Progress
RAThe Indian Army, Department Of Military Affairs, seeks the upkeeping of EWBB Rackers – 82 Nos – at GE EP Jodhpur, Rajasthan 342001. Scope includes dismantling/restacking by manpower, surface preparation (rust removal, scraping), primer application (red oxide), two coats of enamel paint (OG enamel), kerosene cleaning, lubrication, and restacking under supervision. The contract allows a ±25% quantity variation with contracted rates and begins delivery from the last date of the original order, with adjustments for extended delivery as per option clause. The inclusion of pre-dispatch inspection and on-site commissioning logistics at GE EP Jodhpur is specified. The tender emphasizes inspection timelines and on-site acceptance practices, ensuring compliance with contract deliverables and regulatory standards while maintaining operational readiness of EWBB Racker assets.
EWBB Racker refurbishment: 82 units
Surface work includes rust removal, old paint/dirt removal, grease removal
Primer: Red oxide metal primer
Paint: Two coats OG enamel metal paint
Cleaning: Kerosene wash of holes, grease application
Restacking: As directed by BSO and GE Engr Park Jodhpur
Inspection: Pre-dispatch inspection by Buyer/External Agency; 7-day readiness window
Option clause allows +/-25% quantity variation at contracted rates
Delivery period starts from last date of original delivery order with extended period rules
Pre-dispatch inspection required; external agency may be engaged; inspection window is 7 days
All work to be performed at GE EP Jodhpur, Rajasthan
No explicit payment schedule disclosed; contract allows quantity variation with contracted rates under option clause
Delivery starts from last date of original delivery order; additional time calculated as (Increased quantity ÷ Original quantity) × Original delivery period with a minimum 30 days
Not specified in provided data
Evidence of GST registration and PAN
Experience in refurbishment or maintenance of military or heavy equipment preferred
Ability to perform on-site work at GE EP Jodhpur and comply with pre-dispatch inspection
These are the final prices after the reverse auction event. Prices may be lower than initial bids.
| Rank | Seller | Final Price | Item |
|---|---|---|---|
| L1 | SINGAD ENTERPRISES(MSE,MII) Under PMA Winner | ₹35,043 | Item Categories : Upkeeping of EWBB Racker 82 Nos at GE EP Jodhpur,Removing from stack arranging on groud by men powe |
| L2 | VISHWAKARMA ENGINEERING WORKS (MSE,MII) Under PMA | ₹35,251 | Item Categories : Upkeeping of EWBB Racker 82 Nos at GE EP Jodhpur,Removing from stack arranging on groud by men powe |
| L3 | SIDHI VINAYAK ENTERPRISES (MSE,MII) Under PMA | ₹41,601 | Item Categories : Upkeeping of EWBB Racker 82 Nos at GE EP Jodhpur,Removing from stack arranging on groud by men powe |
| L4 | AERO SPACE INDUSTRIES (MSE,MII) Under PMA | ₹49,740 | Item Categories : Upkeeping of EWBB Racker 82 Nos at GE EP Jodhpur,Removing from stack arranging on groud by men powe |
| L5 | VISHWAS ENTERPRISES (MSE,MII) Under PMA | ₹2,12,620 | Item Categories : Upkeeping of EWBB Racker 82 Nos at GE EP Jodhpur,Removing from stack arranging on groud by men powe |
🎉 L1 Winner
SINGAD ENTERPRISES(MSE,MII) Under PMA
Final Price: ₹35,043
Start
25-Aug-2026, 1:00 pm
End
27-Aug-2026, 9:00 am
Duration: 44 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
Quantity
455
Category
Upkeeping of EWBB Racker 82 Nos at GE EP Jodhpur
Bid Type
Two Packet Bid
Bid Validity
60 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
OEM Avg. Turnover
1
Past Performance
50 %
Warranty Period
1 years
Experience Required
2 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Upkeeping of EWBB Racker 82 Nos at GE EP Jodhpur , Removing from stack arranging on groud by men power as per scope of work , De rusting removing old loose paint dirt old grease and Scratching with wire brush or hand grinder as per scope of work , Scratching with wire brush or hand grinder as per scope of work , Applying one coat of Red oxide metal primer as per scope of work , Applying two coat of OG enameled metal paint as per scope of work , Washing cleaning of all holes by kerosene then applying the grease as per scope of work , Restacking all as directed by BSO and GE Engr Park jodhpur as per scope of work
Advisory Bank
State Bank of India
ePBG Percentage
3%
ePBG Duration (Months)
14
Max Delivery Days
60
Delivery Locations
1
Delivery Cities
JODHPUR CITY
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | JODHPUR CITY | JODHPUR CITY | - | - | 1 | 60 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Upkeeping of EWBB Racker 82 Nos at GE EP Jodhpur
Scope of works as per appx A attached last page RFP
Removing from stack arranging on groud by men power as per scope of work
Scope of works as per appx A attached last page RFP
De rusting removing old loose paint dirt old grease and Scratching with wire brush or hand grinder as per scope of work
Scope of works as per appx A attached last page RFP
Scratching with wire brush or hand grinder as per scope of work
Scope of works as per appx A attached last page RFP
Applying one coat of Red oxide metal primer as per scope of work
Scope of works as per appx A attached last page RFP
Applying two coat of OG enameled metal paint as per scope of work
Scope of works as per appx A attached last page RFP
Washing cleaning of all holes by kerosene then applying the grease as per scope of work
Scope of works as per appx A attached last page RFP
Restacking all as directed by BSO and GE Engr Park jodhpur as per scope of work
Scope of works as per appx A attached last page RFP
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Upkeeping of EWBB Racker 82 Nos at GE EP Jodhpur | Scope of works as per appx A attached last page RFP | 1 | job | janakiramanm | 60 | |
| 2 | Removing from stack arranging on groud by men power as per scope of work | Scope of works as per appx A attached last page RFP | 82 | nos | janakiramanm | 60 | |
| 3 | De rusting removing old loose paint dirt old grease and Scratching with wire brush or hand grinder as per scope of work | Scope of works as per appx A attached last page RFP | 82 | nos | janakiramanm | 60 | |
| 4 | Scratching with wire brush or hand grinder as per scope of work | Scope of works as per appx A attached last page RFP | 82 | nos | janakiramanm | 60 | |
| 5 | Applying one coat of Red oxide metal primer as per scope of work | Scope of works as per appx A attached last page RFP | 15 | ltrs | janakiramanm | 60 | |
| 6 | Applying two coat of OG enameled metal paint as per scope of work | Scope of works as per appx A attached last page RFP | 29 | ltrs | janakiramanm | 60 | |
| 7 | Washing cleaning of all holes by kerosene then applying the grease as per scope of work | Scope of works as per appx A attached last page RFP | 82 | nos | janakiramanm | 60 | |
| 8 | Restacking all as directed by BSO and GE Engr Park jodhpur as per scope of work | Scope of works as per appx A attached last page RFP | 82 | nos | janakiramanm | 60 |
Copy of PAN Card
Copy of GSTIN
Copy of Cancelled Cheque
Copy of EFT Mandate certified by Bank
GST registration certificate
Company/Vendor Code creation documents
Any prior experience certificates related to equipment refurbishment
OEM authorizations or service capability documents (if applicable)
Key insights about RAJASTHAN tender market
Bidders must submit PAN, GSTIN, cancelled cheque, and EFT mandate, plus vendor code creation documents. The contract allows ±25% quantity variation and requires pre-dispatch inspection by Buyer or External Agency. Ensure on-site capability at GE EP Jodhpur and readiness within 7 days of inspection notice.
Required documents include PAN, GSTIN, cancelled cheque, EFT mandate, GST certificate, vendor code creation papers, and any OEM authorizations or experience certificates for refurbishment work. Pre-dispatch inspection arrangements and inspection fees are governed by Buyer terms.
Scope includes rust removal, dirt/old grease removal, wire-brush/grinder scratching, red oxide primer application, two coats OG enamel paint, kerosene cleaning of holes, grease application, and restacking under BSO/GE Engr Park Jodhpur supervision.
Delivery period starts from the last date of the original delivery order. If the option clause is exercised, extended time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days.
Specific payment terms are not detailed; however, the contract includes a standard option clause for quantity adjustments and on-site delivery. Expect payment terms to align with government tender norms and post-inspection acceptance at GE EP Jodhpur.
Buyer or nominated external inspection agencies will conduct pre-dispatch inspection at Seller premises. Fees for external testing are borne by the Buyer; readiness should be communicated within 7 days of inspection offer email.
Eligibility favors bidders with prior refurbishment or maintenance of military/military-adjacent equipment. Submit experience certificates and relevant project details; ensure capability to perform on-site at GE EP Jodhpur and comply with inspection procedures.
All refurbishment work and on-site activities will be conducted at GE Electrical Plant (GE EP) Jodhpur, Rajasthan, with supervision by BSO and GE Engr Park Jodhpur.