TenderDekho Logo
Closed GEM

Contract Bidding Open For Oil filtration for 250KVA Transformer,Transformer Oil BDV Testing and Report,Supply of Transformer in EAST GODAVARI, ANDHRA PRADESH

Bid Publish Date

31-Jul-2025, 2:45 pm

Bid End Date

28-Aug-2025, 3:00 pm

Value

₹78,871

Generate Docs

Progress

Issue31-Jul-2025, 2:45 pm
Corrigendum21-Aug-2025
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

79

Category

HT Yard maintenance work - Double Pole Structure, 11 KV AB Switch, HG Fuses, Jumpers, LA Erection and Maintenance, Department Single Pole Structure Maintenance and HG Fuses Replacement.

Bid Type

Two Packet Bid

Categories 42

Software Technology Parks Of India (stpi) invites bids for Oil filtration for 250KVA Transformer, Transformer Oil BDV Testing and Report, Supply of Transformer Power Oil -Billing as per the actual usage, Supply of 3Cx35Sqmm HT Cable Kits Outdoor, HT cable Kit for End Termination, A. LAS 9KV 5KA Polymer type with lighting Insulator Suitable for 11KV system phase to earth application B. Discharge current rating 5KA. C. Mounting vertical. D. Voltage 9 KV. , Earth pits Meggering and Test Report, Painting of 11KV DP Structure -SP and DP Structure Painting with Aluminum Paint including paints, Painting of Transformer -Transformer Spray Painting with Siemens grey paint including paints, Threading Type Silica gel Breather - 250 Grams -Diameter 0. 5 inch BSP, 11KV single pole structure HG Fuses set, 11KV AB Switch Male and Female Connector, 11KV DP structure HG Fuses Arms Set, Transformer Pad Clamps, HT Yard maintenance work - Double Pole Structure, 11 KV AB Switch, HG Fuses, Jumpers, LA Erection and Maintenance, Department Single Pole Structure Maintenance and HG Fuses Replacement. in EAST GODAVARI, ANDHRA PRADESH. Quantity: 79. Submission Deadline: 28-08-2025 15: 00: 00. Submit your proposal before the deadline.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Oil filtration for 250KVA Transformer , Transformer Oil BDV Testing and Report , Supply of Transformer Power Oil -Billing as per the actual usage , Supply of 3Cx35Sqmm HT Cable Kits Outdoor , HT cable Kit for End Termination , A. LAS 9KV 5KA Polymer type with lighting Insulator Suitable for 11KV system phase to earth application B. Discharge current rating 5KA. C. Mounting vertical. D. Voltage 9 KV. , Earth pits Meggering and Test Report , Painting of 11KV DP Structure -SP and DP Structure Painting with Aluminum Paint including paints , Painting of Transformer -Transformer Spray Painting with Siemens grey paint including paints , Threading Type Silica gel Breather - 250 Grams -Diameter 0.5 inch BSP , 11KV single pole structure HG Fuses set , 11KV AB Switch Male and Female Connector , 11KV DP structure HG Fuses Arms Set , Transformer Pad Clamps , HT Yard maintenance work - Double Pole Structure, 11 KV AB Switch, HG Fuses, Jumpers, LA Erection and Maintenance, Department Single Pole Structure Maintenance and HG Fuses Replacement.

Authority Records

MINISTRY OF ELECTRONICS AND INFORMATION TECHNOLOGYELECTRONICS AND INFORMATION TECHNOLOGY DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-8148412.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 15 Items Sign in for GEM prices

#1

Oil filtration for 250KVA Transformer

Refer Specification Document Sl.No.1

1 job Delivery: 30 days
#2

Transformer Oil BDV Testing and Report

Refer Specification Document Sl.No.2

1 number Delivery: 30 days
#3

Supply of Transformer Power Oil -Billing as per the actual usage

Refer Specification Document Sl.No.3

50 litres Delivery: 30 days
#4

Supply of 3Cx35Sqmm HT Cable Kits Outdoor

Refer Specification Document Sl.No.4

1 number Delivery: 30 days
#5

HT cable Kit for End Termination

Refer Specification Document Sl.No.5

1 number Delivery: 30 days
#6

A. LAS 9KV 5KA Polymer type with lighting Insulator Suitable for 11KV system phase to earth application B. Discharge current rating 5KA. C. Mounting vertical. D. Voltage 9 KV.

Refer Specification Document Sl.No.6

3 number Delivery: 30 days
#7

Earth pits Meggering and Test Report

Refer Specification Document Sl.No.7

10 number Delivery: 30 days
#8

Painting of 11KV DP Structure -SP and DP Structure Painting with Aluminum Paint including paints

Refer Specification Document Sl.No.8

1 job Delivery: 30 days
#9

Painting of Transformer -Transformer Spray Painting with Siemens grey paint including paints

Refer Specification Document Sl.No.9

1 job Delivery: 30 days
#10

Threading Type Silica gel Breather - 250 Grams -Diameter 0.5 inch BSP

Refer Specification Document Sl.No.10

1 number Delivery: 30 days
#11

11KV single pole structure HG Fuses set

Refer Specification Document Sl.No.11

2 number Delivery: 30 days
#12

11KV AB Switch Male and Female Connector

Refer Specification Document Sl.No.12

2 number Delivery: 30 days
#13

11KV DP structure HG Fuses Arms Set

Refer Specification Document Sl.No.13

1 number Delivery: 30 days
#14

Transformer Pad Clamps

Refer Specification Document Sl.No.14

3 number Delivery: 30 days
#15

HT Yard maintenance work - Double Pole Structure, 11 KV AB Switch, HG Fuses, Jumpers, LA Erection and Maintenance, Department Single Pole Structure Maintenance and HG Fuses Replacement.

Refer Specification Document Sl.No.15

1 job Delivery: 30 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Certificate (Requested in ATC)

3

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

4

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Corrigendum Updates

1 Update
#1

Update

21-Aug-2025

Extended Deadline

28-Aug-2025, 3:00 pm

Opening Date

28-Aug-2025, 3:30 pm