The procuring organization is Bharat Heavy Electricals Limited (BHEL), inviting a bid for the Supply of Flange Insulating Gasket Kit in Visakhapatnam, Andhra Pradesh. Estimated value and exact quantity are not disclosed. The contract covers procurement of gasket kits as a discrete supply, with a scope limited to supply of goods. A key differentiator is the option clause enabling ±25% quantity variation at contracted rates, influencing pricing strategy and inventory planning for bidders. The tender emphasizes design approval and drawing modifications before fabrication, and requires bidders to align with buyer-approved drawings. Unique aspects include the detailed design drawing approval workflow and the risk-adjusted delivery timeline tied to drawing clearance.
No technical specifications are provided in the tender data. However, the following actionable context can be inferred for bidders:
Product: Flange Insulating Gasket Kit
Delivery scope: Supply of Goods (no services included)
Mid-process approvals: Detailed Design Drawings approval required
Variation clause: ±25% quantity at contracted rates
Timeline trigger: Delivery period adjusts with drawing approval; minimum 30 days extension logic
Tax handling: GST invoicing and portal payment as per actuals or applicable rate
Option clause allows ±25% quantity variation at contract rates
5-day window to submit Detailed Design Drawings post-award
7-day reply window from buyer for drawing modifications
Non-obsolescence requirement of 2 years residual life
GST compliance and invoice submission on GE M portal
GST invoicing via GE M portal with GST payment screenshot; reimbursement as actuals or applicable rate, whichever is lower, up to quoted GST percentage
Delivery period derived from original or extended delivery date; minimum extension as 30 days; additional time proportional to quantity variation
LD details not specified; delays attributed to drawing approval can extend delivery without LD
Not under liquidation, court receivership, or similar proceedings
Offer items with at least 2 years residual market life; not end-of-life by OEM before this period
GST registered bidder with PAN and GSTIN; ability to submit EFT mandate
Main Document
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
Copy of PAN Card
Copy of GSTIN
Copy of Cancelled Cheque
Copy of EFT Mandate duly certified by Bank
GST invoice and GST portal payment screenshot during invoicing
Detailed Design Drawings within 5 days of award
Undertaking against liquidation or bankruptcy
Proof of compliance with non-obsolescence (2 years residual market life)
Key insights about ANDHRA PRADESH tender market
Bidders must submit PAN, GSTIN, Cancelled Cheque, EFT Mandate, and GST invoice with GST portal confirmation. Include Detailed Design Drawings within 5 days of award, respond to modification list within 7 days, and ensure product has at least 2 years residual market life as per OEM.
Required documents include PAN, GSTIN, Cancelled Cheque, EFT Mandate, and GST invoice with GST portal confirmation. Also provide undertaking of financial stability and evidence of non-obsolescence for at least 2 years, plus detailed design drawings within 5 days of award.
The purchaser may increase or decrease quantity by up to ±25% of bid quantity at the contracted rates; additional time is calculated as (increased quantity ÷ original quantity) × original delivery period with a minimum of 30 days.
Submit Detailed Design Drawings within 5 days of award; buyer responds with approval or modification list within 7 days; supply must align to approved drawings, with potential modifications before fabrication.
GST will be reimbursed based on actuals or applicable rate, whichever is lower, up to the quoted GST percentage; bidder must upload GST invoice and GST portal payment screenshot during invoicing.
Bidders must ensure the offered gasket kit has at least 2 years residual market life and shall not be declared end-of-life by the OEM before this period.
Delivery period commences from the last date of the original delivery order; if drawing approval extends, the delivery time adjusts accordingly with a minimum 30 days extension.
Scope is limited to supply of goods; all costs must be included in the bid price; no installation or after-sales services are explicit in the tender terms.