Indian Army Volt Meter, Fuel Pipe, Solenoid Switch & Related Electrical Components Tender Budgam Jammu & Kashmir 2026
Indian Army
BUDGAM, JAMMU & KASHMIR
Bid Publish Date
28-Feb-2025, 3:25 pm
Bid End Date
22-Mar-2025, 4:00 pm
EMD
₹14,000
Location
Progress
Quantity
93
Bid Type
Two Packet Bid
Public procurement opportunity for Indian Council Of Forestry Research And Education (icfre) TRANSFORMER SCADA, TRANSFORMER GAPLESS, TRANSFORMER SWITCH, TRANSFORMER FUSE, TRANSFORMER METER, TRANSFORMER INDICATOR, TRANSFORMER, RUBBER, VOLT METER in CHHINDWARA, MADHYA PRADESH. Quantity: 93 issued by. Submission Deadline: 22-03-2025 16: 00: 00. View full details and respond.
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
TRANSFORMER SCADA , TRANSFORMER GAPLESS , TRANSFORMER SWITCH , TRANSFORMER FUSE , TRANSFORMER METER , TRANSFORMER INDICATOR , TRANSFORMER , RUBBER , VOLT METER
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
BUDGAM, JAMMU & KASHMIR
Indian Army
TINSUKIA, ASSAM
Indian Army
BUDGAM, JAMMU & KASHMIR
E-municipalities - Eservices To Citizens And Employees Of Urban Local Bodies Of Uttar Pradesh
BAHRAICH, UTTAR PRADESH
Indian Army
Sri Ganganagar, RAJASTHAN
Tender Results
Loading results...
TRANSFORMER SCADA
33 KV VCB SCADA COMPATIBILITY WITH
TRANSFORMER GAPLESS
33 KV LA POLYMER TYPE GAPLESS
TRANSFORMER SWITCH
33 KV AB SWITCH 600 AMP TP
TRANSFORMER FUSE
FUSE ELEMENT 25 AMPS FOR
TRANSFORMER METER
POWER FACTOR METER
TRANSFORMER INDICATOR
OIL TEMPERATURE INDICATOR (OTI)
TRANSFORMER
WINDING TEMPERATURE
TRANSFORMER
33 KV CONTROL & RELAY PANEL WITH
TRANSFORMER
DC AMPERE METER 0-15 AMP FOR 33
TRANSFORMER
LEAD ACID BATTERY SET 30
TRANSFORMER
BATTERY CHARGER 230 V AC INPUT 10
TRANSFORMER
33 KV 10KN PIN INSULATOR
TRANSFORMER
33 KV CT OUTDOOR TYPE 200
TRANSFORMER
TRANSFORMER OIL GR 1
TRANSFORMER
ALUMINUM PAINT
TRANSFORMER
RED OXIDE PAINT
TRANSFORMER
FIRE FIGHTING ARRANGEMENT (AS PER)
RUBBER
RUBBER MATTING ALL SIZE
TRANSFORMER
SUPPLY AND ERECTION OF USING 33 KVA 50 KVR
VOLT METER
33 KVA DO SET (COMPLETE)
VOLT METER
TRANSFORMER BREATHER
VOLT METER
VOLT METER
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | TRANSFORMER SCADA | 33 KV VCB SCADA COMPATIBILITY WITH | 1 | number | majidkhan | 15 | |
| 2 | TRANSFORMER GAPLESS | 33 KV LA POLYMER TYPE GAPLESS | 3 | number | majidkhan | 15 | |
| 3 | TRANSFORMER SWITCH | 33 KV AB SWITCH 600 AMP TP | 1 | set | majidkhan | 15 | |
| 4 | TRANSFORMER FUSE | FUSE ELEMENT 25 AMPS FOR | 3 | number | majidkhan | 15 | |
| 5 | TRANSFORMER METER | POWER FACTOR METER | 1 | number | majidkhan | 15 | |
| 6 | TRANSFORMER INDICATOR | OIL TEMPERATURE INDICATOR (OTI) | 1 | number | majidkhan | 15 | |
| 7 | TRANSFORMER | WINDING TEMPERATURE | 1 | number | majidkhan | 15 | |
| 8 | TRANSFORMER | 33 KV CONTROL & RELAY PANEL WITH | 1 | number | majidkhan | 15 | |
| 9 | TRANSFORMER | DC AMPERE METER 0-15 AMP FOR 33 | 1 | number | majidkhan | 15 | |
| 10 | TRANSFORMER | LEAD ACID BATTERY SET 30 | 1 | number | majidkhan | 15 | |
| 11 | TRANSFORMER | BATTERY CHARGER 230 V AC INPUT 10 | 1 | number | majidkhan | 15 | |
| 12 | TRANSFORMER | 33 KV 10KN PIN INSULATOR | 10 | number | majidkhan | 15 | |
| 13 | TRANSFORMER | 33 KV CT OUTDOOR TYPE 200 | 3 | number | majidkhan | 15 | |
| 14 | TRANSFORMER | TRANSFORMER OIL GR 1 | 30 | liter | majidkhan | 15 | |
| 15 | TRANSFORMER | ALUMINUM PAINT | 10 | liter | majidkhan | 15 | |
| 16 | TRANSFORMER | RED OXIDE PAINT | 10 | liter | majidkhan | 15 | |
| 17 | TRANSFORMER | FIRE FIGHTING ARRANGEMENT (AS PER) | 1 | number | majidkhan | 15 | |
| 18 | RUBBER | RUBBER MATTING ALL SIZE | 10 | number | majidkhan | 15 | |
| 19 | TRANSFORMER | SUPPLY AND ERECTION OF USING 33 KVA 50 KVR | 1 | number | majidkhan | 15 | |
| 20 | VOLT METER | 33 KVA DO SET (COMPLETE) | 1 | set | majidkhan | 15 | |
| 21 | VOLT METER | TRANSFORMER BREATHER | 1 | set | majidkhan | 15 | |
| 22 | VOLT METER | VOLT METER | 1 | number | majidkhan | 15 |
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | BRIJESH KUMAR MISHRA Under PMA | - | 21-03-2025 20:52:11 |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | BRIJESH KUMAR MISHRA(MSE,MII)( MSE Social Category:General ) Under PMA | Item Categories : TRANSFORMER SCADA,TRANSFORMER GAPLESS,TRANSFORMER SWITCH,TRANSFORMER FUSE,TRANSFORMER METER,TRANSFO |
Key insights about MADHYA PRADESH tender market
The eligibility requirements include being a registered entity, demonstrating experience in similar supply and installation projects, and compliance with regulatory standards. It's essential to provide documented proof of your credentials and any relevant certifications for the equipment proposed.
Bidders must submit a set of relevant certificates showcasing compliance with safety and environmental standards. The necessary documents include certification for transformer equipment, ISO certifications, and any local licenses required by the Ministry of Environment Forest and Climate Change.
Interested parties must complete a straightforward registration process on the designated online tendering platform. This involves creating an account, submitting necessary business details, and verifying your entity's compliance with eligibility criteria.
All submitted documents must be in specific accepted document formats, typically including PDF and Excel. It's important to adhere to the format guidelines provided in the official tender documents to ensure seamless evaluation.
The payment terms for successful bidders will be outlined in the contract following submission approval, typically involving milestone payments. Additionally, a performance security must be provided, often requiring a percentage of the total bid amount to ensure compliance with the contractual obligations post-award.
Indian Army
📍 BHOPAL, MADHYA PRADESH
Indian Army
📍 BHOPAL, MADHYA PRADESH
Indian Army
📍 FARIDKOT, PUNJAB
Indian Army
📍 MATHURA, UTTAR PRADESH
Indian Army
📍 UDAIPUR, RAJASTHAN
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS