TenderDekho Logo
Closed GEM

Open Tender for Door mechanism,Sterering gear box OH,Hub axel packing,Hub bolt,Transfer case hanger bracket cutting in BANGALORE, KARNATAKA

Bid Publish Date

19-Mar-2026, 1:13 pm

Bid End Date

02-Apr-2026, 2:00 pm

Generate Docs

Progress

Issue19-Mar-2026, 1:13 pm
Corrigendum30-Mar-2026
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

174

Category

Door mechanism

Bid Type

Two Packet Bid

Categories 66

Indian Army has released a public tender for Door mechanism, Sterering gear box OH, Hub axel packing, Hub bolt, Transfer case hanger bracket cutting welding and lathe work, Transfer cse mounting nut from chasis, Transfer case oil seal, Transfer case hanger bracket, Transferr case hanger nut and bolt, Air horn sending unit, Door catch, Door lockwise key, Side indicatoe assy, Headlight assy, Headlight bulb, Headlight holder, Convoy light assy, Tube bulb, Insulation tape, sleeve, cups, Elecric wire half roll, Electrician labour chrges for checking all broken wires repalcement of bulbs and fuses, Mechanical labour charges for removal of old items and fitment of new spares parts, Reverse light switch, Reverse light buzzer, Tail lamp assy, Combination switch, Electric wire half roll, Fog light assy, Fog light bulb, Exhaust brake pnuemati valve system OH, Indicator assy, Bty cut off swtich, Tail lamp glass, Door lockwith key, Brake booster assy, Tappet cover gasket, Electrician labour charges for checking all broken wires replacement of bulbs and fuses, Head light bulb, Reverse light seitch 24V, Cabin lifting pump OH, Radiator repair and OH, Propeller shaft spider bearing, Shaft flange wleding and lathe work, Properller shaft lathe work, Propeller shaft nut and bolt, Electrician labour charges for checking all broken wires repalcement of bulbs and fuses, Door lock with key, Side indicator assy, Ingition switch, Brake adjustment rear wheel brake shoe operating cam removal and refitting, Cam adjustment bolt, Elecrician labour charges for checking all broken wires replacement of bulbs and fuses, Cabin lifting pump union, Cabin lifting pump pipe, Reverse light buuzzer, Fuse, Steering high pressure pipe, Steering oil filter, Coolant pipe 10 Mtr, Electirc wire half roll, Headliight holder, Transfer case flange lathe work, Transfer case flange washer and distance pipe, Transfer case check nut, KM cable, Rear brake shoe liner with revitting, Brake adjustment rear wheel brake shoe operating car removal and refiting, Front indicator assy, Fog lamp bulb, Clutch cylinder assy, Steering gear box OH, Ignition switch, Hub axle packing, Hub Seal, Pressure plate, Clutch plate, Release bearing, Rear brake booster assy, Electrcian labour charges for checking all broken wires repalcement of bulbs and fuses in BANGALORE, KARNATAKA. Quantity: 174. Submission Deadline: 02-04-2026 14: 00: 00. Download documents and apply online.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Door mechanism , Sterering gear box OH , Hub axel packing , Hub bolt , Transfer case hanger bracket cutting welding and lathe work , Transfer cse mounting nut from chasis , Transfer case oil seal , Transfer case hanger bracket , Transferr case hanger nut and bolt , Air horn sending unit , Door catch , Door lockwise key , Side indicatoe assy , Headlight assy , Headlight bulb , Headlight holder , Convoy light assy , Tube bulb , Insulation tape, sleeve, cups , Elecric wire half roll , Electrician labour chrges for checking all broken wires repalcement of bulbs and fuses , Mechanical labour charges for removal of old items and fitment of new spares parts , Reverse light switch , Reverse light buzzer , Tail lamp assy , Combination switch , Electric wire half roll , Fog light assy , Fog light bulb , Exhaust brake pnuemati valve system OH , Indicator assy , Bty cut off swtich , Tail lamp glass , Door lockwith key , Brake booster assy , Tappet cover gasket , Electrician labour charges for checking all broken wires replacement of bulbs and fuses , Head light bulb , Reverse light seitch 24V , Cabin lifting pump OH , Radiator repair and OH , Propeller shaft spider bearing , Shaft flange wleding and lathe work , Properller shaft lathe work , Propeller shaft nut and bolt , Electrician labour charges for checking all broken wires repalcement of bulbs and fuses , Door lock with key , Side indicator assy , Ingition switch , Brake adjustment rear wheel brake shoe operating cam removal and refitting , Cam adjustment bolt , Elecrician labour charges for checking all broken wires replacement of bulbs and fuses , Cabin lifting pump union , Cabin lifting pump pipe , Reverse light buuzzer , Fuse , Steering high pressure pipe , Steering oil filter , Coolant pipe 10 Mtr , Electirc wire half roll , Headliight holder , Transfer case flange lathe work , Transfer case flange washer and distance pipe , Transfer case check nut , KM cable , Rear brake shoe liner with revitting , Brake adjustment rear wheel brake shoe operating car removal and refiting , Front indicator assy , Fog lamp bulb , Clutch cylinder assy , Steering gear box OH , Ignition switch , Hub axle packing , Hub Seal , Pressure plate , Clutch plate , Release bearing , Rear brake booster assy , Electrcian labour charges for checking all broken wires repalcement of bulbs and fuses

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9142726.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 125 Items Sign in for GEM prices

#1

Door mechanism

AS PER RFP

1 nos Delivery: 15 days
#2

Sterering gear box OH

AS PER RFP

1 job Delivery: 15 days
#3

Hub axel packing

AS PER RFP

2 set Delivery: 15 days
#4

Hub bolt

AS PER RFP

6 nos Delivery: 15 days
#5

Transfer case hanger bracket cutting welding and lathe work

AS PER RFP

1 job Delivery: 15 days
#6

Transfer cse mounting nut from chasis

AS PER RFP

6 nos Delivery: 15 days
#7

Transfer case oil seal

AS PER RFP

1 nos Delivery: 15 days
#8

Transfer case hanger bracket

AS PER RFP

1 nos Delivery: 15 days
#9

Transferr case hanger nut and bolt

AS PER RFP

1 set Delivery: 15 days
#10

Air horn sending unit

AS PER RFP

1 nos Delivery: 15 days
#11

Door catch

AS PER RFP

2 nos Delivery: 15 days
#12

Door lockwise key

AS PER RFP

1 nos Delivery: 15 days
#13

Side indicatoe assy

AS PER RFP

2 nos Delivery: 15 days
#14

Headlight assy

AS PER RFP

2 nos Delivery: 15 days
#15

Headlight bulb

AS PER RFP

2 nos Delivery: 15 days
#16

Headlight holder

AS PER RFP

2 nos Delivery: 15 days
#17

Convoy light assy

AS PER RFP

1 nos Delivery: 15 days
#18

Tube bulb

AS PER RFP

1 pkt Delivery: 15 days
#19

Insulation tape, sleeve, cups

AS PER RFP

1 set Delivery: 15 days
#20

Elecric wire half roll

AS PER RFP

1 nos Delivery: 15 days
#21

Electrician labour chrges for checking all broken wires repalcement of bulbs and fuses

AS PER RFP

1 job Delivery: 15 days
#22

Mechanical labour charges for removal of old items and fitment of new spares parts

AS PER RFP

1 job Delivery: 15 days
#23

Reverse light switch

AS PER RFP

1 nos Delivery: 15 days
#24

Reverse light buzzer

AS PER RFP

1 nos Delivery: 15 days
#25

Tail lamp assy

AS PER RFP

2 nos Delivery: 15 days
#26

Combination switch

AS PER RFP

1 nos Delivery: 15 days
#27

Insulation tape, sleeve, cups

AS PER RFP

1 set Delivery: 15 days
#28

Electric wire half roll

AS PER RFP

1 nos Delivery: 15 days
#29

Fog light assy

AS PER RFP

1 nos Delivery: 15 days
#30

Fog light bulb

AS PER RFP

1 nos Delivery: 15 days
#31

Exhaust brake pnuemati valve system OH

AS PER RFP

1 nos Delivery: 15 days
#32

Indicator assy

AS PER RFP

2 nos Delivery: 15 days
#33

Bty cut off swtich

AS PER RFP

1 nos Delivery: 15 days
#34

Tail lamp glass

AS PER RFP

1 nos Delivery: 15 days
#35

Door lockwith key

AS PER RFP

1 nos Delivery: 15 days
#36

Brake booster assy

AS PER RFP

2 nos Delivery: 15 days
#37

Tappet cover gasket

AS PER RFP

1 nos Delivery: 15 days
#38

Door catch

AS PER RFP

2 nos Delivery: 15 days
#39

Electrician labour charges for checking all broken wires replacement of bulbs and fuses

AS PER RFP

1 job Delivery: 15 days
#40

Mechanical labour charges for removal of old items and fitment of new spares parts

AS PER RFP

1 job Delivery: 15 days
#41

Head light bulb

AS PER RFP

1 nos Delivery: 15 days
#42

Reverse light seitch 24V

AS PER RFP

1 nos Delivery: 15 days
#43

Indicator assy

AS PER RFP

2 nos Delivery: 15 days
#44

Cabin lifting pump OH

AS PER RFP

1 job Delivery: 15 days
#45

Exhaust brake pnuemati valve system OH

AS PER RFP

1 nos Delivery: 15 days
#46

Radiator repair and OH

AS PER RFP

1 job Delivery: 15 days
#47

Propeller shaft spider bearing

AS PER RFP

2 nos Delivery: 15 days
#48

Shaft flange wleding and lathe work

AS PER RFP

1 job Delivery: 15 days
#49

Properller shaft lathe work

AS PER RFP

1 job Delivery: 15 days
#50

Propeller shaft nut and bolt

AS PER RFP

8 nos Delivery: 15 days
#51

Insulation tape, sleeve, cups

AS PER RFP

1 set Delivery: 15 days
#52

Electric wire half roll

AS PER RFP

1 nos Delivery: 15 days
#53

Electrician labour charges for checking all broken wires repalcement of bulbs and fuses

AS PER RFP

1 job Delivery: 15 days
#54

Mechanical labour charges for removal of old items and fitment of new spares parts

AS PER RFP

1 job Delivery: 15 days
#55

Reverse light switch

AS PER RFP

1 nos Delivery: 15 days
#56

Reverse light buzzer

AS PER RFP

1 nos Delivery: 15 days
#57

Door lock with key

AS PER RFP

1 nos Delivery: 15 days
#58

Door mechanism

AS PER RFP

1 nos Delivery: 15 days
#59

Side indicator assy

AS PER RFP

2 nos Delivery: 15 days
#60

Combination switch

AS PER RFP

1 nos Delivery: 15 days
#61

Fog light assy

AS PER RFP

2 nos Delivery: 15 days
#62

Ingition switch

AS PER RFP

2 nos Delivery: 15 days
#63

Brake adjustment rear wheel brake shoe operating cam removal and refitting

AS PER RFP

1 job Delivery: 15 days
#64

Cam adjustment bolt

AS PER RFP

1 nos Delivery: 15 days
#65

Insulation tape, sleeve, cups

AS PER RFP

1 set Delivery: 15 days
#66

Electric wire half roll

AS PER RFP

1 nos Delivery: 15 days
#67

Elecrician labour charges for checking all broken wires replacement of bulbs and fuses

AS PER RFP

1 job Delivery: 15 days
#68

Mechanical labour charges for removal of old items and fitment of new spares parts

AS PER RFP

1 job Delivery: 15 days
#69

Cabin lifting pump OH

AS PER RFP

1 nos Delivery: 15 days
#70

Cabin lifting pump union

AS PER RFP

1 nos Delivery: 15 days
#71

Cabin lifting pump pipe

AS PER RFP

1 nos Delivery: 15 days
#72

Transfer case oil seal

AS PER RFP

2 nos Delivery: 15 days
#73

Combination switch

AS PER RFP

1 nos Delivery: 15 days
#74

Exhaust brake pnuemati valve system OH

AS PER RFP

1 nos Delivery: 15 days
#75

Reverse light buuzzer

AS PER RFP

1 nos Delivery: 15 days
#76

Fuse

AS PER RFP

1 pkt Delivery: 15 days
#77

Door mechanism

AS PER RFP

1 nos Delivery: 15 days
#78

Steering high pressure pipe

AS PER RFP

1 nos Delivery: 15 days
#79

Steering oil filter

AS PER RFP

1 nos Delivery: 15 days
#80

Side indicator assy

AS PER RFP

1 nos Delivery: 15 days
#81

Coolant pipe 10 Mtr

AS PER RFP

1 nos Delivery: 15 days
#82

Insulation tape, sleeve, cups

AS PER RFP

1 set Delivery: 15 days
#83

Electirc wire half roll

AS PER RFP

1 nos Delivery: 15 days
#84

Electrician labour charges for checking all broken wires repalcement of bulbs and fuses

AS PER RFP

1 job Delivery: 15 days
#85

Mechanical labour charges for removal of old items and fitment of new spares parts

AS PER RFP

1 job Delivery: 15 days
#86

Bty cut off swtich

AS PER RFP

1 nos Delivery: 15 days
#87

Side indicator assy

AS PER RFP

2 nos Delivery: 15 days
#88

Reverse light switch

AS PER RFP

1 nos Delivery: 15 days
#89

Reverse light buzzer

AS PER RFP

1 nos Delivery: 15 days
#90

Headlight assy

AS PER RFP

1 nos Delivery: 15 days
#91

Headlight bulb

AS PER RFP

2 nos Delivery: 15 days
#92

Headliight holder

AS PER RFP

2 nos Delivery: 15 days
#93

Transfer case oil seal

AS PER RFP

2 nos Delivery: 15 days
#94

Transfer case flange lathe work

AS PER RFP

1 job Delivery: 15 days
#95

Transfer case flange washer and distance pipe

AS PER RFP

1 set Delivery: 15 days
#96

Transfer case check nut

AS PER RFP

1 nos Delivery: 15 days
#97

KM cable

AS PER RFP

1 set Delivery: 15 days
#98

Rear brake shoe liner with revitting

AS PER RFP

2 set Delivery: 15 days
#99

Brake adjustment rear wheel brake shoe operating car removal and refiting

AS PER RFP

1 job Delivery: 15 days
#100

Propeller shaft nut and bolt

AS PER RFP

4 nos Delivery: 15 days
#101

Insulation tape, sleeve, cups

AS PER RFP

1 set Delivery: 15 days
#102

Electric wire half roll

AS PER RFP

1 nos Delivery: 15 days
#103

Electrician labour charges for checking all broken wires replacement of bulbs and fuses

AS PER RFP

1 job Delivery: 15 days
#104

Mechanical labour charges for removal of old items and fitment of new spares parts

AS PER RFP

1 job Delivery: 15 days
#105

Front indicator assy

AS PER RFP

1 nos Delivery: 15 days
#106

Fog lamp bulb

AS PER RFP

2 nos Delivery: 15 days
#107

Reverse light buzzer

AS PER RFP

1 nos Delivery: 15 days
#108

Headlight assy

AS PER RFP

2 nos Delivery: 15 days
#109

Headlight bulb

AS PER RFP

2 nos Delivery: 15 days
#110

Headlight holder

AS PER RFP

2 nos Delivery: 15 days
#111

Clutch cylinder assy

AS PER RFP

1 nos Delivery: 15 days
#112

Steering gear box OH

AS PER RFP

1 job Delivery: 15 days
#113

Ignition switch

AS PER RFP

1 nos Delivery: 15 days
#114

Side indicator assy

AS PER RFP

2 nos Delivery: 15 days
#115

Hub axle packing

AS PER RFP

1 set Delivery: 15 days
#116

Hub Seal

AS PER RFP

2 nos Delivery: 15 days
#117

Door catch

AS PER RFP

2 nos Delivery: 15 days
#118

Pressure plate

AS PER RFP

1 nos Delivery: 15 days
#119

Clutch plate

AS PER RFP

1 nos Delivery: 15 days
#120

Release bearing

AS PER RFP

1 nos Delivery: 15 days
#121

Rear brake booster assy

AS PER RFP

2 nos Delivery: 15 days
#122

Insulation tape, sleeve, cups

AS PER RFP

1 set Delivery: 15 days
#123

Electric wire half roll

AS PER RFP

1 nos Delivery: 15 days
#124

Electrcian labour charges for checking all broken wires repalcement of bulbs and fuses

AS PER RFP

1 job Delivery: 15 days
#125

Mechanical labour charges for removal of old items and fitment of new spares parts

AS PER RFP

1 job Delivery: 15 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Certificate (Requested in ATC)

2

Additional Doc 1 (Requested in ATC)

3

Additional Doc 2 (Requested in ATC)

4

Additional Doc 3 (Requested in ATC)

5

Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

6

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Corrigendum Updates

1 Update
#1

Update

30-Mar-2026

Extended Deadline

02-Apr-2026, 2:00 pm

Opening Date

02-Apr-2026, 2:30 pm