Bid Publish Date
10-Jun-2026, 10:58 am
Bid End Date
20-Jun-2026, 11:00 am
Location
Progress
RAQuantity
29
Category
Z1_4579-160-757-42_SENSOR QRB 1113
Bid Type
Two Packet Bid
The tender is issued by the Indian Army under the Department Of Military Affairs for multiple bare-metal components, including items described as Z1_4579-160-757-42_SENSOR QRB 1113, Z1_3020-004210_GEAR BELT, Z1_4333-000-201_AC-DC CONVERTER, Z1_4409-101-501-05_HMC THK FLTR B PASS BMC 1527, and Z1_4600-129-3001-67_CONNECTOR RF RT 50. Five total items are listed in the BOQ, but explicit quantities and unit measures are not provided. The procurement scope includes sample submission for compatibility testing and adherence to stated standards. The buyer reserves a right to adjust quantities by up to 50% during contract performance, with delivery timelines anchored to the original delivery period and extended periods as per option. The TEC stage requires a sample delivered to TEC testing site by 20 Jun 2026.
Option clause allows ±50% quantity variation during and after contract
Mandatory TEC sample submission by 20 Jun 2026 to 9 Corps Zone Workshop
Upload all mandatory certificates and documents; non-compliance leads to rejection
Not explicitly stated; assume standard government terms; ensure clarity on advance, milestones, and final payment in ATC
Delivery spans original delivery period with possibility of extension via option clause; additional time calculated as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days
Not specified in available data; ensure bidder notes ATC for any LD provisions if applicable
Proven experience in supplying aerospace/defense-grade components or equivalent
GST registration and PAN verification
Capability to meet TEC sample testing requirements at 9 Corps Zone Workshop
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Z1_4579-160-757-42_SENSOR QRB 1113 , Z1_3020- 004210_GEAR BELT , Z1_4333-000-201_AC-DC CONVERTER , Z1_4409-101-501-05_HMC THK FLTR B PASS BMC 1527 , Z1_4600-129-3001-67_CONNECTOR RF RT 50
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Z1_4579-160-757-42_SENSOR QRB 1113
SENSOR QRB 1113
Z1_3020-004210_GEAR BELT
GEAR BELT
Z1_4333-000-201_AC-DC CONVERTER
AC-DC CONVERTER
Z1_4409-101-501-05_HMC THK FLTR B PASS BMC 1527
HMC THK FLTR B PASS BMC 1527
Z1_4600-129-3001-67_CONNECTOR RF RT 50
CONNECTOR RF RT 50
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Z1_4579-160-757-42_SENSOR QRB 1113 | SENSOR QRB 1113 | 20 | nos | tsg39120 | 15 | |
| 2 | Z1_3020-004210_GEAR BELT | GEAR BELT | 2 | nos | tsg39120 | 15 | |
| 3 | Z1_4333-000-201_AC-DC CONVERTER | AC-DC CONVERTER | 2 | nos | tsg39120 | 15 | |
| 4 | Z1_4409-101-501-05_HMC THK FLTR B PASS BMC 1527 | HMC THK FLTR B PASS BMC 1527 | 1 | nos | tsg39120 | 15 | |
| 5 | Z1_4600-129-3001-67_CONNECTOR RF RT 50 | CONNECTOR RF RT 50 | 4 | nos | tsg39120 | 15 |
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar components
Financial statements or turnover evidence
EMD submission document (if required by ATC)
Technical bid documents and specifications
OEM authorizations (where applicable)
Certificates of conformity/quality (IS/IEC as applicable)
Start
24-Jun-2026, 9:00 pm
End
25-Jun-2026, 9:00 pm
Duration: 24 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | GR ENTERPRISES Under PMA | - | 15-06-2026 21:08:52 | |
| 2 | hrsales&services Under PMA | - | 16-06-2026 08:48:59 | |
| 3 | JINDAL INDUSTRIAL CORP Under PMA | - | 12-06-2026 21:14:47 | |
| 4 | KAVISH ENTERPRISES Under PMA | - | 15-06-2026 14:02:48 | |
| 5 | Laxmi Technologies Under PMA | - | 17-06-2026 18:43:35 | |
| 6 | M/S AGARWAL ENTERPRISES Under PMA | - | 19-06-2026 18:59:45 | |
| 7 | TANU TRADERS Under PMA | - | 16-06-2026 13:03:16 |
These are the final prices after the reverse auction event. Prices may be lower than initial bids.
| Rank | Seller | Final Price | Item |
|---|---|---|---|
| L1 | JINDAL INDUSTRIAL CORP(MSE,MII) Under PMA Winner | ₹28,084 | Item Categories : Z1_4579-160-757-42_SENSOR QRB 1113,Z1_3020-004210_GEAR BELT,Z1_4333-000-201_AC-DC CONVERTER,Z1_4409 |
| L2 | TANU TRADERS (MSE,MII) Under PMA | ₹40,974 | Item Categories : Z1_4579-160-757-42_SENSOR QRB 1113,Z1_3020-004210_GEAR BELT,Z1_4333-000-201_AC-DC CONVERTER,Z1_4409 |
| L3 | hrsales&services (MSE,MII) Under PMA | ₹41,680 | Item Categories : Z1_4579-160-757-42_SENSOR QRB 1113,Z1_3020-004210_GEAR BELT,Z1_4333-000-201_AC-DC CONVERTER,Z1_4409 |
| L4 | GR ENTERPRISES (MSE,MII) Under PMA | ₹43,950 | Item Categories : Z1_4579-160-757-42_SENSOR QRB 1113,Z1_3020-004210_GEAR BELT,Z1_4333-000-201_AC-DC CONVERTER,Z1_4409 |
🎉 L1 Winner
JINDAL INDUSTRIAL CORP(MSE,MII) Under PMA
Final Price: ₹28,084
Key insights about HIMACHAL PRADESH tender market
Bidders must meet eligibility criteria, submit GST, PAN, experience certificates, financials, EMD as applicable, and technical bid documents. Ensure TEC sample is prepared and delivered to 9 Corps Zone Workshop, Himachal Pradesh by 20 Jun 2026. Include OEM authorizations if required and upload all client-specified certificates.
Required documents include GST registration, PAN, experience certificates for similar items, financial statements, EMD documents, technical compliance certificates, OEM authorizations, and any certificates requested in the ATC/Corrigendum. Ensure proper upload during bid submission.
No explicit numerical specs are provided; bidders must ensure samples meet the buyer’s stated quality during TEC testing. Present product names: SENSOR QRB 1113, GEAR BELT, AC-DC CONVERTER, HMC THK FILTER B PASS BMC 1527, RF CONNECTOR 50. Validation occurs at TEC stage.
The TEC sample deadline is 20 Jun 2026. Samples must be delivered to TEC testing site at 9 Corps Zone Workshop, c/o 56 APO, Damtal, Himachal Pradesh, accompanied by complete technical specifications and required documents.
The purchaser may increase/decrease order quantity by up to 50% during contract and extend delivery time accordingly. Additional time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum 30 days.
Upload all certificates sought in the Bid Document, ATC and Corrigendum. While specific standards aren’t listed, compliance with quality and compatibility requirements during TEC is mandatory, and non-compliance may lead to bid rejection.
There are five BOQ items, but explicit quantities are Not Specified (N/A) in the available data. Bidders should seek clarification on Item-wise quantities and unit measures during bid clarification or ATC amendments.
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS