Procurement Opportunity: Round the clock operation and preventive maintenance work,Dismantling and shifting of ASP,Shifting in SONBHADRA, UTTAR PRADESH

Bid Publish Date

10-Jul-2026, 7:24 pm

Bid End Date

12-Aug-2026, 12:00 pm

EMD

₹11,28,000

Value

₹8,87,26,430

Progress

Issue10-Jul-2026, 7:24 pm
AwardPending
Explore all 6 tabs to view complete tender details

Quantity

33143

Category

Round the clock operation and preventive maintenance work

Bid Type

Two Packet Bid

Categories 178

AGITATORS FLEET OWNER WIND MILL ENERGY PROJECT APPARELS PLATFORM SCALE ALIGNMENT JIG MILK COLLECTING SYSTEMS MILD STEEL PIPE APFC PANEL AMMONIA ALUM PURE BARITONE HORNS PRECIOUS METAL SCRAP STRUCTURE FABRICATION HOSPITALITY RELATED SERVICES ALUM WATER TREATMENT PLANT MECHANICAL WORK VACUUM PUMPS COMPRESSOR MOSQUITO REPELLENT MS PIPE CLINKER GRINDER ELECTROSTATIC PRECIPITATOR PIPE PROJECT TUBE AND FITTING ARNO STARTING CONTACTOR AIR COOLED ENGINE DESERT COOLER JCB AMC OF COMPUTER DOSING PUMP AIR BRAKE MILKING MACHINE WHEAT FLOUR AGRICULTURAL MACHINERY LAWN PUMP REPAIR AGRICULTURE EQUIPMENT AMC OF DESKTOP MOBILE VEHICLE STEEL FURNITURE TICKETING MACHINE HARDWARE AND FASTENERS LI-ION BATTERY LOADER WELL TESTING EQUIPMENTS HIGH VACUUM AGRICULTURAL PUMP FABRICATION WORK SOLENOID PUMPS RUBBER GASKET ASH PLANT OPERATION MAINTENANCE ASH HANDLING SYSTEM CLOTHING GRINDER DEVELOPMENT WORK AMC OF ELECTRONIC VACCUM PUMP ASH HANDLING PLANT MUSICAL INSTRUMENT PARTS AND ACCESSORIES WATER DRAINAGE ULTRACENTRIFUGES METERING PUMPS DEEPWELL PUMPS IRRIGATION PUMPS MILITARY VEHICLE STOMACHERS MAINTENANCE CONTRACT OF ELECTRONIC PUMPS TRANSPORTATION COOLER GEAR BOX HIGH PRESSURE PUMP WATER LINE SLUDGE PUMPS POWER REFRIGERATED INCUBATORS ALUMINIUM ALLOY SEALING RING SCAFFOLDING WATER METERS BATTERY AND CELL AC PIPES AIR COMPRESSOR SLURRY PUMP WAC FEEDER DUMPER HYDRAULIC BRAKE MACHINERY REPAIRS SILO FLUID MECHANICS EQUIPMENT BUILDING MAINTENANCE COMPRESSED AIR VACUUM OVENS PNEUMATIC MACHINERY AIR BLOWER FLY ASH MECHANICAL COUPLINGS ULTRA SOUND THERAPY DEHYDRATION PNEUMATIC VACUUM PNEUMATIC SHEAR PUMPS BLOWERS OR DRYERS VALVES GASKETS AND SEALS PRINTER REPAIR RCC WORK NON FERRIC ALUM TECHNICAL SERVICES NUTS VERTICAL COOLER DRAINAGE SEED AND FEED EQUIPMENT BIOPSY ASPIRATOR PRODUCTS AIR INFLATORS BOX OIL PUMP PNEUMATIC TOOLS WATER LEVEL RECORDER DISPLACEMENT PUMP SANITARY FITTING WATER SUPPLY MATERIAL FILTER RETAINERS GEAR TROLLEY AIR GENERATOR FUEL PUMP FUME HOODS ERECTION OF STRUCTURAL TURBINE PUMPS FLUE GAS STEAM GENERATOR VACUUM CENTRIFUGES MICROWAVE SWITCH SAND WASHING MACHINE ROUTINE MAINTENANCE OVER HEAD TANK PIPE LAYING TURBINE OIL DEWATERING PUMP DREDGE PUMPS MUD PUMPS ROTARY VANE PUMPS TRANSPORT AGRICULTURAL EQUIPMENT BIOLOGICAL BATH TUBE WELL LUBE OIL FABRICATOR MACHINE SUBMERSIBLE PUMP MS PIPE LINE EXCAVATION ESCRAP ROTARY EVAPORATORS WATER COOLED ENGINE ROTARY COMPRESSOR ERECTION OF PIPE HYDRAULIC MATERIAL TRANSPORT VEHICLES FREEZE DRYERS PEB UPVC PIPE WATER PUMP AQUARIA EQUIPMENT WATERING FACILITY FAN METAL PRODUCTS EARTH MOVING DEVELOPMENT LIME MOTOR VEHICLES LABOUR MANUFACTURING SERVICES EARTH MOVER AMC OF AIR CONDITION

Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (uprvunl) Lucknow has released a public tender for Round the clock operation and preventive maintenance work, Dismantling and shifting of ASP, Shifting of overhauled or New ASP, OH of ASP, Dismantling and shifting of Coarse Ash Pump, Shifting of overhauled or New Coarse Ash Pump, OH of Coarse Ash Pump, Dismantling and Shifting of VP, Shifting of Overhauled or New VP, Manpower assistance for OH of VP, Manpower assistance for servicing of IAC, Manpower assistance for servicing of TAC, OH of ESP Blower, OH of IM and Terminal Silo Blower, OH of IM and Terminal Silo vent air fan, OH or Servicing of HMDC, OH or Servicing of rotary feeder, Dismantling and shifting of BALP or FWP or FAHP or BAHP or Eco Pump or HCSD Pump, Shifting of overhauled or new BALP or FWP or FAHP or BAHP or Eco Pump or HCSD Pump, OH of FWP, OH of BALP Pump, OH of FAHP Pump, OH of BAHP Pump, OH of Economizer Pump, OH of HMDC Pump, OH of HP SWP, OH of LP SWP, OH of BAOFP, OH of RWP, OH of AHP Clarifier Sludge Pump, OH of Dosing Pump, OH of AWRP, OH of RPSWP, OH of Drain Pump, OH of BAHA Jet type Drain Pump, Manpower assistance for FC of ASP, Manpower assistance for FC of Coarse Ash Pump, OH of GB of ASP, OH of GB of Coarse Ash Pump, OH of LOP of FC of ASP, Servicing of OC of FC of ASP, Servicing of TDS of Clarifier, Alignment of ASP, Rotation of AS Disposal line, Rotation of BA discharge pipe line, Replacement of MS pipe line Dia 250 NB to 350 NB, Replacement of CI pipe line Dia 200 NB to 250 NB, Ash disposal by dumper or trolley to outside Power house, Servicing of Dewatering Pump, Servicing of Submersible Pump, Removal of wornout or damage valves, Inatallation of new or repaired valves, Replacement of Spout, Pipe laying and alignment of MS Pipe 406. 4mm, Refractory works in BAH, Providing shuttering to carry out the refractory work, Fabrication and Erection of Anchor of BAH, Scaffolding work in Bottom ash hopper, Isolation of Bottom ash hopper, Hiring of 01 no. JCB or Compact Loader Bobcat, Manpower assistance for OH or servicing of Drier in SONBHADRA, UTTAR PRADESH. Quantity: 33143. Submission Deadline: 12-08-2026 12: 00: 00. Download documents and apply online.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Round the clock operation and preventive maintenance work , Dismantling and shifting of ASP , Shifting of overhauled or New ASP , OH of ASP , Dismantling and shifting of Coarse Ash Pump , Shifting of overhauled or New Coarse Ash Pump , OH of Coarse Ash Pump , Dismantling and Shifting of VP , Shifting of Overhauled or New VP , Manpower assistance for OH of VP , Manpower assistance for servicing of IAC , Manpower assistance for servicing of TAC , OH of ESP Blower , OH of IM and Terminal Silo Blower , OH of IM and Terminal Silo vent air fan , OH or Servicing of HMDC , OH or Servicing of rotary feeder , Dismantling and shifting of BALP or FWP or FAHP or BAHP or Eco Pump or HCSD Pump , Shifting of overhauled or new BALP or FWP or FAHP or BAHP or Eco Pump or HCSD Pump , OH of FWP , OH of BALP Pump , OH of FAHP Pump , OH of BAHP Pump , OH of Economizer Pump , OH of HMDC Pump , OH of HP SWP , OH of LP SWP , OH of BAOFP , OH of RWP , OH of AHP Clarifier Sludge Pump , OH of Dosing Pump , OH of AWRP , OH of RPSWP , OH of Drain Pump , OH of BAHA Jet type Drain Pump , Manpower assistance for FC of ASP , Manpower assistance for FC of Coarse Ash Pump , OH of GB of ASP , OH of GB of Coarse Ash Pump , OH of LOP of FC of ASP , Servicing of OC of FC of ASP , Servicing of TDS of Clarifier , Alignment of ASP , Rotation of AS Disposal line , Rotation of BA discharge pipe line , Replacement of MS pipe line Dia 250 NB to 350 NB , Replacement of CI pipe line Dia 200 NB to 250 NB , Ash disposal by dumper or trolley to outside Power house , Servicing of Dewatering Pump , Servicing of Submersible Pump , Removal of wornout or damage valves , Inatallation of new or repaired valves , Replacement of Spout , Pipe laying and alignment of MS Pipe 406.4mm , Refractory works in BAH , Providing shuttering to carry out the refractory work , Fabrication and Erection of Anchor of BAH , Scaffolding work in Bottom ash hopper , Isolation of Bottom ash hopper , Hiring of 01 no. JCB or Compact Loader Bobcat , Manpower assistance for OH or servicing of Drier

Advisory Bank

State Bank of India

Delivery Details

Max Delivery Days

730

Delivery Locations

1

Delivery Cities

Sonbhadra

Delivery Pincodes

231219

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Arun Kumar Chaurasia231219,Obra Thermal Power PlantSonbhadraUttar Pradesh2312192193730-

Authority Records

ENERGY DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9572225.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 61 Items Sign in for GEM prices

#1

Round the clock operation and preventive maintenance work

Round the Clock Operation Routine and Preventive mechanical maintenance and housekeeping and cleaning works of Complete Ash Handling Plant of 2X660MW CTPS Obra, Sonebhadra.

2,193 job Delivery: 731 days
#2

Dismantling and shifting of ASP

Dismantling and shifting of Ash Slurry Pump from its foundation to maintenance bay

18 ea Delivery: 731 days
#3

Shifting of overhauled or New ASP

Shifting of Overhauled New Ash Slurry Pump from maintenance bay to the foundation of Pump

18 ea Delivery: 731 days
#4

OH of ASP

Complete overhauling of Ms Indure make Ash Slurry Pumps

18 ea Delivery: 731 days
#5

Dismantling and shifting of Coarse Ash Pump

Dismantling and shifting of Coarse Ash Pump from its foundation to maintenance bay

6 ea Delivery: 731 days
#6

Shifting of overhauled or New Coarse Ash Pump

Shifting of Overhauled New Coarse Ash Pump from maintenance bay to the foundation of Pump

6 ea Delivery: 731 days
#7

OH of Coarse Ash Pump

Complete overhauling of Ms Indure make Coarse Ash Pump

6 ea Delivery: 731 days
#8

Dismantling and Shifting of VP

Dismantling and Shifting of Vacuum Pumps from its foundation to maintenance bay

36 ea Delivery: 731 days
#9

Shifting of Overhauled or New VP

Shifting of Overhauled New Vacuum Pumps from maintenance bay to the foundation of the pump

36 ea Delivery: 731 days
#10

Manpower assistance for OH of VP

Providing manpower assistance for Overhauling of Vacuum Pumps in presence of OEM TA Make vacuunair aeromatic Capacity 3871 cubic meter per hour

36 ea Delivery: 731 days
#11

Manpower assistance for servicing of IAC

Providing manpower assistance for servicing of Instrument Air Compressor with drier in presence of OEM TA Make Atlas Copco Capacity 1300 cubic meter per hour

10 ea Delivery: 731 days
#12

Manpower assistance for servicing of TAC

Providing manpower assistance for servicing of Transport Air Compressor in presence of OEM TA Make Atlas Copco Capacity 8250 or 7500 cubic meter per hour

32 ea Delivery: 731 days
#13

OH of ESP Blower

Complete overhauling of ESP fluidizing air blower Make Model RH 120AC Capacity 660 cubic meter per hour

8 ea Delivery: 731 days
#14

OH of IM and Terminal Silo Blower

Complete overhauling of IM and Terminal Silo Aeration Blower fluidizing air blower Make Model RHH 20WC Capacity 1400 cubic meter per hour

22 ea Delivery: 731 days
#15

OH of IM and Terminal Silo vent air fan

Complete overhauling of IM and Terminal Silo vent air fan Type centrifugal Make Ms Maxim air

16 ea Delivery: 731 days
#16

OH or Servicing of HMDC

Complete overhauling or Servicing of HMDC installed at IM and Terminal silo

12 ea Delivery: 731 days
#17

OH or Servicing of rotary feeder

Complete overhauling or Servicing of rotary feeder installed in IM and Terminal silo tank

32 ea Delivery: 731 days
#18

Dismantling and shifting of BALP or FWP or FAHP or BAHP or Eco Pump or HCSD Pump

Dismantling and Shifting of BALP or FWP or FAHP or BAHP or Eco. Pump or HCSD Pump from its foundation to maintenance bay

32 ea Delivery: 731 days
#19

Shifting of overhauled or new BALP or FWP or FAHP or BAHP or Eco Pump or HCSD Pump

Shifting of overhauled or new BALP or FWP or FAHP or BAHP or Eco. Pump or HMDC Pump from maintenance bay to the foundation of the pump

32 ea Delivery: 731 days
#20

OH of FWP

Overhauling of Flushing Water Pump FWP

2 ea Delivery: 731 days
#21

OH of BALP Pump

Overhauling of Bottom Ash Low Pressure Pump BALP

6 ea Delivery: 731 days
#22

OH of FAHP Pump

Overhauling of Fly Ash High Pressure Pump FAHP

6 ea Delivery: 731 days
#23

OH of BAHP Pump

Overhauling of Bottom Ash High Pressure Pump BAHP

6 ea Delivery: 731 days
#24

OH of Economizer Pump

Overhauling of Economizer Pump

6 ea Delivery: 731 days
#25

OH of HMDC Pump

Overhauling of Hydro Mix Dust Conditioner Pump HMDC for IM and Terminal Silo

12 ea Delivery: 731 days
#26

OH of HP SWP

Overhauling of HP Seal Water Pump

8 ea Delivery: 731 days
#27

OH of LP SWP

Overhauling of LP Seal Water Pump

8 ea Delivery: 731 days
#28

OH of BAOFP

Overhauling of Bottom Ash Overflow Pump BAOFP

4 ea Delivery: 731 days
#29

OH of RWP

Overhauling of Recycle Water Pump RWP

6 ea Delivery: 731 days
#30

OH of AHP Clarifier Sludge Pump

Overhauling of AHP Clarifier Sludge Pump

8 ea Delivery: 731 days
#31

OH of Dosing Pump

Overhauling of Alum Lime and Poly Electrolyte Dosing Pump

16 ea Delivery: 731 days
#32

OH of AWRP

Overhauling of Ash Water Recovery Pump

6 ea Delivery: 731 days
#33

OH of RPSWP

Overhauling of Recovery Pump Seal Water Pump

6 ea Delivery: 731 days
#34

OH of Drain Pump

Overhauling of Drain Pumps installed at BA Hopper area Ash Slurry pump house Vacuum pump area Silo area and Recovery clarifier area.

28 ea Delivery: 731 days
#35

OH of BAHA Jet type Drain Pump

Overhauling of Bottom Ash Hopper Area Jet type Drain Pump

12 ea Delivery: 731 days
#36

Manpower assistance for FC of ASP

Providing manpower assistance for Overhauling of Fluidomat Make Fluid Coupling model SC 10 300kw or 1480 rpm motor of Ash Slurry Pump in presence of OEM TA

12 ea Delivery: 731 days
#37

Manpower assistance for FC of Coarse Ash Pump

Providing manpower assistance for Overhauling of Fluidomat Make model SC 8 50kw or 1480 rpm motor speed variation +20 to -20 percentage Fluid Coupling of Course Ash Pump and Clinker Grinder drive assembly in presence of OEM TA

24 ea Delivery: 731 days
#38

OH of GB of ASP

Overhauling of New Allen berry works Make Gear Box of Ash Slurry Pump MODEL CSA250 260KW or 1150 RPM

12 ea Delivery: 731 days
#39

OH of GB of Coarse Ash Pump

Overhauling of New Allen berry works Make Gear Box of Coarse Ash Pump and Clinker Grinder drive assembly model CSA125 55KW or 1500 RPM

24 ea Delivery: 731 days
#40

OH of LOP of FC of ASP

Overhauling of Lube Oil Pump of Fluid Coupling of Ash Slurry Pump

16 ea Delivery: 731 days
#41

Servicing of OC of FC of ASP

Servicing of Oil Cooler of Fluid Coupling of Ash Slurry Pump

16 ea Delivery: 731 days
#42

Servicing of TDS of Clarifier

Complete Servicing of Turbo driving system of Clarifier

4 ea Delivery: 731 days
#43

Alignment of ASP

Alignment of Ash Slurry Pump

24 ea Delivery: 731 days
#44

Rotation of AS Disposal line

Rotation of Ash Slurry disposal lines 400x 9.5mm thk NB

20,000 m Delivery: 731 days
#45

Rotation of BA discharge pipe line

Rotation of Bottom ash discharge pipe line 200 NB

3,000 m Delivery: 731 days
#46

Replacement of MS pipe line Dia 250 NB to 350 NB

Replacement of MS pipe line Dia 250 NB to 350 NB

1,500 m Delivery: 731 days
#47

Replacement of CI pipe line Dia 200 NB to 250 NB

Replacement of CI pipe line Dia.200 NB to 250 NB

600 m Delivery: 731 days
#48

Ash disposal by dumper or trolley to outside Power house

In case the huge quantity of ash accumulated at ESP or IM Silo or Terminal Silo floor the same shall be segregated and lifted by dumper or trolley to outside Powerhouse boundary for its disposal of 2x660MW CTPS. one dumper equal to two tractor trolley

2,000 ea Delivery: 731 days
#49

Servicing of Dewatering Pump

Complete servicing of dewatering pump.

4 job Delivery: 731 days
#50

Servicing of Submersible Pump

Servicing of Goodwin make submersible pump of capacity 200 cubic meter per hour Mechanical work

4 job Delivery: 731 days
#51

Removal of wornout or damage valves

Removal of worn out or damaged valves of size more than 80mm Nb from ash disposal line or seal water line or ash water line etc.

30 job Delivery: 731 days
#52

Inatallation of new or repaired valves

Installation of new or repaired valves of size more than 80mm Nb in ash disposal line or seal water line or ash water line etc.

30 job Delivery: 731 days
#53

Replacement of Spout

Replacement or repairing of spout of IM Silo or Terminal Silo

20 job Delivery: 731 days
#54

Pipe laying and alignment of MS Pipe 406.4mm

Pipe Laying and alignment of following diameter MS pipe over the RCC pedestal of height approx. varies from 300 to 1500mm which includes transportation of pipe and its accessories at erection site including cutting, grinding as well as its welding tightening of coupling clamping bolt and nuts gasket etc. including testing as per recommendation of Field Quality Plan satisfactory hydraulic testing commissioning etc. required for proper completion of work including cost of all labour material T and P etc. ERW MS pipe OD 406.4mm Near IM Silo area

2,000 m Delivery: 731 days
#55

Refractory works in BAH

Refractory works in Bottom ash hopper

20 mt Delivery: 731 days
#56

Providing shuttering to carry out the refractory work

Providing shuttering to carry out the refractory work

200 m2 Delivery: 731 days
#57

Fabrication and Erection of Anchor of BAH

Fabrication and Erection of Anchor of BAH

500 ea Delivery: 731 days
#58

Scaffolding work in Bottom ash hopper

Scaffolding work in Bottom ash hopper

1 job Delivery: 731 days
#59

Isolation of Bottom ash hopper

Isolation of Bottom ash hopper

1 job Delivery: 731 days
#60

Hiring of 01 no. JCB or Compact Loader Bobcat

Hiring of 01 no. JCB or Compact Loader Bobcat

360 hr Delivery: 731 days
#61

Manpower assistance for OH or servicing of Drier

Providing manpower assistance for Overhauling or servicing of Drier in presence of OEM TA Make Ms Mellcon Job no CSU 58 I

32 ea Delivery: 731 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

2

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer