 8 Way IP 43 , PPI Distribution Board Double Door Hari 82 Way IP 43 , PPI Distribution Board Double Door Hari 122 Way IP 43 , PPI Distribution Board Double Door Hari 82 Way IP 54 , Busbar Chamber TPN Type AI Busbar Spl 32A TPN with 4 og Ways , Busbar Chamber TPN Type AI Busbar Spl 63A TPN with 4 og Ways , Busbar Chamber TPN Type AI Busbar Spl 100A TPN with 4 og Ways , Busbar Chamber TPN Type AI Busbar Spl 200A TPN with 4 og Ways , Digital Time Switche Astronomical Programmable every 1 Min backup of 6 years 28 memory locations current capacity 16a with 1 changeover Total 28 Programs , Digital Time Switche Astronomical Programmable every 1 Min backup of 6 years 28 memory locations current capacity 16a with 2 changeover Total 14 Programs per channel , Light Sensitive switch with outer sensor sensitive distance 50 m current capacity 16A control from 1 lux to 100K lux , Spreaders 4P F1 Frame , Spreaders 4P F3 F3 Frame , Multipurpose sealant and adhesive based on hybrid polyurethane 600mml foil , Highly adhesiive sealing tape 10mtr length and 100mm width , Polyurethane liqid applied roof watrerproofing with improved water ponding capability

Advisory Bank

State Bank of India

ePBG Percentage

3%

ePBG Duration (Months)

14

Delivery Details

Max Delivery Days

45

Delivery Locations

1

Delivery Cities

PUNE CITY

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-PUNE CITYPUNE CITY--1245-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 11

GeM-Bidding-9473654.pdf

Main Document

GeM Category Specification

GEM_CATEGORY_SPECIFICATION

GeM Category Specification

GEM_CATEGORY_SPECIFICATION

GeM Category Specification

GEM_CATEGORY_SPECIFICATION

GeM Category Specification

GEM_CATEGORY_SPECIFICATION

GeM Category Specification

GEM_CATEGORY_SPECIFICATION

GeM Category Specification

GEM_CATEGORY_SPECIFICATION

GeM Category Specification

GEM_CATEGORY_SPECIFICATION

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 52 Items Sign in for GEM prices

#1

Spike light green 1012w

Spike light green 1012w

55 nos Delivery: 45 days
#2

Fan Regulator switch 4 step type

Fan Regulator switch 4 step type

45 nos Delivery: 45 days
#3

LED Rod 20w metal

LED Rod 20w metal

290 nos Delivery: 45 days
#4

Single Socket normal 5 Amp

Single Socket normal 5 Amp

180 nos Delivery: 45 days
#5

Switch 6 Amp Roma modular 2 module screw typer terminal 2 pole

Switch 6 Amp Roma modular 2 module screw typer terminal 2 pole

200 nos Delivery: 45 days
#6

Socket 6 Amp Roma modular 3 pin No of Pole single module

Socket 6 Amp Roma modular 3 pin No of Pole single module

100 nos Delivery: 45 days
#7

Buzzer Bell stereophonic

Buzzer Bell stereophonic

80 nos Delivery: 45 days
#8

Gyser indication light Red Green each set

Gyser indication light Red Green each set

60 set Delivery: 45 days
#9

Rope light warm white 18 mtr 5 watt

Rope light warm white 18 mtr 5 watt

62 nos Delivery: 45 days
#10

Wall Mounting Decorative light opal globe glass with chrome finish 7W

Wall Mounting Decorative light opal globe glass with chrome finish 7W

20 nos Delivery: 45 days
#11

Circular boxes with lid surface mounting 4 way output

Circular boxes with lid surface mounting 4 way output

25 nos Delivery: 45 days
#12

terminal 1 way 25 mm PVC

terminal 1 way 25 mm PVC

28 nos Delivery: 45 days
#13

Through Angle 2 Way 20 mm PVC rigid

Through Angle 2 Way 20 mm PVC rigid

25 nos Delivery: 45 days
#14

Tee 3 way 25MM PVC rigid

Tee 3 way 25MM PVC rigid

25 nos Delivery: 45 days
#15

Coupler for conduit 20mm

Coupler for conduit 20mm

150 nos Delivery: 45 days
#16

Coupler for conduit 25mm

Coupler for conduit 25mm

200 nos Delivery: 45 days
#17

Coupler Tee 20mm

Coupler Tee 20mm

22 nos Delivery: 45 days
#18

Coupler Tee 25mm

Coupler Tee 25mm

20 nos Delivery: 45 days
#19

Space Box Saddle 20mm

Space Box Saddle 20mm

20 nos Delivery: 45 days
#20

Space Box Saddle 25mm

Space Box Saddle 25mm

25 nos Delivery: 45 days
#21

Slip type bend 20mm

Slip type bend 20mm

30 nos Delivery: 45 days
#22

Slip type bend 25mm

Slip type bend 25mm

28 nos Delivery: 45 days
#23

Round Plate White for 25mm round box surface mounted

Round Plate White for 25mm round box surface mounted

25 nos Delivery: 45 days
#24

Fan box with rod white

Fan box with rod white

25 nos Delivery: 45 days
#25

Fan box with rod Black

Fan box with rod Black

30 nos Delivery: 45 days
#26

Stainless steel metal box 12mm thick 3 module 79x99x46

Stainless steel metal box 12mm thick 3 module 79x99x46

15 nos Delivery: 45 days
#27

Stainless steel metal box 12mm thick 6 module 79x207x52

Stainless steel metal box 12mm thick 6 module 79x207x52

30 nos Delivery: 45 days
#28

Two Component gel set sealing compound 1200 ml make Hensel GH 1200

Two Component gel set sealing compound 1200 ml make Hensel GH 1200

5 nos Delivery: 45 days
#29

Dew guard of size 75 mmx100 mm for size 2 cable entry

Dew guard of size 75 mmx100 mm for size 2 cable entry

18 nos Delivery: 45 days
#30

LED Plate for Bollard light 10w

LED Plate for Bollard light 10w

150 nos Delivery: 45 days
#31

VTPN MCCB 250A Distribution Board Bouble Door 4 Way IP 43

VTPN MCCB 250A Distribution Board Bouble Door 4 Way IP 43

2 nos Delivery: 45 days
#32

VTPN MCCB 250A Distribution Board Bouble Door 6 Way IP 43

VTPN MCCB 250A Distribution Board Bouble Door 6 Way IP 43

2 nos Delivery: 45 days
#33

VTPN MCCB 250A Distribution Board Bouble Door 8 Way IP 54

VTPN MCCB 250A Distribution Board Bouble Door 8 Way IP 54

1 nos Delivery: 45 days
#34

Change over switch 63 A 4 P with all enclosure for out door

Change over switch 63 A 4 P with all enclosure for out door

5 nos Delivery: 45 days
#35

Change over switch 100 A 4 P with all enclosure for out door

Change over switch 100 A 4 P with all enclosure for out door

5 nos Delivery: 45 days
#36

FLEXI Distribution Board Double Door 14x3 Row IP 54

FLEXI Distribution Board Double Door 14x3 Row IP 54

10 nos Delivery: 45 days
#37

7 Segment Distribution Board Double Door 8 Way IP 43

7 Segment Distribution Board Double Door 8 Way IP 43

10 nos Delivery: 45 days
#38

PPI Distribution Board Double Door Hari 82 Way IP 43

PPI Distribution Board Double Door Hari 82 Way IP 43

5 nos Delivery: 45 days
#39

PPI Distribution Board Double Door Hari 122 Way IP 43

PPI Distribution Board Double Door Hari 122 Way IP 43

6 nos Delivery: 45 days
#40

PPI Distribution Board Double Door Hari 82 Way IP 54

PPI Distribution Board Double Door Hari 82 Way IP 54

2 nos Delivery: 45 days
#41

Busbar Chamber TPN Type AI Busbar Spl 32A TPN with 4 og Ways

Busbar Chamber TPN Type AI Busbar Spl 32A TPN with 4 og Ways

5 nos Delivery: 45 days
#42

Busbar Chamber TPN Type AI Busbar Spl 63A TPN with 4 og Ways

Busbar Chamber TPN Type AI Busbar Spl 63A TPN with 4 og Ways

25 nos Delivery: 45 days
#43

Busbar Chamber TPN Type AI Busbar Spl 100A TPN with 4 og Ways

Busbar Chamber TPN Type AI Busbar Spl 100A TPN with 4 og Ways

15 nos Delivery: 45 days
#44

Busbar Chamber TPN Type AI Busbar Spl 200A TPN with 4 og Ways

Busbar Chamber TPN Type AI Busbar Spl 200A TPN with 4 og Ways

20 nos Delivery: 45 days
#45

Digital Time Switche Astronomical Programmable every 1 Min backup of 6 years 28 memory locations current capacity 16a with 1 changeover Total 28 Programs

Digital Time Switche Astronomical Programmable every 1 Min backup of 6 years 28 memory locations current capacity 16a with 1 changeover Total 28 Programs

4 nos Delivery: 45 days
#46

Digital Time Switche Astronomical Programmable every 1 Min backup of 6 years 28 memory locations current capacity 16a with 2 changeover Total 14 Programs per channel

Digital Time Switche Astronomical Programmable every 1 Min backup of 6 years 28 memory locations current capacity 16a with 2 changeover Total 14 Programs per channel

4 nos Delivery: 45 days
#47

Light Sensitive switch with outer sensor sensitive distance 50 m current capacity 16A control from 1 lux to 100K lux

Light Sensitive switch with outer sensor sensitive distance 50 m current capacity 16A control from 1 lux to 100K lux

20 nos Delivery: 45 days
#48

Spreaders 4P F1 Frame

Spreaders 4P F1 Frame

8 nos Delivery: 45 days
#49

Spreaders 4P F3 F3 Frame

Spreaders 4P F3 F3 Frame

8 nos Delivery: 45 days
#50

Multipurpose sealant and adhesive based on hybrid polyurethane 600mml foil

Multipurpose sealant and adhesive based on hybrid polyurethane 600mml foil

120 nos Delivery: 45 days
#51

Highly adhesiive sealing tape 10mtr length and 100mm width

Highly adhesiive sealing tape 10mtr length and 100mm width

150 nos Delivery: 45 days
#52

Polyurethane liqid applied roof watrerproofing with improved water ponding capability

Polyurethane liqid applied roof watrerproofing with improved water ponding capability

100 bucket Delivery: 45 days

Technical Specifications 7 Items

Item #1 Details

View Catalog
Category Specification Requirement
GENERIC Type of Garden Light Bollard type with Pole and LED lantern/luminaire, Architectural design with pole and LED lantern/luminaire, LED post top lantern/luminaire with pole
GENERIC Material of Garden Lighting pole including lighting system (lantern/luminaire) (Note: Wherever GI, MS, CI materials used, materials shall be ISI Marked) Aluminium casting, Galvanised Iron, Mild steel, Cast iron, LED post top with out pole. Hence not applicable
GENERIC Pole height inlcluding lantern/luminaire (in m) 0.5, 1, 1.5, 3, 4, 5, 6, 7, 8, without pole
GENERIC No.of lantern/luminaire with each pole (in m) 1, 2, 3, 4, 5, LED post top with out pole. Hence not applicable
LIGHT SOURCE Type of light source - BEE star rating of LED Bulb SMD LED Chip
LIGHT SOURCE LED Rating in each lantern/luminaire/lighting system (in Watts) 36.0
LIGHT SOURCE LED Lamp/System efficacy in each lantern / luminaire (in lumen / watt) ≥ 105 and < 120
LIGHT SOURCE In case of LED bulb - Cap designation of each lamp and holder in each lantern / luminaire Not applicable (for SMP LED Chip)
LIGHT SOURCE Colour temperature of each light source 4000 +/-275K
PROTECTION Automatic Lower / Higher Cut off voltage Yes. Lower cut off 120 V, Higher cut off 300 V
PROTECTION Protection against surges and transients - External > / = 10 KV Or higher
THERMAL MANAGEMENT Minimum Operating Temperature (in deg. C) -10
THERMAL MANAGEMENT Maximum Operating Temperature (in deg. C) 55
LANTERN/LUMINAIRE - CONSTRUCTION Diffuser Material UV stabilized - Poly Carbonate
LANTERN/LUMINAIRE - CONSTRUCTION Impact resistance on diffuser material (in IK) 8
LANTERN/LUMINAIRE - CONSTRUCTION Protection of the entire housing (in IP) Protection of the entire housing as per IS:10322 (Part 1):1982 latest 65
LANTERN/LUMINAIRE - CONSTRUCTION Length of ISI marked three core connecting wire (Provided along with each lantern/luminiare) - (in m) 0.5
LANTERN/LUMINAIRE - CONSTRUCTION Regional wind withstand capacity which the pole structure support is suitable to withstand (in m/s) 33
CERTIFICATIONS Warranty for free replacement of lighting systems including lightsource (in years) 2
CERTIFICATIONS Type of LED Bulb / Type of control gear for LED Modules Type 3 (as Per IS: 16103 (Part-2): 2012) DC or AC Supplied Electronic Control Gear for LED Modules - Performance Requirements as per IS:16104:2012 latest /IEC 62384:2020
CERTIFICATIONS Availabiliy of BIS CRS compliance Yes as per IS 15885 (Part 2/Sec 13
ADVANCE SAMPLE Agreed to provide Advance Sample(s) for buyer's approval before commencement of supply. ( hint: Applicable in case of orders placed against bid and not applicable in case of Direct Buying ) No

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar LED/electrical procurement

4

Financial statements for the last 2-3 years

5

EMD submission receipt or online payment proof

6

OEM authorization letters for each item on OEM letterhead

7

OEM warranty certificates clearly detailing applicable warranty period

8

Make in India (MII) certificate

9

Non-blacklisting affidavit (notarized, stamp paper ≤3 months old)

10

MSE certificates (if claiming exemptions)

11

Advance sample submission confirmation (where applicable)

Frequently Asked Questions

Key insights about MAHARASHTRA tender market

How to bid for LED lighting tender in Pune Maharashtra 2026?

Bidders must register on GeM, submit GST and PAN, attach OEM authorizations, and provide 1-year OEM warranty certificates. Ensure ISI/BIS compliance for relevant items, include Make in India certification, and provide advance samples for buyer approval before supply.

What documents are required for LED lighting procurement in Pune?

Submit GST certificate, PAN card, experience certificates, last 3 years financial statements, EMD receipt of ₹200,000, OEM authorizations on OEM letterhead, OEM warranty letters, MII certificate, non-blacklisting affidavit, and MSE certificates if claiming exemptions.

What standards apply to LED luminaire and garden light bids?

Standards include IS 16102 (Part 2) for LED lamps, IS 10322 (Part 5/Section 2) for luminaires, IS 7809 (Part 3/Sec1) for electrical insulation, IS/IEC 60898 (Part 1) for MCBs, plus BIS CRS compliance and ISI marking when applicable.

What is the EMD amount for this lighting tender in Maharashtra?

The Earnest Money Deposit required is ₹200,000. Payable as per bid terms via online method or DD, with bidder eligibility contingent on EMD submission.

What are the warranty requirements for supplied lighting equipment?

A minimum 1-year OEM warranty is required from final acceptance; OEM certificates must accompany delivery, with replacement for defective items within 20 days of complaint reporting to the MES or consignee.

What are the Make in India and OEM authorization requirements?

Bidders must provide a Make in India certificate and OEM authorization on the OEM letterhead for each item, clearly referencing the current bid number to enable direct OEM contact during warranty and after-sales support.

How is post-installation service and maintenance handled?

The seller must have a nationwide installation, commissioning, training, troubleshooting and maintenance service network; service centers near consignee locations must be listed and uploaded with the bid for timely support.

What is the expected delivery coverage for this Pune tender?

Delivery and installation should align with the consignees’ locations in Pune and other Indian regions; ensure stock readiness, advance sample approval, and a 20-day replacement window for warranty items to avoid penalties.