TenderDekho Logo
Closed GEM

Border Roads Organisation General Equipment Tender Andaman & Nicobar 2025 – EMD ₹342,498, 50% Qty Option, NICOBAR

Bid Publish Date

21-Dec-2025, 4:11 pm

Bid End Date

03-Jan-2026, 5:00 pm

EMD

₹3,42,498

Value

₹1,14,16,623

Generate Docs

Progress

Issue21-Dec-2025, 4:11 pm
Corrigendum31-Dec-2025
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

11424

Category

Prefab Shelter of size 12.30 M X 6.1 M along with 1.5 M verandah

Bid Type

Two Packet Bid

Key Highlights

  • Exact EMD amount: ₹342,498 and DD payable to Commander 46 TF Border Roads; SBI Port Blair
  • 50% quantity increase option during contract and proportional extension of delivery period
  • Past project experience: last 3 financial years with thresholds (35%/20%/15%) for single/multiple orders
  • Mandatory OEM Authorization by GeM-registered OEMs for relevant bid category
  • Mandatory performance certificates from the buyer for prior orders; mandatory for bid compliance
  • Delivery/extension mechanics: minimum 30 days extension, or according to formula
  • Submission deadline implications: hard copy to buyer within 5 days of bid end/opening
  • NICOBAR island execution requirement; Greater Nicobar geographic focus

Categories 110

Tender Overview

Border Roads Organisation invites bids for general equipment procurement in the NICOBAR district, Andaman & Nicobar 744301. The estimated value is ₹11,416,623 with an EMD of ₹342,498. The procurement includes a flexible quantity option allowing up to 50% increase in bid quantity and a proportional extension of delivery periods. Bidders must demonstrate prior similar deployments to government projects and provide satisfactory performance certificates. An OEM authorisation requirement is specified. This tender emphasizes local execution in Greater Nicobar islands and mandates a bank instrument for EMD payable to Commander 46 TF Border Roads at SBI Port Blair.

Technical Specifications & Requirements

  • No product specifications are published in the tender summary; bidders should rely on BOQ items and ATC clauses.
  • Key eligibility cues include: past project experience in supply/installation/commissioning of similar category products within the last 3 financial years; single order value ≥ 35% of estimated bid value or two orders each ≥ 20% or three orders each ≥ 15%.
  • EMD amount: ₹342,498; submit via Demand Draft payable to Commander 46 TF Border Roads and upload scanned DD proof with bid; hard copy to Buyer within 5 days of bid end/date.
  • Mandatory OEM authorization by GeM-registered OEMs for the bid category; ensure OEM authorization is attached.
  • The option clause allows alteration of delivery timelines proportional to quantity changes with a minimum 30 days extension.

Terms, Conditions & Eligibility

  • EMD: ₹342,498; payment via Account Payee DD to SBI Port Blair; scanned DD proof to be uploaded; hard copy due within 5 days of bid end/opening.
  • Experience: last 3 financial years; single order ≥ 35% of estimated bid value or two orders ≥ 20% or three orders ≥ 15%; satisfactory performance certificates required.
  • Delivery & Option Clause: up to 50% quantity variation; delivery period calculated as (additional quantity/original quantity) × original delivery period with a minimum of 30 days; extended delivery may be allowed up to original period.
  • OEM Authorization: mandatory from GeM-registered OEMs for relevant bid category; attach OEM authorization with bid.
  • Submission: include experience certificates, performance certificates, GST, PAN, financials, technical compliance, EMD DD, and OEM authorizations; hard copy must reach within 5 days of bid end/opening.

Key Specifications

  • Past project experience criteria with order value thresholds (35%, 20%, 15% of estimated bid value)

  • EMD amount: ₹342,498; payment via DD to SBI Port Blair

  • OEM authorization requirement for GeM category items

  • Delivery extension mechanism: (additional quantity / original quantity) × original delivery period, min 30 days

  • Bid submission includes scanned DD proof and hard copy within 5 days

Terms & Conditions

  • EMD to be paid via Demand Draft to SBI Port Blair; must upload DD proof

  • 3-year experience requirement with measurable order value thresholds

  • 50% quantity variation right and corresponding delivery extension under option clause

Important Clauses

Payment Terms

EMD ₹342,498; DD payable to Commander 46 TF Border Roads; scanned DD proof to be uploaded; hard copy due within 5 days of bid end/opening

Delivery Schedule

Delivery period can extend with quantity variation up to 50%; minimum additional time 30 days; extension may occur during currency of contract

Penalties/Liquidated Damages

Not explicitly specified in provided data; bidders should verify ATC for LD clauses

Bidder Eligibility

  • Experience in supplying and installing similar category products within last 3 financial years

  • Single order value ≥ 35% of estimated bid value or multiple orders meeting 20%/15% thresholds

  • OEM authorization from GeM-registered OEMs for relevant bid category

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Authority Records

MINISTRY OF DEFENCEDEFENCE DEPARTMENTBORDER ROADS ORGANISATION

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-8745385.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 153 Items Sign in for GEM prices

#1

Prefab Shelter of size 12.30 M X 6.1 M along with 1.5 M verandah

Specification as per Buyer Uploaded ATC Document

1 nos Delivery: 90 days
#2

Wall Mounted Fan with regulator

Specification as per Buyer Uploaded ATC Document

2 nos Delivery: 45 days
#3

Stand Fan

Specification as per Buyer Uploaded ATC Document

8 nos Delivery: 45 days
#4

Steel Almirahs

Specification as per Buyer Uploaded ATC Document

12 nos Delivery: 45 days
#5

GI Flat 40 x 5 mm

Specification as per Buyer Uploaded ATC Document

497 kg Delivery: 45 days
#6

GI Bolt

Specification as per Buyer Uploaded ATC Document

140 kg Delivery: 45 days
#7

Enamel Paint

Specification as per Buyer Uploaded ATC Document

165 ltr Delivery: 45 days
#8

Lime

Specification as per Buyer Uploaded ATC Document

297 kg Delivery: 45 days
#9

Double Bed

Specification as per Buyer Uploaded ATC Document

18 nos Delivery: 45 days
#10

Mattress Double Bed

Specification as per Buyer Uploaded ATC Document

18 nos Delivery: 45 days
#11

Pillow

Specification as per Buyer Uploaded ATC Document

18 nos Delivery: 45 days
#12

Peg Table

Specification as per Buyer Uploaded ATC Document

72 nos Delivery: 45 days
#13

Bed Lamp Table with Lamp

Specification as per Buyer Uploaded ATC Document

18 nos Delivery: 45 days
#14

Single Seat Sofa

Specification as per Buyer Uploaded ATC Document

36 nos Delivery: 45 days
#15

Verandah Chair Set

Specification as per Buyer Uploaded ATC Document

18 nos Delivery: 45 days
#16

2 Inch Soft Cotton Bed Mattress

Specification as per Buyer Uploaded ATC Document

50 nos Delivery: 45 days
#17

Polycab 4 sqmm 3 core Black Copper Flexible Unsulated Frl Cable

Specification as per Buyer Uploaded ATC Document

4 roll Delivery: 45 days
#18

Copper Wire and Cable Size 4 mm X 2 Core

Specification as per Buyer Uploaded ATC Document

200 mtr Delivery: 45 days
#19

Copper Wire Size 1.5 mm

Specification as per Buyer Uploaded ATC Document

200 mtr Delivery: 45 days
#20

LED Tube Light 40 watt

Specification as per Buyer Uploaded ATC Document

20 nos Delivery: 45 days
#21

LED Bulb 9 W

Specification as per Buyer Uploaded ATC Document

20 nos Delivery: 45 days
#22

PVC Pipe half inch

Specification as per Buyer Uploaded ATC Document

100 mtr Delivery: 45 days
#23

PVC Bend Half Inch

Specification as per Buyer Uploaded ATC Document

20 nos Delivery: 45 days
#24

PVC Coupler Half Inch

Specification as per Buyer Uploaded ATC Document

20 nos Delivery: 45 days
#25

CPVC Pipe 2 inch

Specification as per Buyer Uploaded ATC Document

150 mtr Delivery: 45 days
#26

Ceiling Fan 48 inch

Specification as per Buyer Uploaded ATC Document

12 nos Delivery: 45 days
#27

CPVC Coupling 2 inch

Specification as per Buyer Uploaded ATC Document

20 nos Delivery: 45 days
#28

CPVC Bend 2 inch

Specification as per Buyer Uploaded ATC Document

20 nos Delivery: 45 days
#29

Exhaust Fan Heavy Duty

Specification as per Buyer Uploaded ATC Document

4 nos Delivery: 45 days
#30

Switch and Socket Combination 15 Amp

Specification as per Buyer Uploaded ATC Document

2 nos Delivery: 45 days
#31

Fan Regulator

Specification as per Buyer Uploaded ATC Document

12 nos Delivery: 45 days
#32

Tube Light LED 4 ft Long

Specification as per Buyer Uploaded ATC Document

2 nos Delivery: 45 days
#33

Ceiling Rose

Specification as per Buyer Uploaded ATC Document

24 nos Delivery: 45 days
#34

Switch Board 4 inch X 4inch

Specification as per Buyer Uploaded ATC Document

24 nos Delivery: 45 days
#35

Electric Wire 1.5 sqmm Red

Specification as per Buyer Uploaded ATC Document

1 roll Delivery: 45 days
#36

Electric Wire 4 sqmm Black

Specification as per Buyer Uploaded ATC Document

2 roll Delivery: 45 days
#37

Electric Wire 4 sqmm Red

Specification as per Buyer Uploaded ATC Document

3 roll Delivery: 45 days
#38

MCBC 40 Amp DP

Specification as per Buyer Uploaded ATC Document

1 set Delivery: 45 days
#39

Conduit Pipe PVC 25 mm

Specification as per Buyer Uploaded ATC Document

28 mtr Delivery: 45 days
#40

PVC Bend 25 mm

Specification as per Buyer Uploaded ATC Document

25 nos Delivery: 45 days
#41

4 Point Box PVC

Specification as per Buyer Uploaded ATC Document

20 nos Delivery: 45 days
#42

Insulation Tape

Specification as per Buyer Uploaded ATC Document

10 roll Delivery: 45 days
#43

Cutting Plier

Specification as per Buyer Uploaded ATC Document

1 nos Delivery: 45 days
#44

Apex Exterior Wall Primer

Specification as per Buyer Uploaded ATC Document

30 ltr Delivery: 45 days
#45

Apex Exterior Paint

Specification as per Buyer Uploaded ATC Document

30 ltr Delivery: 45 days
#46

Paint Roller 30 cm

Specification as per Buyer Uploaded ATC Document

2 nos Delivery: 45 days
#47

Paint Brush 4 inch

Specification as per Buyer Uploaded ATC Document

2 nos Delivery: 45 days
#48

Door Curtains

Specification as per Buyer Uploaded ATC Document

2 set Delivery: 45 days
#49

Window Curtains

Specification as per Buyer Uploaded ATC Document

8 set Delivery: 45 days
#50

Chequered Tile 300 mm X 300 mm X 25 mm

Specification as per Buyer Uploaded ATC Document

260 nos Delivery: 45 days
#51

Green Blackboard

Specification as per Buyer Uploaded ATC Document

2 nos Delivery: 45 days
#52

Armoured UG Round Cable 35 sqmm 3.4 core

Specification as per Buyer Uploaded ATC Document

400 mtrs Delivery: 45 days
#53

UG DWC pipe 2 inch

Specification as per Buyer Uploaded ATC Document

400 mtrs Delivery: 45 days
#54

Main switch Board Box

Specification as per Buyer Uploaded ATC Document

4 nos Delivery: 45 days
#55

MCB Panel Box With cut off switch 10 Nos MCB

Specification as per Buyer Uploaded ATC Document

12 nos Delivery: 45 days
#56

MCB DB

Specification as per Buyer Uploaded ATC Document

17 nos Delivery: 45 days
#57

MCB SPN

Specification as per Buyer Uploaded ATC Document

18 nos Delivery: 45 days
#58

MCB SP 10 Amp

Specification as per Buyer Uploaded ATC Document

41 nos Delivery: 45 days
#59

MCB SP 20 Amp

Specification as per Buyer Uploaded ATC Document

42 nos Delivery: 45 days
#60

MCB 25 Amp

Specification as per Buyer Uploaded ATC Document

21 nos Delivery: 45 days
#61

MCB 100 Amp 25 KA

Specification as per Buyer Uploaded ATC Document

4 nos Delivery: 45 days
#62

MCB DBSPN 4 Way

Specification as per Buyer Uploaded ATC Document

3 nos Delivery: 45 days
#63

MCB TPN 63A

Specification as per Buyer Uploaded ATC Document

4 nos Delivery: 45 days
#64

MCB TPN 40A

Specification as per Buyer Uploaded ATC Document

8 nos Delivery: 45 days
#65

GI Tee 2 inch

Specification as per Buyer Uploaded ATC Document

2 nos Delivery: 45 days
#66

GI Reducer 2 inch to 1 inch

Specification as per Buyer Uploaded ATC Document

2 nos Delivery: 45 days
#67

GI Pipe1 inch

Specification as per Buyer Uploaded ATC Document

100 mtr Delivery: 45 days
#68

GI Elbow 1 inch

Specification as per Buyer Uploaded ATC Document

6 nos Delivery: 45 days
#69

GI Union Socket 2 inch

Specification as per Buyer Uploaded ATC Document

2 nos Delivery: 45 days
#70

GI Union Socket 1 inch

Specification as per Buyer Uploaded ATC Document

3 nos Delivery: 45 days
#71

Gate Valve 1 inch

Specification as per Buyer Uploaded ATC Document

10 nos Delivery: 45 days
#72

Tank Nipple 1 inch

Specification as per Buyer Uploaded ATC Document

9 nos Delivery: 45 days
#73

Thread Seal Taflon Tape

Specification as per Buyer Uploaded ATC Document

26 roll Delivery: 45 days
#74

Sintex Tank 5KL

Specification as per Buyer Uploaded ATC Document

1 nos Delivery: 45 days
#75

PVC Union 1 inch

Specification as per Buyer Uploaded ATC Document

9 nos Delivery: 45 days
#76

PVC TEE 1 inch

Specification as per Buyer Uploaded ATC Document

9 nos Delivery: 45 days
#77

PVC Pipe 1 inch

Specification as per Buyer Uploaded ATC Document

145 mtr Delivery: 45 days
#78

PVC Elbow 1 inch

Specification as per Buyer Uploaded ATC Document

28 nos Delivery: 45 days
#79

Solvent

Specification as per Buyer Uploaded ATC Document

13 bottle Delivery: 45 days
#80

Sintax Tank 1 KL

Specification as per Buyer Uploaded ATC Document

1 nos Delivery: 45 days
#81

PVC Elbow 4 inch

Specification as per Buyer Uploaded ATC Document

22 nos Delivery: 45 days
#82

PVC Bend 4 inch

Specification as per Buyer Uploaded ATC Document

12 nos Delivery: 45 days
#83

PVC Elbow 4 inch

Specification as per Buyer Uploaded ATC Document

6 nos Delivery: 45 days
#84

White Cement

Specification as per Buyer Uploaded ATC Document

110 kg Delivery: 45 days
#85

Wall Primer

Specification as per Buyer Uploaded ATC Document

19 ltr Delivery: 45 days
#86

Wall Putty

Specification as per Buyer Uploaded ATC Document

182 kgs Delivery: 45 days
#87

Paint for Wall Surface

Specification as per Buyer Uploaded ATC Document

19 ltr Delivery: 45 days
#88

Planks 10ft X1ft X1.5 inch

Specification as per Buyer Uploaded ATC Document

10 nos Delivery: 45 days
#89

Shuttering Plate 600 mmX1250 mm

Specification as per Buyer Uploaded ATC Document

20 nos Delivery: 45 days
#90

Shuttering Plate 1000 mmX1000 mm

Specification as per Buyer Uploaded ATC Document

20 nos Delivery: 45 days
#91

Plywood 8ft X4ft X19mm

Specification as per Buyer Uploaded ATC Document

20 nos Delivery: 45 days
#92

Wall Putty Blade

Specification as per Buyer Uploaded ATC Document

10 nos Delivery: 45 days
#93

Roller brush

Specification as per Buyer Uploaded ATC Document

10 nos Delivery: 45 days
#94

Red Paint for Chequred Tiles

Specification as per Buyer Uploaded ATC Document

84 ltr Delivery: 45 days
#95

PVC Coated GI Chain link Fencing

Specification as per Buyer Uploaded ATC Document

922 kg Delivery: 45 days
#96

GI steel Flat 40 mm with and 3 mm thick

Specification as per Buyer Uploaded ATC Document

317 kg Delivery: 45 days
#97

GI Bolt of size 12 mm dia X 150 mm length

Specification as per Buyer Uploaded ATC Document

33 kg Delivery: 45 days
#98

Galvanized Iron Angle 75 mm X75 mm X 8 mm

Specification as per Buyer Uploaded ATC Document

1,600 kg Delivery: 45 days
#99

Galvanized Iron Angle 50 mm X 50 mm X 5 mm

Specification as per Buyer Uploaded ATC Document

1,000 kg Delivery: 45 days
#100

Galvanized Flats 50 mm X 5 mm

Specification as per Buyer Uploaded ATC Document

150 kg Delivery: 45 days
#101

Enamel Paint

Specification as per Buyer Uploaded ATC Document

20 litre Delivery: 45 days
#102

White Cement

Specification as per Buyer Uploaded ATC Document

200 kg Delivery: 45 days
#103

Shuttering Plate 300 mm X 1250 mm

Specification as per Buyer Uploaded ATC Document

40 nos Delivery: 45 days
#104

Planks 10 ft X 1 inch X1.5 inch

Specification as per Buyer Uploaded ATC Document

40 nos Delivery: 45 days
#105

Pedestal Fan heavy duty with rotating access

Specification as per Buyer Uploaded ATC Document

10 nos Delivery: 45 days
#106

Supreme Ornate Plastic Chair with cushion

Specification as per Buyer Uploaded ATC Document

20 nos Delivery: 45 days
#107

Air conditioner 02 Ton

Specification as per Buyer Uploaded ATC Document

2 nos Delivery: 45 days
#108

Refrigerator 220 Lit

Specification as per Buyer Uploaded ATC Document

1 nos Delivery: 45 days
#109

Bed side table table with drawer small size

Specification as per Buyer Uploaded ATC Document

100 nos Delivery: 45 days
#110

Writing Table Wooden Size 3 ft X 2ft3inch

Specification as per Buyer Uploaded ATC Document

30 nos Delivery: 45 days
#111

Chair with Cushion

Specification as per Buyer Uploaded ATC Document

30 nos Delivery: 45 days
#112

Peg Table wooden

Specification as per Buyer Uploaded ATC Document

30 nos Delivery: 45 days
#113

Almirah Small Steel

Specification as per Buyer Uploaded ATC Document

6 nos Delivery: 45 days
#114

Bathroom Towel Hanger 2ft Long

Specification as per Buyer Uploaded ATC Document

25 nos Delivery: 45 days
#115

Mirror with Cabinet 2ft X 1.5 ft

Specification as per Buyer Uploaded ATC Document

25 nos Delivery: 45 days
#116

Sofa 5 Seater

Specification as per Buyer Uploaded ATC Document

3 nos Delivery: 45 days
#117

AC for Mess 2 Ton

Specification as per Buyer Uploaded ATC Document

2 nos Delivery: 45 days
#118

Coir Mattress Sleepwell

Specification as per Buyer Uploaded ATC Document

30 nos Delivery: 45 days
#119

Pillow SleepWell

Specification as per Buyer Uploaded ATC Document

30 nos Delivery: 45 days
#120

Door with Mosquito Net Aluminium

Specification as per Buyer Uploaded ATC Document

30 nos Delivery: 45 days
#121

Bull Float

Specification as per Buyer Uploaded ATC Document

12 nos Delivery: 45 days
#122

Buildskill Concrete Joint Cutter

Specification as per Buyer Uploaded ATC Document

17 nos Delivery: 45 days
#123

C- Channel 6 inch

Specification as per Buyer Uploaded ATC Document

500 mtr Delivery: 45 days
#124

Exterior Emulsion Paint

Specification as per Buyer Uploaded ATC Document

517 kg Delivery: 45 days
#125

Interior Emulsion Paint

Specification as per Buyer Uploaded ATC Document

347 kg Delivery: 45 days
#126

Paint White

Specification as per Buyer Uploaded ATC Document

60 litre Delivery: 45 days
#127

Wall Putty

Specification as per Buyer Uploaded ATC Document

300 kg Delivery: 45 days
#128

Red Oxide

Specification as per Buyer Uploaded ATC Document

60 litre Delivery: 45 days
#129

Anti Rusting Paint

Specification as per Buyer Uploaded ATC Document

40 litre Delivery: 45 days
#130

Barbed Wire

Specification as per Buyer Uploaded ATC Document

2 roll Delivery: 45 days
#131

UPVC Door with Frame Bathroom 0.77 m x 2.05 m

Specification as per Buyer Uploaded ATC Document

4 nos Delivery: 45 days
#132

Exhaust Fan 300 mm

Specification as per Buyer Uploaded ATC Document

5 nos Delivery: 45 days
#133

Plywood Table for Ironing

Specification as per Buyer Uploaded ATC Document

1 nos Delivery: 45 days
#134

Mirror 2 ft x 4 ft

Specification as per Buyer Uploaded ATC Document

2 nos Delivery: 45 days
#135

Bathroom Mirror 450 mm x 600 mm

Specification as per Buyer Uploaded ATC Document

6 nos Delivery: 45 days
#136

Tube Lights

Specification as per Buyer Uploaded ATC Document

10 nos Delivery: 45 days
#137

LED Bulb 20W

Specification as per Buyer Uploaded ATC Document

15 nos Delivery: 45 days
#138

Steel Almirah Medium Size

Specification as per Buyer Uploaded ATC Document

2 nos Delivery: 45 days
#139

Electric Wire 1.5 sqmm

Specification as per Buyer Uploaded ATC Document

5 nos Delivery: 45 days
#140

Switch

Specification as per Buyer Uploaded ATC Document

50 nos Delivery: 45 days
#141

Socket

Specification as per Buyer Uploaded ATC Document

25 nos Delivery: 45 days
#142

Insulation Tape

Specification as per Buyer Uploaded ATC Document

50 nos Delivery: 45 days
#143

Cutting Plier

Specification as per Buyer Uploaded ATC Document

5 nos Delivery: 45 days
#144

Flexible Wiring Pipe Half inch

Specification as per Buyer Uploaded ATC Document

100 nos Delivery: 45 days
#145

Ceiling Fan

Specification as per Buyer Uploaded ATC Document

10 nos Delivery: 45 days
#146

Pedestal Fan

Specification as per Buyer Uploaded ATC Document

2 nos Delivery: 45 days
#147

Double Door Wardrobe 90 cm x 60 cm x 183 cm

Specification as per Buyer Uploaded ATC Document

4 nos Delivery: 45 days
#148

Open Wooden Rack 3 Tiers 1200 mm x 600 mm x 183 mm

Specification as per Buyer Uploaded ATC Document

4 nos Delivery: 45 days
#149

Wooden Table 3 ft x 4.5 ft

Specification as per Buyer Uploaded ATC Document

1 nos Delivery: 45 days
#150

Wooden Centre Table 2 ft x 4 ft

Specification as per Buyer Uploaded ATC Document

2 nos Delivery: 45 days
#151

Painting Brush 2inch 3inch 4inch

Specification as per Buyer Uploaded ATC Document

20 nos Delivery: 45 days
#152

Painting Roller

Specification as per Buyer Uploaded ATC Document

5 nos Delivery: 45 days
#153

PPGI Sheet 8 ft

Specification as per Buyer Uploaded ATC Document

10 nos Delivery: 45 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar supply/installation/commissioning work (last 3 financial years)

4

Satisfactory performance certificates from respective buyers

5

Financial statements to demonstrate liquidity/turnover

6

EMD via Demand Draft; scanned DD proof uploaded

7

OEM authorization letters from GeM-registered OEMs

8

Technical bid/compliance documents as required by ATC

9

Proof of delivery capabilities for Greater Nicobar island projects

Corrigendum Updates

1 Update
#1

Update

31-Dec-2025

Extended Deadline

03-Jan-2026, 5:00 pm

Opening Date

03-Jan-2026, 5:30 pm

Frequently Asked Questions

Key insights about ANDAMAN & NICOBAR tender market

What documents are required for tender in Andaman NICOBAR general equipment procurement

Bidders must submit GST registration, PAN, financial statements, experience certificates for the last 3 financial years, performance certificates from buyers, EMD via Demand Draft ₹342,498 payable to Commander 46 TF Border Roads, OEM authorization from GeM-registered OEMs, and technical bid documents; upload scanned proofs and provide hard copies within 5 days of bid end/opening.

How is the 50% quantity option implemented in this Border Roads Organisation tender in NICOBAR

The purchaser reserves the right to increase the bid quantity by up to 50% during contract placement and during the contract currency; delivery period extends proportionally using the formula (additional quantity/original quantity) × original delivery period, with a minimum 30 days.

What is the EMD amount and payment method for BR0 NICOBAR bid 2025

EMD is ₹342,498; payment must be made via Account Payee Demand Draft in favor of Commander 46 TF Border Roads, payable at SBI Port Blair. Bidder must upload a scanned copy of the DD with the bid and deliver the hard copy within 5 days after bid end/opening.

What are the past project experience requirements for this BR0 tender in Greater Nicobar

Bidders must show experience in supplying/installing similar category products in the last 3 financial years; options include one order ≥ 35% of estimated bid value, or two orders ≥ 20%, or three orders ≥ 15%; satisfactory performance certificates from buyer organizations are mandatory.

What OEM authorization is required for GeM category items in this tender

Mandatory OEM authorization from GeM-registered OEMs for the relevant bid category; ensure the OEM authorization letter is attached to the bid package, to validate product provenance and post-installation support requirements.

Where will delivery and installation of equipment be undertaken for this NICOBAR project

Delivery and installation are targeted for Greater Nicobar island projects under BR0; bidders should confirm capability to service remote island locations and ensure logistics planning aligns with NICOBAR port facilities and local administrative requirements.

What is the expected timeline for bid submission and required ATC compliance

Submit per GeM timelines; ATC clauses require meeting option-quantity delivery terms, OEM authorisation, and performance certificates; ensure scanned and hard-copy documents reach the specified range within 5 days post bid end/opening.