TenderDekho Logo
Active GEM

Rourkela Steel Plant DISC SPRING for Electrode Declamping LHF-2D Tender Odisha 2026 - OEM Authorized Supply 50CR V4

Bid Publish Date

11-Sep-2026, 9:56 am

Bid End Date

24-Sep-2026, 11:00 am

Location

SUNDERGARH , ODISHA

Progress

Issue11-Sep-2026, 9:56 am
AwardPending

Tender Overview

Rourkela Steel Plant, a unit of Steel Authority of India Limited, invites bids for DISC SPRING for electrode declamping of LHF-2D with material grade 50CR V4. The procurement is limited to OEM/OES or their authorized dealers, requiring a bid-specific authorization letter. Delivery is expected within 56-70 days from order placement. The project emphasizes dimensional conformity with the installed LHF-2D component and mandates supplier monogram. This item is a specialized replacement part for the LHF-2D assembly, with a focus on OEM integrity and exact part compatibility. The ATC highlights supplier eligibility and proof of OEM authorization as critical differentiators.

Technical Specifications & Requirements

  • Item: DISC SPRING for electrode declamping of LHF-2D; material: 50CR V4 PHO; exact dimensions to match installed LHF-2D.
  • Eligibility: OEM/OES or authorized dealer; upload bid-specific authorization letter if submitted by an authorized dealer.
  • Documentation: GC and MTC to accompany supply; supplier monogram required.
  • Quality/Conformity: item must be technically and dimensionally identical to installed LHF-2D; declaration of supply of identical item is required.
  • Delivery: 56-70 days from order placement; quantity option clause may allow up to 25% variation as per contract terms.
  • Invoicing: GST as applicable; invoice in consignee name with GSTIN; GST payment proof via GST portal screenshot.

Terms, Conditions & Eligibility

  • OEM/OES only: bid from non-OEM/EOS with no valid bid-specific authorization will be deemed ineligible.
  • Delivery terms: 56-70 days post-order; option to extend delivery with calculated duration (minimum 30 days).
  • GST: bidders to determine applicable GST; purchaser reimburses as per actuals or lower rate.
  • Documentation: GC, MTC, and OEM authorization letter must be uploaded; supplier monogram required.
  • Warranty/Aftercare: not specified; ensure product dimension compatibility with installed LHF-2D; confirm identical specification prior to supply.

Key Specifications

  • Product: DISC SPRING for electrode declamping of LHF-2D

  • Material: 50CR V4 PHO

  • Dimension conformity: identical to installed LHF-2D component

  • Delivery: 56-70 days from order placement

  • Quantity variation: up to 25% of bid quantity during contract, per option clause

  • Documentation: GC and MTC to be submitted; OEM authorization letter if applicable

  • Brand/OEM requirement: OEM/OES or authorized dealer with bid-specific authorization

Terms & Conditions

  • OEM/OES eligibility with bid-specific authorization is mandatory

  • Delivery within 56-70 days and possible 25% quantity variation

  • GC, MTC, and supplier monogram are required with supply

Important Clauses

Delivery Terms

Delivery must be completed within 56-70 days from order; option to extend with minimum 30 days, proportional calculation for extended quantity.

OEM Authorization

Only OEM/OES or authorized dealers with valid bid-specific authorization are eligible; unsolicited bids from others will be ineligible.

GST & Invoicing

Invoice in consignee name with consignee GSTIN; GST paid via portal; bidder to upload GST invoice and GST portal payment screenshot.

Bidder Eligibility

  • Unit must be OEM/OES or authorized dealer with valid bid-specific authorization

  • Must supply GC and MTC with the bid

  • Must confirm dimensional compatibility with installed LHF-2D and provide supplier monogram

Advertisement

Tender Data

Bid Details

Quantity

150

Bid Type

Two Packet Bid

Bid Validity

90 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

ITEM 10 20513501000800 DISC SPRING, MAT: 50CR V4 PHO, GALA

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

70

Delivery Locations

1

Delivery Cities

Sundargarh

Delivery Pincodes

769011

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
AJIT KUMAR SAHOO769011,PS-II STORE, SAIL - ROURKELA STEEL PLANTSundargarhOdisha76901115070-

Authority Records

MINISTRY OF STEELSTEEL AUTHORITY OF INDIA LIMITEDROURKELA STEEL PLANT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9868121.pdf

Main Document

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Office Name

Materials Management Purchase

Grievance Contact

[email protected]

Categories 1

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

OEM bid-specific authorization letter (if bidding via authorized dealer)

2

GST registration certificate and GSTIN of consignee on invoice

3

Commercial GST invoice (uploaded on GeM) and GST portal payment screenshot

4

General conditions: GC and MTC for the supply

5

Evidence of dimensional/technical conformity with installed LHF-2D (declaration or test report)

6

Supplier monogram on the supplied items

7

Any additional OEM-specific certification or conformity documents requested by the buyer

Frequently Asked Questions

How to bid for DISC SPRING LHF-2D tender in Odisha with OEM authorization

Bidders must be OEM/OES or authorized dealers with a valid bid-specific authorization letter. Submit GC and MTC, exhibit supplier monogram, and ensure the item matches installed LHF-2D specifications. Include GSTIN, GST payment proof, and OEM authorization with the bid. Delivery is 56-70 days from order.

What documents are required for LHF-2D spring procurement bid in Rourkela

Required documents include OEM bid-specific authorization letter (if dealer bid), GC, MTC, supplier monogram, GST certificate, consignee GSTIN, and a declaration of dimensional conformity with installed LHF-2D. Invoices must be GST-compliant with the consignee name.

What are the delivery timelines for the DISC SPRING supply in this tender

Delivery must be completed within 56-70 days from order placement. The contract may include an option to extend delivery time proportionally for added quantity, with a minimum extension of 30 days.

What are the eligibility criteria for OEM authorization in this tender

Only OEM/OES or authorized dealers with a valid bid-specific authorization letter can participate. Unsolicited bids will be treated as ineligible, and the item must be dimensionally identical to the installed LHF-2D component.

What GST requirements apply to invoicing for this supply

Invoices must be raised in the consignee’s name with the consignee GSTIN. The supplier must upload a scanned GST invoice and a GST portal payment screenshot; GST reimbursement will follow actuals or applicable rates, up to the quoted rate.

Which standards or certifications are required for the DISC SPRING

The tender specifies OEM/OES authorization and dimensional conformity with installed LHF-2D; GC and MTC are required. suppliers should ensure the part material 50CR V4 and exact dimensions, with supplier monogram visible on the item.

How is quantity variation handled in this procurement

The purchaser reserves the right to increase or decrease quantity by up to 25% at contract award and during the contract at contracted rates; additional delivery time is calculated as (additional quantity / original quantity) × original delivery period, minimum 30 days.

What is the role of GC and MTC in the delivery

GC and MTC must be submitted along with the supply to verify manufacturing quality and traceability. They accompany the delivery and support compliance with dimensional and material specifications for the LHF-2D component.

Explore More Opportunities

Quick Access