Progress
Organization: Bharat Petroleum Corporation Ltd. Procurement: SITC of air compressor for Ajmer LPG Plant in Rajasthan. No BOQ items listed and no explicit start/end dates or estimated value provided. Tender notes include an option clause allowing quantity adjustments up to 25% and extended delivery time calculations. The interface references an uploaded ATC document and a standard clause governing delivery schedules. This tender focuses on equipment supply and installation at a refinery/plant site, with scope driven by BPCL’s LPG facility needs in Ajmer. A unique aspect is the absence of listed itemized quantities, suggesting a flexible or up-to-date requisition process at the BPCL Ajmer site.
Product/service: AIR COMPRESSOR
Location/installation: BPCL Ajmer LPG Plant, Rajasthan
BOQ: 0 items (no quantity data available)
EMD/estimated value: Not specified in data
Standards/ Certifications: Not specified in data; review ATC
Delivery: Quantity adjustment up to 25% with formula-based extension
Warranty/AMC: Not specified in data; refer to ATC
Option clause allows ±25% quantity adjustment
Delivery time extended per formula with minimum 30 days
ATC document exists; bidders must review site terms
Not specified in data; bidders should verify BPCL ATC
Delivery period starts from last date of original delivery order; extended time calculated per (Increased quantity ÷ Original quantity) × Original delivery period; minimum 30 days
Not specified in data; verify in ATC
Experience in SITC of industrial air compressors
Ability to accept quantity fluctuations up to 25%
Compliance with BPCL ATC terms and site-specific requirements
Quantity
1
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
4
OEM Avg. Turnover
4
Past Performance
30 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
SITC OF AIR COMPRESSOR AT AJMER LPG PLANT
Advisory Bank
State Bank of India
ePBG Percentage
5%
ePBG Duration (Months)
18
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
30
Delivery Locations
1
Delivery Cities
Ajmer
Delivery Pincodes
305601
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| M Ganesh | 305601,BHARAT PETROLEUM CORP. LTD., LPG BOTTLING PLANT, NH 79A, Kishangarh Nasirabad Bypass, Village- Lavera, Tehsil- Nasirabad, Ajmer, Rajasthan-305601 | Ajmer | Rajasthan | 305601 | 1 | 30 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
BOQ
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates for SITC of industrial equipment
Financial statements or solvency proof
EMD/Security deposit (if required by BPCL terms)
Technical bid documents and OEM authorizations (if applicable)
ATC document acknowledgment and any site-specific compliance letters
Key insights about RAJASTHAN tender market
Bidders should submit GST, PAN, experience certificates, financial statements, and EMD as per BPCL ATC. Review the uploaded ATC for site-specific conditions, ensure capability for 25% quantity variation, and align delivery timelines with the formula (increased quantity/original quantity) × original period, minimum 30 days.
Required documents include GST certificate, PAN, experience certificates for SITC projects, financial statements, EMD deposit, technical bid documents, OEM authorizations if applicable, and acknowledgment of the ATC document for site terms.
Delivery terms permit a 25% quantity variation during contract, with extension periods calculated as (Increased quantity ÷ Original quantity) × Original delivery period, and a minimum extension of 30 days. The clock starts from the last date of the original order.
The scope is SITC (Site Installation and Commissioning) of an air compressor at the BPCL Ajmer LPG Plant location in Rajasthan. No BOQ items are listed, indicating a flexible or updated requisition per site demand.
Public data does not specify standards; bidders must review the ATC document uploaded by BPCL for any required certifications or OEM commitments and confirm compliance with site-specific BPCL requirements.
The data provided does not include explicit start/end dates. Bidders should consult the BPCL ATC and the GEM portal update for the definitive bid submission deadline and ensure submission of all mandatory documents listed in the ATC.
EMD amount is not specified in the available data. Bidders must verify the ATC document for the exact EMD amount, payment method, and validity period before submitting.
Review the uploaded ATC in the BPCL tender page, confirm OEM authorizations if required, and align proposal with BPCL delivery schedules, quantity variation rights, and any special installation requirements for the Ajmer LPG Plant.