Bid Publish Date
07-Nov-2024, 2:03 pm
Bid End Date
27-Nov-2024, 5:00 pm
Value
₹3,53,291
Progress
Artificial Limbs Manufacturing Corporation Of India (alimco) has released a public tender for Temperature controlled soldering station (Q3). Quantity: 10. Submission Deadline: 27-11-2024 17: 00: 00. Download documents and apply online.
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | ADVANCE TECH SERVICES PRIVATE LIMITED Under PMA | Make : TOKii Model : TOKii-DSS75 with bit | 27-11-2024 10:40:28 | |
| 2 | BRIGHT TECHNOLOGIES Under PMA | Make : HEATEX Model : Heatex-HT120D | 25-11-2024 15:52:43 | |
| 3 | SIGMA TECHNIX Under PMA | Make : HAKKO Model : FX-951 | 18-11-2024 18:02:06 | |
| 4 | Zenith Enterprises Under PMA | Make : HAKKO Model : FX-951 | 26-11-2024 22:29:35 |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | ADVANCE TECH SERVICES PRIVATE LIMITED Under PMA | Item Categories : Temperature controlled soldering station | |
| L2 | BRIGHT TECHNOLOGIES (MII) Under PMA | Item Categories : Temperature controlled soldering station |
Quantity
10
Bid Type
Two Packet Bid
Bid Validity
120 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
5 Days
Startup Exemption (Experience)
Yes
Min. Avg. Annual Turnover
2
Past Performance
80 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Temperature controlled soldering station (Q3)
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
GEM_CATEGORY_SPECIFICATION
GEM_GENERAL_TERMS_AND_CONDITIONS
Experience Criteria
Past Performance
Bidder Turnover
OEM Authorization Certificate *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
The eligibility requirements include being a registered entity, with a minimum average annual turnover of INR 2 Lakhs and a minimum of 3 years of past experience in supplying similar equipment. Additionally, bidders need to have an OEM authorization certificate to prove their reliability in providing the required Temperature Controlled Soldering Stations.
Yes, bidders must provide several certificates including the OEM authorization certificate, a statement of past performance, and proof of financial stability to meet the turnover requirements outlined in the tender documentation.
Bidders must ensure they are registered on the Government e-Marketplace (GeM) platform, and all necessary documents need to be uploaded as specified in the tender requirements. Follow the instructions provided in the main document for a seamless registration process.
Typically, the accepted document formats include PDFs for official certificates and financial statements. However, specific details regarding formats can be found in the tender documentation.
The technical specifications mandate certain performance criteria, including the operational temperature range, power specifications, and durability standards. Bidders must demonstrate compliance with these specifications in their proposals.
Participating bidders must ensure that their offerings adhere to industry-standard quality benchmarks and certifications relevant to Temperature Controlled Soldering Stations. Quality control measures should also be detailed in the proposal.
Bidders must comply with all legal stipulations, including quality standards and safety regulations set forth by the relevant authority. This includes providing documented evidence of compliance in the technical proposal.
The testing criteria will likely involve assessing the soldering stations on performance benchmarks such as precision, temperature control accuracy, and overall build quality as defined in the tender documents.
The tender document may specify an Earnest Money Deposit (EMD) that bidders are required to submit to participate. This amount is typically refundable upon contract award and is meant to ensure the seriousness of the proposal.
Winning bidders may be required to furnish a performance security amount, which acts as a guarantee for the execution of the contract. Specific details can be found in the tender documentation.
Payment terms usually outline how and when payments will be made post-delivery. It is essential for bidders to carefully review these terms to ensure they align with their financial planning.
The price evaluation will consider the total bid amount along with the conformity to the technical specifications provided. Each proposal will be assessed fairly to ensure competitiveness while maintaining quality.
Bids should be submitted electronically via the GeM portal, adhering to the specified formats. Guidelines found in the main document will offer details on acceptable submission methods.
While the precise timelines and deadlines can vary, typically they include submission deadlines and bid opening dates. It is vital for bidders to reference the official tender documents for the most accurate timeline information.
The evaluation process will consist of validating both technical and financial aspects before final selection. The evaluation and selection process is outlined within the tender documents to ensure transparency.
Bidders will be informed of the results through official notifications on the GeM portal once the evaluation is complete. Communications regarding selections will also be shared as per registered contacts.
MSEs may benefit from relaxed eligibility criteria such as exemptions from experience and turnover requirements. Interested parties should refer to the tender documentation for further guidance.
Yes, startups are encouraged to participate with potential exemptions available on the basis of past experience criteria. Startups must submit appropriate documents to leverage these benefits.
The tender encourages compliance with ‘Make in India’ policies, promoting local manufacturing. Bidders should discuss how their products align with this initiative in their proposals.
Bidders are expected to adhere to local content requirements as stated in the tender documentation. Specific local procurement rules may apply depending on the goods offered.