Indian Army Department Of Military Affairs Spare Parts Tender 2026 for Sleeve Cylinder Assy to Fuel Filter and More
Indian Army
BUDGAM, JAMMU & KASHMIR
Progress
Quantity
8
Category
BRAKE PAD
Bid Type
Two Packet Bid
Indian Army seeks procurement of brake, filter, bulb, and relay components across 8 items with a total estimated value of ₹24,136.00. Procurement scope covers BRAKE PAD, OIL FILTER, AIR FILTER, BULB, OIL SEAL, BRAKE SHOE, RETURN SPRING, RELAY. No specific delivery location is given; the scope aligns with military automotive spares. The buyer reserves quantity variation up to 25% during contract placement and currency at contracted rates, with delivery timelines tied to the original period and extended periods per option. The tender emphasizes ISO 9001 certification and material test documentation, targeting compliant OEMs and bidders meeting turnover criteria. Unique aspects include OEM turnover considerations for bunch bids and mandatory certification submission.
Key Term 1: 25% quantity variation allowed during/within contract period
Key Term 2: ISO 9001 certification mandatory for bidder or OEM
Key Term 3: Material Test Certificate required with supply
Purchaser may increase/decrease bid quantity up to 25% at contracted rates; delivery time adjusts proportionally with a minimum of 30 days
Bidder and OEM must provide turnover proof via audited statements or CA certificate for last 3 financial years
ISO 9001 certification and Material Test Certificate are mandatory; non-submission leads to bid rejection
Minimum average annual turnover as specified for bidder and OEM over last 3 years
ISO 9001 certification for bidder or OEM
Submission of Material Test Certificate with supply
OEM authorisation if bidding on behalf of OEM or as OEM bidder
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
BUDGAM, JAMMU & KASHMIR
Armed Forces Tribunal
CENTRAL DELHI, DELHI
Indian Army
KOLKATA, WEST BENGAL
Indian Army
GURDASPUR, PUNJAB
Indian Army
JALPAIGURI, WEST BENGAL
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | BRAKE PAD | BRAKE PAD | 1 | nos | manoj303fwc | 16 |
| 2 | OIL FILTER | OIL FILTER | 1 | nos | manoj303fwc | 16 |
| 3 | AIR FILTER | AIR FILTER | 1 | nos | manoj303fwc | 16 |
| 4 | BULB | BULB | 1 | nos | manoj303fwc | 16 |
| 5 | OIL SEAL | OIL SEAL | 1 | nos | manoj303fwc | 16 |
| 6 | BRAKE SHOE | BRAKE SHOE | 1 | nos | manoj303fwc | 16 |
| 7 | RETURN SPRING | RETURN SPRING | 1 | nos | manoj303fwc | 16 |
| 8 | RELAY | RELAY | 1 | nos | manoj303fwc | 16 |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Audited financial statements for last 3 years or CA certificate indicating turnover
ISO 9001 certificate ( bidder or OEM )
Material Test Certificate for each supply
OEM authorisation certificate (if bidding as OEM or on behalf of OEM)
Experience certificates or relevant project documents
Technical bid documents and any ATC/corrigendum compliance evidence
Key insights about ASSAM tender market
Bidders must meet turnover criteria for last 3 years, provide ISO 9001 certification, and submit Material Test Certificate with the supply. Include GST, PAN, audited financials or CA turnover certificates, and OEM authorisation if applicable. Ensure all eight item categories are covered in the bid.
Required documents include GST certificate, PAN, audited financial statements or CA turnover, ISO 9001 certificate, Material Test Certificate, OEM authorisation (if applicable), experience certificates, and technical bid documents. Submit evidence for turnover and compliance with ISI/standards as applicable.
The tender requires ISO 9001 certification for bidder or OEM and a Material Test Certificate with supply. Ensure compliance with the standard quality documentation and any organization-specific ATC. Non-compliance can lead to bid rejection; verify each item category aligns with listed standards.
The purchaser reserves the right to vary quantity up to 25% of bid quantity at contract placement and during currency at contracted rates. Delivery time scales with the original period, with minimum extension rules ensuring additional time equals (increased quantity/original quantity) × original delivery period, minimum 30 days.
Material Test Certificate must accompany supply, enabling verification of material quality per item. It supports conformity with ISO 9001 and product standards, reducing risk of non-compliance and rejection at acceptance. Ensure certificates cover all eight item categories.
Provide audited balance sheets for the last 3 years or CA certificates indicating turnover. If the bidder/OEM is under 3 years old, use completed years post-incorporation. For bunch bids, OEM turnover criteria apply to the primary product category with the highest bid value.
Indian Air Force
Nuclear Power Corporation Of India Limited
📍 CHITTORGARH, RAJASTHAN
Border Security Force (bsf)
📍 BARMER, RAJASTHAN
Indian Coast Guard
📍 MUMBAI, MAHARASHTRA
Bhakra Beas Management Board
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS