1.10302001500 Double Internal Gear Pump
National Aluminium Company Limited, Bhubaneswar
KORAPUT, ODISHA
Bid Publish Date
25-Feb-2026, 2:01 pm
Bid End Date
18-Mar-2026, 4:00 pm
Progress
Quantity
1
Bid Type
Two Packet Bid
Bharat Earth Movers Limited (BEML) invites bids for the TRIPLE GEAR PUMP under the Defence Production framework. Scope is limited to the supply of goods, with no BOQ items listed, suggesting a direct procurement of pump units. While start/end dates are not published, the opportunity centers on a single, focused mechanical component likely requiring OEM-grade alignment and compatibility with defense-grade assemblies. A key differentiator is the option clause permitting up to 50% quantity variation at contracted rates, demanding flexible manufacturing and supply planning. The tender emphasizes GST handling and potential price adjustments per GST rules, making financial readiness essential. The absence of explicit location details makes supplier qualification critical to confirm delivery feasibility and compliance with internal procurement rules. Unique terms include an R&D/Technical evaluation review for non-approved OEMs and potential developmental inquiries, signaling an emphasis on authenticated OEM sourcing and post-award evaluation. This tender hinges on precise component specification alignment, controlled pricing, and adaptable delivery scheduling within defense procurement norms.
Key Term 1: Quantity variation up to 50% with adjusted delivery period
Key Term 2: GST payable/reimbursable per actuals or applicable rates
Key Term 3: Non-approved OEMs may undergo R&D/Technical evaluation
GST handling per actuals or applicable rates; no fixed GST percentage stated
Delivery period linked to the last date of original delivery order; extended period depends on quantity variation
Not specified in data; expected under standard supply contracts
Approved OEM sourcing preferred for TRIPLE GEAR PUMP components
Experience in supplying mechanical hydraulic pumps to defense-related projects
Ability to handle 50% quantity variation with compliant delivery scheduling
Main Document
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
National Aluminium Company Limited, Bhubaneswar
KORAPUT, ODISHA
Bharat Earth Movers Limited (beml)
Bharat Earth Movers Limited (beml)
Ntpc Limited
AURANGABAD, BIHAR
Bharat Heavy Electricals Limited (bhel)
Sri Ganganagar, RAJASTHAN
Tender Results
Loading results...
Discover companies most likely to bid on this tender
- GST registration certificate
- Permanent Account Number (PAN) card
- Experience certificates for similar gear pump supply
- Financial statements (last 2-3 years)
- EMD/ bid security documentation (as applicable)
- Technical bid documents and OEM authorization letters (for OEMs)
- Any prior compliance certificates or quality certifications
To bid, ensure OEM authorization or prepare for the R&D/Technical evaluation if non-approved. Submit GST, PAN, experience certificates, financials, and EMD if required. Verify delivery flexibility under the 50% quantity option and align with defense procurement standards for gear pumps.
Required documents include GST certificate, PAN, experience certificates for gear pump supply, financial statements, EMD documentation, technical bid, and OEM authorizations. Ensure OEM confirmation or readiness for R&D evaluation if not an approved OEM.
Delivery terms allow up to 50% quantity variation. The extended delivery time is calculated as (additional quantity/original quantity) × original delivery period, with a minimum of 30 days. Delivery clocks start from the last date of the original order.
GST reimbursement will be based on actual GST or applicable rates, whichever is lower, limited to the quoted GST percentage. Suppliers should account for GST either as payable or eligible for reimbursement per government rules.
Bidders should be an approved OEM or undergo R&D/Technical evaluation for non-approved OEMs. Prior experience supplying similar pumps to defense or related mechanical systems is preferred, with documentation to prove capability and financial stability.
No BOQ items are listed in the supplied data. Bidders should prepare a unit price for the TRIPLE GEAR PUMP and be ready for possible quantity adjustments up to 50% and corresponding delivery schedule changes.
Sign up now to access all documents
Main Document
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS