UPPCL Jhansi Supply Installation Testing and Commissioning Tender 2026 - ISD-ISI Standards, 3-Year Turnover ₹5 Crore, 25% Quantity Variation

Bid Publish Date

05-Mar-2026, 1:39 pm

Bid End Date

26-Mar-2026, 2:00 pm

EMD

₹1,80,000

Value

₹1,80,00,000

Generate Docs

Progress

Issue05-Mar-2026, 1:39 pm
Corrigendum23-Mar-2026
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

55145

Category

Laying and Dressing of 3x300 sqmm XLPE cable by digging method the cable shall with duly protected by brick, sand and stone slab and refiling, raiming of the left oil soil as per drawing.

Bid Type

Two Packet Bid

Categories 76

Tender Overview

Uttar Pradesh Power Corporation Limited (UPPCL) invites bids for the Supply Installation Testing and Commissioning of Goods to be executed at Jhansi, Uttar Pradesh 284001. The project’s estimated value is ₹18,000,000 with an EMD of ₹180,000. The contract allows a quantity variation up to 25%, which may be exercised during the contract period at contracted rates. Scope includes all cost components for delivery, installation, testing, and commissioning, with execution aligned to the last date of the original delivery order for final delivery. The tender references a 71-item BOQ, though item specifics are not disclosed in the data provided.

The bidder must demonstrate turnover adequacy, evidenced by a minimum average annual turnover (3-year) as specified in the bid document, supported by audited financial statements or CA certificates. The organization requires bidders to maintain financial stability (no liquidation or bankruptcy) and to upload a formal undertaking. The procurement is issued by the Uttar Pradesh Power Corporation Limited under Government of Uttar Pradesh energy policy.

Key differentiators include the attached option clause for quantity adjustments and the emphasis on end-to-end procurement coverage (Supply, Installation, Testing, and Commissioning). The absence of explicit technical specs signals reliance on BOQ details and mandatory ATC clauses, while the scope remains focused on a turnkey delivery model.

Technical Specifications & Requirements

  • Organization: Uttar Pradesh Power Corporation Limited (UPPCL) – Energy Department, Jhansi, UP
  • Project scope: Supply, Installation, Testing and Commissioning of Goods
  • Estimated value: ₹18,000,000; EMD: ₹180,000
  • BOQ: 71 items (detailed specs not provided in the excerpt)
  • Quantity variation: Up to 25% of bid quantity during contract and currency of contract
  • Turnover criteria: Minimum average annual turnover for last 3 years as per bid document; audited or CA-certified proof required
  • Financial health: No liquidation or bankruptcy; bidder to submit undertaking
  • Delivery timeline: Delivery period tied to original delivery order; extension rules apply per option clause
  • Warranty/AMC: Not specified in the excerpt; scope includes commissioning activities
  • ATC/Conflicts: ATC clauses prevail in any conflict; ATC document uploaded by bidder
  • Location specificity: Jhansi, Uttar Pradesh

Terms, Conditions & Eligibility

  • EMD: ₹180,000; Must be submitted as specified in the bid document
  • Turnover requirement: Average turnover for last 3 years; documentary evidence via audited statements or CA certificate
  • Financial standing: No liquidation or bankruptcy; bidder must upload undertaking
  • Delivery flexibility: Quantity may increase by up to 25%; additional delivery time governed by formula
  • Delivery start: From the last date of original delivery order; extended periods applicable as per option clause
  • Payment terms: Not detailed in the excerpt; ATC clauses prevail
  • Documentation: GST, PAN, turnover proofs, EMD submission, ATC documents
  • Jurisdiction: Jhansi, Uttar Pradesh; government procurement under GeM framework

Key Specifications

  • Supply Installation Testing and Commissioning of Goods

  • Estimated value ₹18,000,000; EMD ₹180,000

  • Turnover: minimum average annual turnover for last 3 years as per bid document

  • Quantity variation up to 25% during contract and currency of contract

  • BOQ comprises 71 items; detailed specs not provided in the data

  • ATC governs conflicts; bidder must upload ATC document

Terms & Conditions

  • EMD amount and submission format as per bid document

  • Turnover criteria: 3-year average turnover with audit/CA certificate

  • Quantity variation up to 25% with corresponding delivery adjustments

Important Clauses

Payment Terms

ATC overrides; specific payment terms not disclosed in excerpt; bidders must rely on ATC document for payment milestones and schedule

Delivery Schedule

Delivery period starts from last date of original delivery order; option clause may extend delivery time proportionally with minimum 30 days

Penalties/Liquidated Damages

Not specified in excerpt; ATC document may include LD/penalty terms; bidders should review ATC for penalties on delays

Bidder Eligibility

  • Minimum three years experience in supply, installation, testing and commissioning projects (as per turnover clause)

  • Average annual turnover meeting bid document requirement (specific ₹ value not disclosed in excerpt)

  • No active liquidation or bankruptcy; formal undertaking required

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Authority Records

ENERGY DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9063067.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 71 Items Sign in for GEM prices

#1

Supply of Holding clamp for ST Pole-Cross arm

Supply of Holding clamp for ST Pole-Cross arm

70 no Delivery: 180 days
#2

Supply of Holding clamp for ST or PCC Pole-Guarding Angle

Supply of Holding clamp for ST or PCC Pole-Guarding Angle

50 no Delivery: 180 days
#3

Supply of Armour rod with ferule

Supply of Armour rod with ferule

210 set Delivery: 180 days
#4

Supply of Stone Pad 300x300x75 mm

Supply of Stone Pad 300x300x75 mm

122 no Delivery: 180 days
#5

Supply of Earth wire clamp with Bolts and Nuts

Supply of Earth wire clamp with Bolts and Nuts

122 no Delivery: 180 days
#6

Supply of P.G. Clamps for panther

Supply of P.G. Clamps for panther

120 no Delivery: 180 days
#7

Supply of Number Plates with clamp, nuts and bolts

Supply of Number Plates with clamp, nuts and bolts

96 no Delivery: 180 days
#8

Supply of Danger Board with clamp for 33 KV

Supply of Danger Board with clamp for 33 KV

96 no Delivery: 180 days
#9

Supply of GI Barbed wire -2kg. per pole

Supply of GI Barbed wire -2kg. per pole

244 kg Delivery: 180 days
#10

Supply of Aluminium binding wire- 6 swg -0.5 kg. or pole

Supply of Aluminium binding wire- 6 swg -0.5 kg. or pole

51 kg Delivery: 180 days
#11

Supply of Aluminium Paint

Supply of Aluminium Paint

122 ltr Delivery: 180 days
#12

Supply of Red Oxide Paint

Supply of Red Oxide Paint

122 ltr Delivery: 180 days
#13

Supply of Bolts, Nuts and Washer all sizes

Supply of Bolts, Nuts and Washer all sizes

198 kg Delivery: 180 days
#14

Supply of E-bracket

Supply of E-bracket

102 no Delivery: 180 days
#15

Supply of F-bracket or Top Cleat in MS channel

Supply of F-bracket or Top Cleat in MS channel

70 no Delivery: 180 days
#16

Supply of Eye Bolt

Supply of Eye Bolt

100 no Delivery: 180 days
#17

Supply of Aluminium Lug of suitable size

Supply of Aluminium Lug of suitable size

120 no Delivery: 180 days
#18

Supply of HDPE pipe 150 mm dia

Supply of HDPE pipe 150 mm dia

1,750 mtr Delivery: 180 days
#19

Supply of GI Pipe 6 inch dia

Supply of GI Pipe 6 inch dia

265 mtr Delivery: 180 days
#20

Supply of M.S. Angle Iron 65x65x6mm, 4300 mm long 2 or 6 or 8 no. Bracing, with 4 or 12 or 16 clamps -5.8 kg. or m

Supply of M.S. Angle Iron 65x65x6mm, 4300 mm long 2 or 6 or 8 no. Bracing, with 4 or 12 or 16 clamps -5.8 kg. or m

16 set Delivery: 180 days
#21

Supply of M.S. Angle Iron 65x65x6, 3200mm long, 5.8 Kg or Mtr. for cable with clamp

Supply of M.S. Angle Iron 65x65x6, 3200mm long, 5.8 Kg or Mtr. for cable with clamp

58 no Delivery: 180 days
#22

Supply of Top channel 125X65mm, 3200 mm long -13.10 Kg. or m with clamp

Supply of Top channel 125X65mm, 3200 mm long -13.10 Kg. or m with clamp

66 no Delivery: 180 days
#23

Supply of Guarding Angle 75x75x6mm -3500 or 2200 mm long

Supply of Guarding Angle 75x75x6mm -3500 or 2200 mm long

800 kg Delivery: 180 days
#24

Erection, Installation and Commissioning of Holding clamp for ST Pole-Cross arm

Erection, Installation and Commissioning of Holding clamp for ST Pole-Cross arm

70 no Delivery: 180 days
#25

Erection, Installation and Commissioning of Holding clamp for ST or PCC Pole-Guarding Angle

Erection, Installation and Commissioning of Holding clamp for ST or PCC Pole-Guarding Angle

50 no Delivery: 180 days
#26

Erection, Installation and Commissioning of Armour rod with ferule

Erection, Installation and Commissioning of Armour rod with ferule

210 set Delivery: 180 days
#27

Erection, Installation and Commissioning of Stone Pad 300x300x75 mm

Erection, Installation and Commissioning of Stone Pad 300x300x75 mm

122 no Delivery: 180 days
#28

Erection, Installation and Commissioning of Earth wire clamp with Bolts and Nuts

Erection, Installation and Commissioning of Earth wire clamp with Bolts and Nuts

122 no Delivery: 180 days
#29

Erection, Installation and Commissioning of P.G. Clamps for panther

Erection, Installation and Commissioning of P.G. Clamps for panther

120 no Delivery: 180 days
#30

Erection, Installation and Commissioning of Number Plates with clamp, nuts and bolts

Erection, Installation and Commissioning of Number Plates with clamp, nuts and bolts

96 no Delivery: 180 days
#31

Erection, Installation and Commissioning of Danger Board with clamp for 33 KV

Erection, Installation and Commissioning of Danger Board with clamp for 33 KV

96 no Delivery: 180 days
#32

Erection, Installation and Commissioning of GI Barbed wire -2kg. or pole

Erection, Installation and Commissioning of GI Barbed wire -2kg. or pole

244 kg Delivery: 180 days
#33

Erection, Installation and Commissioning of Aluminium binding wire- 6 swg -0.5 kg. or pole

Erection, Installation and Commissioning of Aluminium binding wire- 6 swg -0.5 kg. or pole

51 kg Delivery: 180 days
#34

Erection, Installation and Commissioning of Aluminium Paint

Erection, Installation and Commissioning of Aluminium Paint

122 ltr Delivery: 180 days
#35

Erection, Installation and Commissioning of Red Oxide Paint

Erection, Installation and Commissioning of Red Oxide Paint

122 ltr Delivery: 180 days
#36

Erection, Installation and Commissioning of Bolts, Nuts and Washer all sizes

Erection, Installation and Commissioning of Bolts, Nuts and Washer all sizes

198 kg Delivery: 180 days
#37

Erection, Installation and Commissioning of E-bracket

Erection, Installation and Commissioning of E-bracket

102 no Delivery: 180 days
#38

Erection, Installation and Commissioning of F-bracket or Top Cleat in MS channel

Erection, Installation and Commissioning of F-bracket or Top Cleat in MS channel

70 no Delivery: 180 days
#39

Erection, Installation and Commissioning of Eye Bolt

Erection, Installation and Commissioning of Eye Bolt

100 no Delivery: 180 days
#40

Erection, Installation and Commissioning of Aluminium Lug of suitable size

Erection, Installation and Commissioning of Aluminium Lug of suitable size

120 no Delivery: 180 days
#41

Erection, Installation and Commissioning of HDPE pipe 150 mm dia

Erection, Installation and Commissioning of HDPE pipe 150 mm dia

1,750 mtr Delivery: 180 days
#42

Erection, Installation and Commissioning of GI Pipe 6inch dia

Erection, Installation and Commissioning of GI Pipe 6inch dia

265 mtr Delivery: 180 days
#43

Erection, Installation and Commissioning of M.S. Angle Iron 65x65x6mm, 4300 mm long 2 or 6 or 8 no. Erection, Installation and Commissioning of Bracing, with 4 or 12 or 16 clamps -5.8 kg. or m

Erection, Installation and Commissioning of M.S. Angle Iron 65x65x6mm, 4300 mm long 2 or 6 or 8 no. Erection, Installation and Commissioning of Bracing, with 4 or 12 or 16 clamps -5.8 kg. or m

16 set Delivery: 180 days
#44

Erection, Installation and Commissioning of M.S. Angle Iron 65x65x6, 3200mm long, 5.8 Kg or Mtr. for cable with clamp

Erection, Installation and Commissioning of M.S. Angle Iron 65x65x6, 3200mm long, 5.8 Kg or Mtr. for cable with clamp

58 no Delivery: 180 days
#45

Erection, Installation and Commissioning of Top channel 125X65mm, 3200 mm long -13.10 Kg. or m with clamp

Erection, Installation and Commissioning of Top channel 125X65mm, 3200 mm long -13.10 Kg. or m with clamp

66 no Delivery: 180 days
#46

Erection, Installation and Commissioning of Guarding Angle 75x75x6mm -3500 or 2200 mm long

Erection, Installation and Commissioning of Guarding Angle 75x75x6mm -3500 or 2200 mm long

800 kg Delivery: 180 days
#47

Safe carriage, Shifting up JE dump store or side from any ESC Center of Jhansi Zone and Erection, Commissioning and installation of ST Pole 11 Mt Long-SP-55

Safe carriage, Shifting up JE dump store or side from any ESC Center of Jhansi Zone and Erection, Commissioning and installation of ST Pole 11 Mt Long-SP-55

20 no Delivery: 180 days
#48

Safe carriage, Shifting up JE dump store or side from any ESC Center of Jhansi Zone and Erection, Commissioning and installation of ST Pole 16 Mt Long-SP-78

Safe carriage, Shifting up JE dump store or side from any ESC Center of Jhansi Zone and Erection, Commissioning and installation of ST Pole 16 Mt Long-SP-78

102 no Delivery: 180 days
#49

Safe carriage, Shifting up JE dump store or side from any ESC Center of Jhansi Zone and Erection, Commissioning and installation of V-type cross arm 100x50x6 mm

Safe carriage, Shifting up JE dump store or side from any ESC Center of Jhansi Zone and Erection, Commissioning and installation of V-type cross arm 100x50x6 mm

150 no Delivery: 180 days
#50

Safe carriage, Shifting up JE dump store or side from any ESC Center of Jhansi Zone and Erection, Commissioning and installation of 33 KV Disc Insulator BandS. Type 70 KN.

Safe carriage, Shifting up JE dump store or side from any ESC Center of Jhansi Zone and Erection, Commissioning and installation of 33 KV Disc Insulator BandS. Type 70 KN.

424 no Delivery: 180 days
#51

Safe carriage, Shifting up JE dump store or side from any ESC Center of Jhansi Zone and Erection, Commissioning and installation of Disc Fittings Panther 70 KN.

Safe carriage, Shifting up JE dump store or side from any ESC Center of Jhansi Zone and Erection, Commissioning and installation of Disc Fittings Panther 70 KN.

100 no Delivery: 180 days
#52

Safe carriage, Shifting up JE dump store or side from any ESC Center of Jhansi Zone and Erection, Commissioning and installation of 33KV Pin Insulator

Safe carriage, Shifting up JE dump store or side from any ESC Center of Jhansi Zone and Erection, Commissioning and installation of 33KV Pin Insulator

472 no Delivery: 180 days
#53

Safe carriage, Shifting up JE dump store or side from any ESC Center of Jhansi Zone and Erection, Commissioning and installation of 33KV Pin with Nut

Safe carriage, Shifting up JE dump store or side from any ESC Center of Jhansi Zone and Erection, Commissioning and installation of 33KV Pin with Nut

472 no Delivery: 180 days
#54

Safe carriage, Shifting up JE dump store or side from any ESC Center of Jhansi Zone and Erection, Commissioning and installation of GI wire 6 SWG for guarding along the line

Safe carriage, Shifting up JE dump store or side from any ESC Center of Jhansi Zone and Erection, Commissioning and installation of GI wire 6 SWG for guarding along the line

475 kg Delivery: 180 days
#55

Safe carriage, Shifting up JE dump store or side from any ESC Center of Jhansi Zone and Erection, Commissioning and installation of GI wire 8 SWG for guarding a cross the line

Safe carriage, Shifting up JE dump store or side from any ESC Center of Jhansi Zone and Erection, Commissioning and installation of GI wire 8 SWG for guarding a cross the line

65 kg Delivery: 180 days
#56

Safe carriage, Shifting up JE dump store or side from any ESC Center of Jhansi Zone and Erection, Commissioning and installation of Earthing complete with GI Wire 8SWG

Safe carriage, Shifting up JE dump store or side from any ESC Center of Jhansi Zone and Erection, Commissioning and installation of Earthing complete with GI Wire 8SWG

122 no Delivery: 180 days
#57

Safe carriage, Shifting up JE dump store or side from any ESC Center of Jhansi Zone and Erection, Commissioning and installation of Single core PVC Cable 1x240 Sq.mm.

Safe carriage, Shifting up JE dump store or side from any ESC Center of Jhansi Zone and Erection, Commissioning and installation of Single core PVC Cable 1x240 Sq.mm.

180 mtr Delivery: 180 days
#58

Safe carriage, Shifting up JE dump store or side from any ESC Center of Jhansi Zone and Erection, Commissioning and installation of Complete Stay -GI Stay rod 20x1800 mm, Stay 7 or 8 SWG 10 Kg.

Safe carriage, Shifting up JE dump store or side from any ESC Center of Jhansi Zone and Erection, Commissioning and installation of Complete Stay -GI Stay rod 20x1800 mm, Stay 7 or 8 SWG 10 Kg.

80 no Delivery: 180 days
#59

Safe carriage, Shifting up JE dump store or side from any ESC Center of Jhansi Zone and Erection, Commissioning and installation of 33 KV XLPE Cable 3x300 sq.mm. carrige only

Safe carriage, Shifting up JE dump store or side from any ESC Center of Jhansi Zone and Erection, Commissioning and installation of 33 KV XLPE Cable 3x300 sq.mm. carrige only

13,590 mtr Delivery: 180 days
#60

Safe carriage, Shifting up JE dump store or side from any ESC Center of Jhansi Zone and Erection, Commissioning and installation of 33 KV XLPE 3X300 sq.mmm C or J or Kit -Outdoor

Safe carriage, Shifting up JE dump store or side from any ESC Center of Jhansi Zone and Erection, Commissioning and installation of 33 KV XLPE 3X300 sq.mmm C or J or Kit -Outdoor

88 no Delivery: 180 days
#61

Safe carriage, Shifting up JE dump store or side from any ESC Center of Jhansi Zone and Erection, Commissioning and installation of ACSR Panther Conductor 29 Km.

Safe carriage, Shifting up JE dump store or side from any ESC Center of Jhansi Zone and Erection, Commissioning and installation of ACSR Panther Conductor 29 Km.

16,100 km Delivery: 180 days
#62

Safe carriage, Shifting up JE dump store or side from any ESC Center of Jhansi Zone and Erection, Commissioning and installation of 33KV RMU 3 Way

Safe carriage, Shifting up JE dump store or side from any ESC Center of Jhansi Zone and Erection, Commissioning and installation of 33KV RMU 3 Way

2 no Delivery: 180 days
#63

Concreting, grouting and muffing of support -STP or PCC pole 0.268 cu.mtr or pole with material

Concreting, grouting and muffing of support -STP or PCC pole 0.268 cu.mtr or pole with material

122 no Delivery: 180 days
#64

Laying and Dressing of 3x300 sqmm XLPE cable by digging method the cable shall with duly protected by brick, sand and stone slab and refiling, raiming of the left oil soil as per drawing.

Laying and Dressing of 3x300 sqmm XLPE cable by digging method the cable shall with duly protected by brick, sand and stone slab and refiling, raiming of the left oil soil as per drawing.

10,745 mtr Delivery: 180 days
#65

Laying of 33 KV XLPE cable 3x300 sqmm in HDPE Pipe underground minimum 1.5 meters below by HDD Method

Laying of 33 KV XLPE cable 3x300 sqmm in HDPE Pipe underground minimum 1.5 meters below by HDD Method

1,710 mtr Delivery: 180 days
#66

Tree cutting compensation

Tree cutting compensation

12 job Delivery: 180 days
#67

Making of cable J or kit

Making of cable J or kit

88 no Delivery: 180 days
#68

Panel room for 33KV RMU -12x12x10Ft with all complete respect in MS Shade

Panel room for 33KV RMU -12x12x10Ft with all complete respect in MS Shade

2 no Delivery: 180 days
#69

Concreting and Grouting of Stay set -0.108 Cu.m. or Stay

Concreting and Grouting of Stay set -0.108 Cu.m. or Stay

80 no Delivery: 180 days
#70

Documentation fee for NOC FROM PWD or Railway or Defence Department

Documentation fee for NOC FROM PWD or Railway or Defence Department

3 job Delivery: 180 days
#71

Fee for NOC FROM Electrical Safety Department

Fee for NOC FROM Electrical Safety Department

1 job Delivery: 180 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Audited financial statements for last 3 years or CA certificate showing turnover

4

Turnover certificates from CA/Cost Accountant

5

EMD submission proof

6

Technical bid documents aligned with BOQ (71 items) and IS/ISO/ATC references

7

OEM authorization certificates (if applicable)

8

Bidder undertaking confirming financial health (no liquidation/bankruptcy)

Corrigendum Updates

3 Updates
#1

Update

23-Mar-2026

Extended Deadline

26-Mar-2026, 2:00 pm

Opening Date

26-Mar-2026, 2:30 pm

#2

Update

20-Mar-2026

Extended Deadline

23-Mar-2026, 2:00 pm

Opening Date

23-Mar-2026, 2:30 pm

#3

Update

12-Mar-2026

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

How to bid in the Jhansi tender for supply installation testing commissioning?

Bidders must meet eligibility criteria including turnover, financial health, and EMD submission of ₹180,000. Prepare GST, PAN, audited financials or CA certificate, OEM authorizations, and ATC documents. The scope covers Supply, Installation, Testing and Commissioning with quantity variation up to 25%. Submit via GeM portal with compliant bid pricing.

What documents are required for the UPPCL procurement in Jhansi?

Submit GST registration, PAN card, experience certificates, audited balance sheets or CA certificate indicating turnover, EMD proof, technical bid/boQ alignment, and OEM authorizations if applicable. Also include undertaking confirming non-liquidation status and completion of mandatory ATC documentation.

What are the delivery terms for the 2026 Uttar Pradesh tender?

Delivery starts from the last date of the original delivery order; option clause allows up to 25% quantity increase during contract with time calculated as (increased/original) × original delivery period, minimum 30 days. Extended delivery allowed within original term per ATC guidance.

What is the EMD for the UPPCL Jhansi procurement?

The Earnest Money Deposit is ₹180,000. It must be submitted as specified by the GeM terms, with possible formats per ATC: online payment or bank demand draft, depending on portal requirements; ensure validity through the bid submission window.

Which standards or certifications are required for the bid?

The tender requires ATC-compliant documentation; while explicit standards are not listed, bidders should expect IS/ISO compliance or equivalent in the BOQ context. Ensure all OEM authorizations and Quality/Testing documents are included as per ATC instructions.

When is the turnover evidence due for the bid in Jhansi?

Provide the minimum average annual turnover for the last three financial years ending 31st March of the preceding year, validated by audited balance sheets or CA certifications. If the bidder is under 3 years old, use turnover since incorporation for the three completed years.