TenderDekho Logo
Active GEM

Power Development Department Jammu & Kashmir Copper Wire & Aluminum Components Tender 2026 ISO 9001 Material Test Certificate 50000 EMD

Bid Publish Date

17-Aug-2026, 3:42 pm

Bid End Date

01-Sep-2026, 5:00 pm

EMD

₹50,000

Progress

Issue17-Aug-2026, 3:42 pm
AwardPending

Tender Overview

The Power Development Department, Jammu and Kashmir invites bids for multiple electrical hardware items including DPC copper wire in exchange for one kg scrap, DPC aluminum strip press, 200 A changeover, fresh aluminum windings, 19 mm and 25 mm bush rod copper, solderless clamps, and HT/LT copper bush rods. The tender lists a single EMD amount of ₹50,000, with an unclear estimated value and unspecified start/end dates. The BoQ contains 8 items, though detailed quantities and units are not provided. A key differentiator is the option clause allowing a ±25% quantity variation during contract execution at contracted rates, with delivery extensions calculated by a defined formula. The procurement context appears to be power infrastructure-related hardware supply for ongoing distribution or transmission needs. Unique aspects include a requirement for material test certificates and ISO 9001 certification for either bidder or OEM. This tender targets suppliers capable of delivering copper and aluminum components with traceable quality and post-sale support within India.

Technical Specifications & Requirements

  • Product categories: copper wire (exchange for scrap), aluminum strips, copper bush rods (19 mm, 25 mm), copper HT/LT bush rods, solderless clamps, 200 A changeover, aluminum windings.
  • EMD: ₹50,000.
  • Quality standards: ISO 9001 certification (bidder or OEM).
  • Documentation: Material Test Certificate to be submitted with supply; buyer lab will verify and acceptance hinges on lab results.
  • OEM/Support: For imported products, OEM or authorized seller must have registered Indian office for after-sales service.
  • Delivery flexibility: Option to increase/decrease quantity by up to 25%; extended delivery time calculated as (additional quantity/ original quantity) × original delivery period, min 30 days.
  • ATC: Compliance with attached Additional Terms and Conditions.

Terms, Conditions & Eligibility

  • EMD: ₹50,000.
  • Delivery terms: Expanded quantity allowed; delivery timeline from last date of original delivery order; extended periods apply per option clause.
  • Certifications: ISO 9001 required; material test certificate mandatory.
  • OEM/Support: For imported items, must have registered Indian office for after-sales service.
  • Submission: All certificates/documents sought in Bid document/ATC must be uploaded; non-compliance may lead to rejection.
  • BoQ: 8 items in total; precise quantities/units not disclosed in data provided.

Key Specifications

  • Copper wire in exchange for one kg scrap

  • DPC aluminum strip press

  • Change over 200 amp

  • DPC aluminum winding fresh

  • Bush rod copper 19 mm

  • Solderless clamp

  • Bush rod copper 25 mm

  • HT LT bush rod copper 12 mm

  • Material Test Certificate mandatory

  • ISO 9001 certification required

  • OEM/Authorized Seller with Indian registered office for imported items

  • 25% quantity variation rights

Terms & Conditions

  • EMD fixed at ₹50,000 with eligible payment methods

  • Delivery period adjustable up to +25% quantity under option clause

  • ISO 9001 certification required for bidder or OEM; MT certificate mandatory

  • Material Test Certificate to be verified by Buyer’s laboratory

  • Imported items require Indian after-sales service registration

Important Clauses

Payment Terms

No specific payment terms listed; standard practice implies milestone or post-delivery payment per contract, subject to verification of MT certificate and ISO compliance.

Delivery Schedule

Delivery begins from the last date of original delivery order; extended time computed by (additional quantity/original quantity) × original delivery period, minimum 30 days; maximum extension may occur with option clause.

Penalties/Liquidated Damages

No explicit LD details provided; likely governed by ATC; bidders should review ATC for LD or penalty terms.

Bidder Eligibility

  • Must hold valid ISO 9001 certification (bidder or OEM)

  • Material Test Certificate must accompany supply

  • OEM authorization required for imported items with India-based after-sales support

  • Compliance with Additional Terms and Conditions hosted with ATC

Tender Data

Bid Details

Quantity

1502

Category

DPC Aluminum Strip Press

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

No

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Past Performance

30 %

Experience Required

2 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

DPC Copper wire in exchange of one kg Scrap , DPC Aluminum Strip Press , Change over two hundred amp , DPC Aluminum winding fresh , Bush Rod copper nineteen mm , Solderless Clamp , Bush rod copper twenty five mm , HT LT bush rod copper Twelve mm

Advisory Bank

State Bank of India

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

20

Delivery Locations

1

Delivery Cities

Srinagar

Delivery Pincodes

190001

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Faisal Bashir190001,Electric Division 1st Basant Bagh SrinagarSrinagarJammu And Kashmir19000150020-

Authority Records

POWER DEVELOPMENT DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9737389.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

N/a

Office Name

Electric Division Ist Basant Bagh Srinagar

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 8 Items Sign in for GEM prices

#1

DPC Copper wire in exchange of one kg Scrap

As Per Bid

500 kg Delivery: 20 days
#2

DPC Aluminum Strip Press

As Per Bid

300 kg Delivery: 20 days
#3

Change over two hundred amp

As Per Bid

2 nos Delivery: 20 days
#4

DPC Aluminum winding fresh

As Per Bid

200 kg Delivery: 20 days
#5

Bush Rod copper nineteen mm

As Per Bid

70 nos Delivery: 20 days
#6

Solderless Clamp

As Per Bid

300 nos Delivery: 20 days
#7

Bush rod copper twenty five mm

As Per Bid

30 nos Delivery: 20 days
#8

HT LT bush rod copper Twelve mm

As Per Bid

100 nos Delivery: 20 days

Categories 15

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar supply

4

Financial statements/balance sheets

5

EMD payment receipt or proof

6

Material Test Certificates

7

ISO 9001 certificate (bidder or OEM)

8

OEM authorization if applicable

9

Bid document, ATC adherence proof

10

Any other certificates requested in ATC

Frequently Asked Questions

Key insights about JAMMU AND KASHMIR tender market

What documents are required for the Jammu & Kashmir copper wire tender in 2026?

Bidders must submit GST registration, PAN, experience certificates, financial statements, EMD receipt, Material Test Certificates, ISO 9001 certificate (bidder or OEM), OEM authorization for imported items, and bid document compliance proofs per ATC.

How is the 25% quantity option calculated in this JK tender?

The buyer may increase or decrease quantity by up to 25% at contract placement and during currency. Extended delivery time uses (additional quantity/original quantity) × original delivery period, with a minimum of 30 days.

What is the EMD amount and how is it paid for this procurement?

The EMD is ₹50,000. Payment method typically includes online transfer or bank demand draft as per tender rules; ensure EMD submission with bid to avoid rejection.

Are ISO 9001 certifications mandatory for participation in this tender?

Yes. The bidder or the OEM must hold ISO 9001 certification to qualify; non-compliance may lead to bid rejection, per certificate requirements in ATC.

What is required for imported items under OEM terms in this tender?

Imported items require an OEM or authorized seller with a registered Indian office to provide after-sales service; submit OEM authorization and Indian service registration as part of bid.

What are the key technical categories included in the BoQ for this tender?

Categories include DPC copper wire (scrap exchange), DPC aluminum strip press, 200 A changeover, aluminum windings, 19 mm and 25 mm copper bush rods, solderless clamps, and 12 mm HT/LT copper bush rods.

What happens if the original delivery period is less than 30 days?

If original delivery is under 30 days, the extended time equals the original delivery period; the option clause may allow further extension up to the original delivery period under specified terms.

How does the Material Test Certificate affect acceptance of delivered items?

Materials must pass the Buyer’s lab tests; the lab results determine acceptance. Ensure MT certificates accompany each supply batch to avoid rejection.