Progress
Power Grid Corporation Of India Limited has released a public tender for Supply, Installation, Commissioning and Maintenance of CCTV Surveillance System at POWERGRID Guwahat in KAMRUP, ASSAM. Quantity: 1. Submission Deadline: 02-11-2026 11: 00: 00. Download documents and apply online.
Quantity
1
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
4 Days
EMD Required
Yes
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
Yes (Arbitration clause document) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 Arbitration should not be routinely included in contracts
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Supply, Installation, Commissioning and Maintenance of CCTV Surveillance System at POWERGRID Guwahat
Advisory Bank
State Bank of India
ePBG Percentage
5%
ePBG Duration (Months)
41
Payment Timelines
Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
60
Delivery Locations
1
Delivery Cities
Kamrup Metro
Delivery Pincodes
781019
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Raju Boruah | 781019,"Power Grid Corporation of India Limited Pub Suraj Nagar, Nutan Bazar, Odalbakra, Kahilipara, Guwahati, Assam- 781019", Kamrup, 781019 | Kamrup Metro | Assam | 781019 | 1 | 60 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
TECHNICAL
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
Certificate (Requested in ATC)
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC)
Additional Doc 3 (Requested in ATC)
Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer