The Indian Army, Department Of Military Affairs, invites bids for hydraulic pumps in Ambala, Haryana 133001. The procurement scope references hydraulic pump equipment with an emphasis on compliance documentation rather than a published BOQ. The tender allows a quantity variation up to 25% of bid quantity at contract placement and during the currency at contracted rates. Bidders must ensure timely delivery, align with data-sheet verification, and meet at least one of the critical qualifications outlined in ISO 9001 certification requirements. Unique elements include the option clause and mandatory documentation alignment with the Data Sheet and End User considerations. This opportunity targets suppliers capable of ISO-compliant quality systems and robust documentation trails for government procurement in the military sector.
No technical specs are published in the BOQ. However, the buyer mandates:
Product category: Hydraulic Pump
Standards: ISO 9001 certification required (bidder or OEM)
Documentation: Data Sheet uploaded with bid
Quality evidence: Material Test Certificate accompanying supply
End User Certificate: Buyer’s standard format if requested
BOQ: Not available; emphasis on conformity and documentation
Quantities may vary ±25% at contract awarding and during currency
Mandatory ISO 9001 certification and data sheet verification
Submit PAN, GSTIN, cancelled cheque, EFT mandate, and MT test certificates
Not specified in tender data; standard GST-based reimbursement applies per actuals or quoted rate, subject to GST rules.
Delivery commencement linked to original delivery order date; option-period delivery adjustments follow the formula (Increase/Original × Original period) with a minimum 30 days.
Not specified explicitly; but LIKELY governed by standard government tender defaults and delivery penalties.
Not under liquidation or court receivership
Maintain GST registration and PAN
ISO 9001 certification (bidder or OEM)
Quantity
1
Bid Type
Two Packet Bid
Bid Validity
90 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Hydraulic Pump
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Ambala
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Ambala | Ambala | - | - | 1 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
PAN Card copy
GSTIN copy
Cancelled Cheque copy
EFT Mandate certified by Bank
Data Sheet for offered product
ISO 9001 certification (bidder or OEM)
Material Test Certificate
End User Certificate (if requested in Buyer's format)
Undertaking of non-liquidation status
Key insights about HARYANA tender market
Submit PAN, GSTIN, cancelled cheque, EFT mandate, and Data Sheet for offered hydraulic pump. Ensure ISO 9001 certification (bidder or OEM) and Material Test Certificate accompany the bid. Adhere to option clause up to 25% quantity variation and provide End User Certificate if requested by Buyer.
Required documents include PAN Card, GSTIN, Cancelled Cheque, EFT Mandate, Data Sheet, ISO 9001 certificate, Material Test Certificate, and End User Certificate if requested. Ensure non-liquidation undertaking and consortium details if applicable.
The purchaser may increase or decrease the quantity up to 25% of the bid quantity at contract placement and during currency at contracted rates; the delivery period adjusts based on the increased quantity with a minimum extension of 30 days.
Bidders must hold ISO 9001 certification (bidder or OEM). The offer must include a confirmatory Data Sheet and a Material Test Certificate to align with product specifications and verification by the Buyer.
The Data Sheet must detail model, performance, pressure ratings, materials, dimensions, and compliance with product specifications. It will be used to verify alignment with the offered pump and prevent mismatches during evaluation.
Delivery commencement is tied to the last date of the original delivery order; if extended, additional time follows the option clause formula with a minimum of 30 days, ensuring timely fulfillment per contract terms.