Bid Publish Date
06-Sep-2026, 1:07 pm
Bid End Date
28-Sep-2026, 2:00 pm
EMD
₹50,000
Location
Progress
EMD of ₹50,000 required with bid submission
Quantity may be increased up to 25% during/after contract at contracted rates
Delivery period calculated with minimum 30 days extension when option exercised
Payment terms to be defined per ATC; likely contingent on delivery milestones and acceptance
Delivery starts after original delivery order date; option for extended delivery with computed time per formula
Penalties, if any, will be specified in ATC; bidders should review for LDs or performance bonds
Evidence of capability to supply IT hardware and MFP devices
Financial stability and turnover as required by ATC
Compliance with delivery and warranty terms stipulated in ATC
Quantity
20
Category
All in One PC (V2)
Bid Type
Two Packet Bid
Bid Validity
30 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
50% Lowest Priced Technically Qualified Bidders
Tech Clarification Time
2 Days
EMD Required
Yes
MII Purchase Preference
No
MSE Purchase Preference
No
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
5
OEM Avg. Turnover
60
Past Performance
80 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
All in One PC (V2) (Q2) , A4 and Legal Size Multifunction Printer (MFP) (Q2) , Multimedia Projector (MMP) (Q2)
Advisory Bank
State Bank of India
Payment Timelines
Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Pre-Bid Date
08-09-2026 13:00:00
Pre-Bid Venue
https://meet.google.com/uor-orgc-ssb
Max Delivery Days
90
Delivery Locations
1
Delivery Cities
Spsr Nellore
Delivery Pincodes
524005
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Mahammad Khaja Rahamthulla | 524005,Opp. to FCI Godown, Venkateswarapuram, Nellore | Spsr Nellore | Andhra Pradesh | 524005 | 18 | 90 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar product procurement
Financial statements or turnover proof
EMD deposit receipt (₹50,000) or online payment proof
Technical bid submission documents
OEM authorizations (for branded items, if required in ATC)
Any other documentation specified in the ATC or tender terms
Key insights about ANDHRA PRADESH tender market
Bidders should review the ATC document for required submission the EMD of ₹50,000, GST and PAN details, experience certificates, and financial statements. Prepare to supply All-in-One PC, A4/Legal MFP, and Multimedia Projector with delivery terms matching the option clause and 25% quantity variation.
Required documents include GST registration, PAN, experience certificates for similar hardware procurement, financial statements, EMD receipt of ₹50,000, technical bid documents, OEM authorizations if branded items are used, and any ATC-specified documents.
Delivery commences from the last date of the original delivery order; if the option clause is exercised, extended time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days.
EMD is ₹50,000; payment terms will be defined in the ATC. Submit the EMD along with the bid as per ATC instructions and accepted payment method.
Items include All-in-One PC (V2), A4 and Legal Size MFP, and Multimedia Projector (MMP); no BOQ is listed, so bids must cover all three product categories under a single procurement action.
Bid quantity may be increased up to 25%; extended delivery time uses the formula mentioned above with a minimum 30 days, ensuring practical planning for scale-up during the contract period.
The ATC document uploaded by the buyer contains all mandatory terms, submission formats, and any brand or certification requirements; bidders must review it thoroughly before finalizing their bid.