Indian Army Department Of Military Affairs Goods Tender 2026 India – 3-Year Govt Turnover, 25% Quantity Option, EMD ₹119000

Bid Publish Date

30-Jan-2026, 12:43 pm

Bid End Date

09-Feb-2026, 1:00 pm

EMD

₹1,19,000

Value

₹39,68,240

Location

Progress

RA
Issue30-Jan-2026, 12:43 pm
Reverse AuctionCompleted
AwardCompleted
Explore all 4 tabs to view complete tender details

Quantity

20136

Category

Modular switch socket combination 15 oblique 16 Amp with gang box

Bid Type

Two Packet Bid

Categories 161

AGITATORS COPPER WIRE SIMPLEX PUMPS WORM PUMPS PLATFORM SCALE CIRCULAR SAW BOOK CASE INVERTER AMMONIA ALUM PURE DISTRIBUTION BOARD ALMIRAH BULB COPPER CABLE SECURITY HARDWARE ALUM CONNECTORS SUPPLY SUB STATION POWER CABLE CABBING EQUIPMENTS COMPRESSOR PTFE WIRE AIR CYLINDERS AIR COOLED ENGINE DESERT COOLER WIRING ASSEMBLY MOBIL OIL ACID BUFFERS DISTRIBUTION?BOX FUSE WIRE LABORATORY WATER PURIFICATION EQUIPMENT BEARINGS BUSHINGS AND GEARS CANVASES AND FILMS AND BOARDS COMPRESSED BOARD DISTILLATION HARDWARE AND FASTENERS GEYSER BLADE WOODEN BOARD STRIP WOODEN PRODUCT DISCRETE COMPONENTS ELECTRICAL WIRE XLPE CABLE CABLE DUCT SOLAR PV PLANT STEEL WIRE CIRCUIT PROTECTION DEVICE PUMP SPARE PARTS ELBOW SAND FILTER AMPOULE FILLING EQUIPMENT COPPER ALLOY WOOD SUPPLY SCRIPT WRITING COOLANT INSTRUMENTATION CABLE GI WIRE ELECTRICAL SUBSTATION STATIC CONVERTERS SPEED DRIVE SYSTEM ELECTRICAL?CONDUIT COPPER SHEET IRRIGATION PUMPS SOLAR CHARGER MILITARY VEHICLE WATER SUPPLY CONDUCTOR COOLER CAPACITOR COMMON USE TERMINAL EQUIPMENT SOCKET SOLAR CHARGING WATER PURIFIER AND RO PLANT CB BOX WATER TANK SOLAR FENCE TRANSFORMER OIL BRACKET NEON LAMP HYBRID POWER SYSTEM AIR EXHAUSTER GI PIPE FLEXIBLE CABLE WATER STORAGE AND SUPPLY COPPER PIPE COILED CABLE WOODEN PLANK SWITCH GEAR LUGS CONNECTOR SOLAR CELLS DOORS LFH CABLE SHIELDED CABLE WOODEN FURNITURE FOOT VALVE PLY WOOD SWITCH BOX FORESTRY PRODUCTS ROLLER BEARING AWM WIRE ARCHERY BOWS GL WIRE PUMP VALVES CHANGE OVER SWITCH BALL BEARING GASKETS AND SEALS NON FERRIC ALUM POWER WIRE WHEEL BEARING WATER SUPPLY PROJECT ELECTRICAL CONDENSER VERTICAL COOLER TUBE DISTILLED WATER BOX VALVE STABILIZER WIRE WIRE CONNECTORS DISTRIBUTION PANEL ENT SET WORM GEAR PLYWOOD TURBINE PUMPS STEAM PUMPS SLIDING VANE PUMPS SOLAR PHOTOVOLTAIC SYSTEM FLUORESCENT LAMP MODULAR SWITCH GALVANIZED WIRE BARE CABLE CABINET MESH ANGLE COCK ANCHORAGE LOCK SPLIT CASING PUMP TRANSITION METALS POWER CONDITIONING CABLE CABLE BOX PIPES AND TUBES LUBE OIL PVC TANK BEARING OIL PLASTIC BEEKEEPING EQUIPMENT VALVE PARTS AND ACCESSORIES OSCILLATING PUMPS AUTOMOTIVE CABLE FLEXIBLE PIPE TIMER ELECTRONIC TIMER HYDRAULIC LOW TENSION PANEL PEB WATERING FACILITY FAN METAL PRODUCTS LIME GALVANIZED IRON PIPE BEARINGS GREASE

Tender Overview

The Indian Army, Department Of Military Affairs, has issued a goods tender with an estimated value of ₹3,968,240.00 and an EMD of ₹119,000.00. The scope is limited to the supply of goods and includes a flexible quantity clause allowing up to 25% increase at contract award and during the currency of the contract at contracted rates. The tender emphasizes vendor/OEM credibility via disciplined turnover and experience criteria, with the purchase intended to be fulfilled through direct supply from bidders. The geographic location is not specified in the data, but this is a government procurement under central defense for internal deployment. The tender’s distinctive features include the option-based expansion, the requirement to create vendor codes, and the need for documented financial and operational credibility, including turnover proof and prior supply contracts.

Technical Specifications & Requirements

  • Scope: Supply of goods (not services) to the Indian Army under a single or multiple contracts as per bid.
  • Experience: Bidder or OEM must have at least 3 years of regular manufacturing and supply of similar category products to Central/State Govt Organizations or PSUs. Provide copies of relevant contracts for each year.
  • Turnover: Minimum average annual turnover for the last 3 financial years ending 31st March must be demonstrated with audited balance sheets or CA certificate; if company is <3 years old, turnover is considered from post-incorporation years.
  • EMD: ₹119,000 required with bid.
  • Delivery & Scope: Delivery terms include an option to increase quantity by up to 25%, with extra time calculated as (increase/original quantity) × original delivery period, minimum 30 days.
  • BOQ: 146 items in the Bill of Quantities, with the first 5 items listed as N/A; exact itemization not provided.
  • Bidder Code Creation: Documentation includes PAN, GSTIN, cancelled cheque, and EFT mandate; supplier onboarding is part of the process.
  • Warranty/Support: No explicit warranty terms stated in the data; bidders should infer standard government procurement warranty expectations.

Terms, Conditions & Eligibility

  • EMD: ₹119,000.
  • Option Clause: Quantity may be increased by up to 25% at contract award or during currency at contracted rates.
  • Delivery Timing: Extended delivery timelines governed by the option clause, with minimum extension of 30 days.
  • Documents: Provide PAN, GSTIN, cancelled cheque, EFT mandate; demonstrate OEM capability via contracts.
  • Turnover Criteria: Minimum average turnover of bidder and OEM over the last 3 years; if under 3 years, turnover calculated from post-constitutions years.
  • Scope: Only supply of goods; no services included in scope.
  • This data implies standard government procurement practices: compliance with proof of turnover, prior government supply, and formal document submission for vendor code creation.

Key Specifications

  • Scope of Supply: Goods only

  • EMD: ₹119,000

  • Estimated value: ₹3,968,240.00

  • Experience: 3 years in similar govt/PSU supply

  • Turnover: 3-year average as per bid document

  • Quantity flexibility: +25% during contract

  • BOQ items: 146 total; first 5 items N/A

Terms & Conditions

  • EMD amount of ₹119,000 must accompany bid

  • 25% quantity escalation right exercised at placement or during contract

  • 3-year turnover proof for bidder and OEM required

Important Clauses

Payment Terms

EMD to be submitted; no explicit payment schedule provided in data; bidders should anticipate standard govt terms.

Delivery Schedule

Delivery period starts after last date of original delivery order; extension rules apply per option clause with a minimum 30 days.

Penalties/Liquidated Damages

Not specified in data; standard govt procurement penalties likely applicable, contingent on final tender terms.

Bidder Eligibility

  • 3+ years of regular manufacturing/supply experience to govt/PSUs for similar products

  • Minimum average annual turnover over last 3 years as per bid

  • OEM capability or authorised distributor with proper documentation

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-8885185.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 146 Items Sign in for GEM prices

#1

Modular switch socket combination 15 oblique 16 Amp with gang box

Modular switch socket combination 15 oblique 16 Amp with gang box

124 nos Delivery: 45 days
#2

Modular switch socket combination 5 oblique 6 Amp with gang box

Modular switch socket combination 5 oblique 6 Amp with gang box

160 nos Delivery: 45 days
#3

PVC Switch board 10 inch x12 inch x2 inch

PVC Switch board 10 inch x12 inch x2 inch

76 nos Delivery: 45 days
#4

PVC Switch board 8 inch x 10 inch x 2 inch

PVC Switch board 8 inch x 10 inch x 2 inch

76 nos Delivery: 45 days
#5

PVC Switch board 7 inch x 4 inch x 2 inch

PVC Switch board 7 inch x 4 inch x 2 inch

70 nos Delivery: 45 days
#6

PVC Switch board 4 inch x 4 inch x 2 inch

PVC Switch board 4 inch x 4 inch x 2 inch

50 nos Delivery: 45 days
#7

Cable lugs 50 Sqm Copper

Cable lugs 50 Sqm Copper

30 nos Delivery: 45 days
#8

Cable lugs 35 Sqm Copper

Cable lugs 35 Sqm Copper

20 nos Delivery: 45 days
#9

Cable lugs 95 Sqm aluminium

Cable lugs 95 Sqm aluminium

40 nos Delivery: 45 days
#10

Cable lugs 240 Sqmm aluminium

Cable lugs 240 Sqmm aluminium

60 nos Delivery: 45 days
#11

Cable lugs 70 Sqmm aluminium

Cable lugs 70 Sqmm aluminium

100 nos Delivery: 45 days
#12

Cable lugs 16 Sqmm aluminium

Cable lugs 16 Sqmm aluminium

300 nos Delivery: 45 days
#13

Cable lugs 10 Sqmm aluminium

Cable lugs 10 Sqmm aluminium

300 nos Delivery: 45 days
#14

Cable lugs 50 Sqmm aluminium

Cable lugs 50 Sqmm aluminium

140 nos Delivery: 45 days
#15

Cable lugs 70 Sqm Copper

Cable lugs 70 Sqm Copper

64 nos Delivery: 45 days
#16

3 Phase Electronic Timer 3 to 30 sec

3 Phase Electronic Timer 3 to 30 sec

10 nos Delivery: 45 days
#17

NRV for gesyer

NRV for gesyer

10 nos Delivery: 45 days
#18

Geyser sefty valve

Geyser sefty valve

12 nos Delivery: 45 days
#19

Flexible cable twine core copper conductor size 14 oblique 0076

Flexible cable twine core copper conductor size 14 oblique 0076

540 rm Delivery: 45 days
#20

Flexible cable copper 23 oblique 0076

Flexible cable copper 23 oblique 0076

2,330 rm Delivery: 45 days
#21

AC drain pipe long type

AC drain pipe long type

6 nos Delivery: 45 days
#22

Reverse cycling valve for AC 1.5 Ton

Reverse cycling valve for AC 1.5 Ton

12 nos Delivery: 45 days
#23

AC Outdoor fan motor 1.5 Ton

AC Outdoor fan motor 1.5 Ton

10 nos Delivery: 45 days
#24

AC Outdoor fan motor 2.0 Ton

AC Outdoor fan motor 2.0 Ton

10 nos Delivery: 45 days
#25

AC Indoor fan motor 1.5 Ton

AC Indoor fan motor 1.5 Ton

10 nos Delivery: 45 days
#26

AC Indoor fan motor 2.0 Ton

AC Indoor fan motor 2.0 Ton

10 nos Delivery: 45 days
#27

Relay over load for refrigerator

Relay over load for refrigerator

8 nos Delivery: 45 days
#28

Gas hydrocarbon for refrigerator

Gas hydrocarbon for refrigerator

20 kg Delivery: 45 days
#29

Thermostate for AC

Thermostate for AC

10 nos Delivery: 45 days
#30

Compressor 2.0 Ton

Compressor 2.0 Ton

6 nos Delivery: 45 days
#31

Gas 410 R

Gas 410 R

16 kg Delivery: 45 days
#32

Gas R-22

Gas R-22

14 kg Delivery: 45 days
#33

Copper tube 3 oblique 4 Inch

Copper tube 3 oblique 4 Inch

40 rm Delivery: 45 days
#34

Copper tube 5 oblique 8 Inch

Copper tube 5 oblique 8 Inch

40 rm Delivery: 45 days
#35

PCB 1.5 oblique 2 Ton Universol

PCB 1.5 oblique 2 Ton Universol

16 nos Delivery: 45 days
#36

Voltage stabilizer 5 KVA

Voltage stabilizer 5 KVA

2 nos Delivery: 45 days
#37

Compressor for refrigerator

Compressor for refrigerator

2 nos Delivery: 45 days
#38

Capacitor 4 mfd

Capacitor 4 mfd

20 nos Delivery: 45 days
#39

LED Ceiling Light 36 watt

LED Ceiling Light 36 watt

20 nos Delivery: 45 days
#40

Capacitor for ceiling fan 2.5 mfd

Capacitor for ceiling fan 2.5 mfd

204 nos Delivery: 45 days
#41

Fuse wire copper 20 Amp

Fuse wire copper 20 Amp

36 roll Delivery: 45 days
#42

Grease for bearing

Grease for bearing

38 kgs Delivery: 45 days
#43

Ball Bearing 6203 Make SKF

Ball Bearing 6203 Make SKF

82 nos Delivery: 45 days
#44

Lamp holder pendent

Lamp holder pendent

500 nos Delivery: 45 days
#45

PVC flat 20 oblique 25 mm Casing capping

PVC flat 20 oblique 25 mm Casing capping

172 rm Delivery: 45 days
#46

Bulk head fitting LED 12 watt

Bulk head fitting LED 12 watt

100 nos Delivery: 45 days
#47

Ball bearing No 6201

Ball bearing No 6201

214 nos Delivery: 45 days
#48

M seal

M seal

80 kgs Delivery: 45 days
#49

PVC insulation tape 25 mm

PVC insulation tape 25 mm

800 roll Delivery: 45 days
#50

Lamp holder batten

Lamp holder batten

794 nos Delivery: 45 days
#51

Inverter LED Bulb 9W

Inverter LED Bulb 9W

200 nos Delivery: 45 days
#52

Distilled water for bty

Distilled water for bty

386 ltrs Delivery: 45 days
#53

Change over switch sheet metal enclosure side operated 200 Amp Modular type

Change over switch sheet metal enclosure side operated 200 Amp Modular type

8 nos Delivery: 45 days
#54

Change over switch conforming to sheet metal 63 Amp 4 Pole Modular type

Change over switch conforming to sheet metal 63 Amp 4 Pole Modular type

8 nos Delivery: 45 days
#55

Heat shrinkable end terminal box of cable XLPE 3.5 core 95 Sqmm outdoor type

Heat shrinkable end terminal box of cable XLPE 3.5 core 95 Sqmm outdoor type

10 nos Delivery: 45 days
#56

Heat shrinkable 3x70 oblique 95 sqmm St through joint kit

Heat shrinkable 3x70 oblique 95 sqmm St through joint kit

10 nos Delivery: 45 days
#57

Coolant heavy duty

Coolant heavy duty

80 ltrs Delivery: 45 days
#58

Cotton waste

Cotton waste

200 kgs Delivery: 45 days
#59

HT tape3 oblique 4 inch x50 mtrs

HT tape3 oblique 4 inch x50 mtrs

80 nos Delivery: 45 days
#60

Transformer oil

Transformer oil

250 ltrs Delivery: 45 days
#61

PVC Exhaust oblique Air Freshner 200mm sweep

PVC Exhaust oblique Air Freshner 200mm sweep

24 nos Delivery: 45 days
#62

PVC Exhaust oblique Air Freshner 250mm sweep

PVC Exhaust oblique Air Freshner 250mm sweep

28 nos Delivery: 45 days
#63

Iron body Exhaust fan 300mm sweep

Iron body Exhaust fan 300mm sweep

16 nos Delivery: 45 days
#64

Iron body Exhaust fan 350mm sweep

Iron body Exhaust fan 350mm sweep

14 nos Delivery: 45 days
#65

PVC flexible pipe of size 25mm

PVC flexible pipe of size 25mm

160 rm Delivery: 45 days
#66

TPN Distribution board 8 way single door vertical

TPN Distribution board 8 way single door vertical

20 nos Delivery: 45 days
#67

SPN DB 4 Way double door

SPN DB 4 Way double door

16 nos Delivery: 45 days
#68

Wall fan 450 mm sweep

Wall fan 450 mm sweep

24 nos Delivery: 45 days
#69

PVC Conduit Pipe of size 25 mm dia

PVC Conduit Pipe of size 25 mm dia

400 rm Delivery: 45 days
#70

Foot valve 50mm dia brass

Foot valve 50mm dia brass

4 nos Delivery: 45 days
#71

Foot valve 80mm dia brass

Foot valve 80mm dia brass

4 nos Delivery: 45 days
#72

Gland packing 5mm thick

Gland packing 5mm thick

30 kg Delivery: 45 days
#73

Gland packing 10mm thick

Gland packing 10mm thick

40 kg Delivery: 45 days
#74

Crystal Alum

Crystal Alum

3,000 kg Delivery: 45 days
#75

Sodium Carbonate for water treatment

Sodium Carbonate for water treatment

1,200 kg Delivery: 45 days
#76

Copper Sulphate

Copper Sulphate

40 kg Delivery: 45 days
#77

Lime

Lime

400 kg Delivery: 45 days
#78

Teflon tape

Teflon tape

400 nos Delivery: 45 days
#79

GI pipe med grade 25 mm

GI pipe med grade 25 mm

111 rm Delivery: 45 days
#80

GI pipe med grade 40 mm

GI pipe med grade 40 mm

60 rm Delivery: 45 days
#81

GI pipe med grade 50 mm

GI pipe med grade 50 mm

60 rm Delivery: 45 days
#82

GI pipe med grade 80 mm

GI pipe med grade 80 mm

24 rm Delivery: 45 days
#83

GI nipple 15 x 300 mm long

GI nipple 15 x 300 mm long

40 nos Delivery: 45 days
#84

GI nipple 15 x 150 mm long

GI nipple 15 x 150 mm long

40 nos Delivery: 45 days
#85

GI nipple 20 x 150 mm long

GI nipple 20 x 150 mm long

40 nos Delivery: 45 days
#86

GI nipple 15 x 50 mm long

GI nipple 15 x 50 mm long

40 nos Delivery: 45 days
#87

GI nipple 20 x 300 mm long

GI nipple 20 x 300 mm long

40 nos Delivery: 45 days
#88

GI nipple 20 x 50 mm long

GI nipple 20 x 50 mm long

40 nos Delivery: 45 days
#89

GI Union socket 20 mm

GI Union socket 20 mm

30 nos Delivery: 45 days
#90

GI Union socket 25mm

GI Union socket 25mm

30 nos Delivery: 45 days
#91

GI Union socket 15 mm

GI Union socket 15 mm

40 nos Delivery: 45 days
#92

GI elbow 15 mm

GI elbow 15 mm

100 nos Delivery: 45 days
#93

GI Elbow 20 mm

GI Elbow 20 mm

100 nos Delivery: 45 days
#94

GI pipe med grade 20 mm

GI pipe med grade 20 mm

50 rm Delivery: 45 days
#95

GI pipe med grade 15 mm

GI pipe med grade 15 mm

94 rm Delivery: 45 days
#96

Paint smoke grey

Paint smoke grey

40 ltrs Delivery: 45 days
#97

Plywood one side teak face 4 mm thick

Plywood one side teak face 4 mm thick

318 sqft Delivery: 45 days
#98

MDF Board 12 mm Thick

MDF Board 12 mm Thick

122 sqft Delivery: 45 days
#99

MDF Board 18 mm thick size 2400x1200mm

MDF Board 18 mm thick size 2400x1200mm

110 sqft Delivery: 45 days
#100

Plywood 4mm thick size-2400x1200mm

Plywood 4mm thick size-2400x1200mm

272 sqft Delivery: 45 days
#101

Pre laminated board 19 mm thick Size 2400 x 1200 mm

Pre laminated board 19 mm thick Size 2400 x 1200 mm

82 sqft Delivery: 45 days
#102

Plywood 9 mm thick size 2400x1200 mm

Plywood 9 mm thick size 2400x1200 mm

148 sqft Delivery: 45 days
#103

MDF board 6 mm thick size 2400 x 1200 mm

MDF board 6 mm thick size 2400 x 1200 mm

106 sqft Delivery: 45 days
#104

Ply wood commercial 6 feet x3 feet x12mm

Ply wood commercial 6 feet x3 feet x12mm

1,280 sqft Delivery: 45 days
#105

Decorative designer 6mm ply one side teak face of size 6 feet x4 feet x6mm

Decorative designer 6mm ply one side teak face of size 6 feet x4 feet x6mm

128 sqft Delivery: 45 days
#106

Aluminium Door handle 150mm long

Aluminium Door handle 150mm long

40 nos Delivery: 45 days
#107

Glass pane clear size 3 mm thickness

Glass pane clear size 3 mm thickness

8 sqm Delivery: 45 days
#108

Fevicol SH

Fevicol SH

50 kgs Delivery: 45 days
#109

GI wire mesh 0.46 x1.8 x 15 mtr length

GI wire mesh 0.46 x1.8 x 15 mtr length

46 kgs Delivery: 45 days
#110

Super flash strip 4 inch thick x 10 mtr length

Super flash strip 4 inch thick x 10 mtr length

14 nos Delivery: 45 days
#111

Mirror looking 450mm x 600mm

Mirror looking 450mm x 600mm

10 nos Delivery: 45 days
#112

MS Screw wood 25 mm long Pkt of 400 gms

MS Screw wood 25 mm long Pkt of 400 gms

40 pkt Delivery: 45 days
#113

Wash Hand Basin Size-500x400mm

Wash Hand Basin Size-500x400mm

4 nos Delivery: 45 days
#114

Halical door spring 150 mmm

Halical door spring 150 mmm

20 nos Delivery: 45 days
#115

Hydraulic door closure type II

Hydraulic door closure type II

16 nos Delivery: 45 days
#116

Glass Putty

Glass Putty

10 kg Delivery: 45 days
#117

Nails wire steel 50 mm

Nails wire steel 50 mm

10 kgs Delivery: 45 days
#118

MS Screw wood 35 mm long

MS Screw wood 35 mm long

200 pkt Delivery: 45 days
#119

Plastic wall plug Pkt of 50

Plastic wall plug Pkt of 50

20 nos Delivery: 45 days
#120

Paint brush 100 mm

Paint brush 100 mm

15 nos Delivery: 45 days
#121

Flush cistern washer Pkt of 05 Nos

Flush cistern washer Pkt of 05 Nos

40 pkt Delivery: 45 days
#122

MS butt hinges 100 mm

MS butt hinges 100 mm

50 nos Delivery: 45 days
#123

Haps and Staples CP size 75 mm

Haps and Staples CP size 75 mm

268 nos Delivery: 45 days
#124

Nails wire steel 25 mm

Nails wire steel 25 mm

20 kg Delivery: 45 days
#125

Nails wire steel 100 mm

Nails wire steel 100 mm

20 kgs Delivery: 45 days
#126

PVC water tank 1000 ltrs capacity

PVC water tank 1000 ltrs capacity

6 nos Delivery: 45 days
#127

PVC water tank 500 ltrs capacity

PVC water tank 500 ltrs capacity

8 nos Delivery: 45 days
#128

Hack saw blade double side

Hack saw blade double side

100 nos Delivery: 45 days
#129

PVC tank lid for the tanks of capacity 1000 Ltrs

PVC tank lid for the tanks of capacity 1000 Ltrs

20 nos Delivery: 45 days
#130

PVC tank lid for the tanks of capacity 500 Ltrs

PVC tank lid for the tanks of capacity 500 Ltrs

20 nos Delivery: 45 days
#131

Fastner with nut and bolt

Fastner with nut and bolt

40 set Delivery: 45 days
#132

Bath room cabinet with sliding shutter

Bath room cabinet with sliding shutter

10 nos Delivery: 45 days
#133

Corner shelf 250mm

Corner shelf 250mm

60 nos Delivery: 45 days
#134

Glass shelf 18 inch long

Glass shelf 18 inch long

70 nos Delivery: 45 days
#135

Self luminious tape 4 inch wide Red colour

Self luminious tape 4 inch wide Red colour

96 rm Delivery: 45 days
#136

EWC feet P feet trap English WC chinaware

EWC feet P feet trap English WC chinaware

4 nos Delivery: 45 days
#137

Al sheet .50 mm thick 1 mtr wide

Al sheet .50 mm thick 1 mtr wide

26 sqm Delivery: 45 days
#138

Mortise lock 4 lever for aluminium door

Mortise lock 4 lever for aluminium door

14 nos Delivery: 45 days
#139

Acrylic shelf of size 18 inch x 5 inch

Acrylic shelf of size 18 inch x 5 inch

10 nos Delivery: 45 days
#140

Tumbler holder

Tumbler holder

20 nos Delivery: 45 days
#141

Screw wood steel 75mm

Screw wood steel 75mm

10 pkt Delivery: 45 days
#142

Locks for Almirah steel Med oblique Large

Locks for Almirah steel Med oblique Large

30 nos Delivery: 45 days
#143

Handle for Almirah steel

Handle for Almirah steel

30 nos Delivery: 45 days
#144

Glass pane frosted size 4mm thickness

Glass pane frosted size 4mm thickness

10 sqm Delivery: 45 days
#145

SS Curtain rod 20 mm with bracket

SS Curtain rod 20 mm with bracket

150 rm Delivery: 45 days
#146

SS Curtain rod 25 mm with bracket

SS Curtain rod 25 mm with bracket

100 rm Delivery: 45 days

Required Documents

1

GST certificate

2

PAN card

3

Experience certificates showing 3+ years of supply to govt/PSUs

4

Audited financial statements or CA certificate indicating turnover for last 3 years

5

EMD document (₹119,000) via applicable payment mode

6

Cancelled cheque and EFT mandate certified by Bank

7

OEM authorization or reseller agreements (if applicable)

8

Technical bid documents as required by Terms and Conditions

Reverse Auction Schedule

Completed

Start

10-Feb-2026, 11:00 pm

End

12-Feb-2026, 9:00 am

Duration: 34 hours

Reverse Auction Document

✅ RA concluded. Check financial results for final rankings.

Technical Results

S.No Seller Item Date Status
1
ASTHAVINAYAK ENTERPRISES   Under PMA
-05-02-2026 22:48:10
2
ESS KAY POWER SYSTEMS   Under PMA
-07-02-2026 16:34:35
3
M/S RIDDHI SIDDHI FOODKRAFTS   Under PMA
-06-02-2026 20:53:17
4
S. A. ENTERPRISE   Under PMA
-07-02-2026 18:52:46

Reverse Auction Results Final Prices

These are the final prices after the reverse auction event. Prices may be lower than initial bids.

Rank Seller Final Price Item
L1ASTHAVINAYAK ENTERPRISES(MII)   Under PMA Winner ₹39,53,117Item Categories : Modular switch socket combination 15 oblique 16 Amp with gang box,Modular switch socket combination
L2ESS KAY POWER SYSTEMS (MII)   Under PMA₹41,93,386Item Categories : Modular switch socket combination 15 oblique 16 Amp with gang box,Modular switch socket combination
L3M/S RIDDHI SIDDHI FOODKRAFTS (MII)   Under PMA₹44,05,952Item Categories : Modular switch socket combination 15 oblique 16 Amp with gang box,Modular switch socket combination

🎉 L1 Winner

ASTHAVINAYAK ENTERPRISES(MII)   Under PMA

Final Price: ₹39,53,117

Frequently Asked Questions

Key insights about ASSAM tender market

How to bid in Indian Army goods tender 2026 in India

Bidders must meet eligibility: 3+ years govt/PSU supply experience, maintain the required turnover, and provide EMD of ₹119,000 with PAN, GSTIN, cancelled cheque, and EFT mandate. Ensure OEM/brand compliance, submit contract copies for annual turnover, and follow the option clause for quantity adjustments up to 25%.

What documents are required for Army procurement bid in India 2026

Required documents include PAN, GSTIN, cancelled cheque, EFT mandate, audited financial statements or CA certificate showing turnover, experience certificates for govt/PSU supplies (3+ years), OEM authorization if applicable, and technical bid documents per terms. These support vendor code creation and eligibility.

What are the technical specifications for the Army goods tender 2026

The tender specifies scope is goods supply with 146 BOQ items; exact technical specs not provided in data. Bidders should rely on standard govt procurement norms and ensure product meets OEM/brand requirements, with demonstration of prior govt supply contracts to verify capability.

What are the EMD and turnover requirements for this Army tender

EMD is ₹119,000. Bidder and OEM must show minimum average annual turnover for the last 3 years ending 31st March, with audited statements or CA certificate. If company is under 3 years old, turnover is computed from post-incorporation years as per bid.

When is delivery expected under the Army option clause in 2026

Delivery starts from the last date of the original delivery order; if quantity increases, the additional time equals (increase/original) × original period, with a minimum of 30 days. The purchaser may extend to match original delivery period while exercising the option.

How to verify OEM requirements for Army procurement 2026

Submit OEM authorization or reseller agreements proving manufacturing capability. Provide prior government/PSU supply contracts showing quantity and value per year. Ensure the offered product aligns with the OEM's documented experience and turnover, and attach relevant manufacturer certificates during bid submission.

What is the scope of supply in this Army tender 2026

Scope is strictly supply of goods (no services). Bidders should price the full cost to deliver goods as per BOQ and include all ancillary costs in the bid price. Ensure compliance with vendor code creation prerequisites and submission of requested financial documents.