Bid Publish Date
26-Jun-2026, 9:52 am
Bid End Date
06-Jul-2026, 10:00 am
Location
Progress
RAQuantity
7
Category
Bearing adaptor sleeve
Bid Type
Two Packet Bid
Indian Coast Guard has released a public tender for Bearing adaptor sleeve, Water Flow switch, Hydrolic Hose, Air eliminator repair kit, Wadding Filter Mesh, 2nd Stage Coalescer in SOUTH ANDAMAN, ANDAMAN & NICOBAR. Quantity: 7. Submission Deadline: 06-07-2026 10: 00: 00. Download documents and apply online.
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Bearing adaptor sleeve , Water Flow switch , Hydrolic Hose , Air eliminator repair kit , Wadding Filter Mesh , 2nd Stage Coalescer
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Bearing adaptor sleeve
Bearing adaptor sleeve SAK 305 BA
Water Flow switch
Water Flow switch WFS 1001 H
Hydrolic Hose
Hydrolic Hose 37 DEG flare female swivel
Air eliminator repair kit
Air eliminator repair kit
Wadding Filter Mesh
Wadding Filter Mesh
2nd Stage Coalescer
2nd Stage Coalescer
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Bearing adaptor sleeve | Bearing adaptor sleeve SAK 305 BA | 2 | pieces | dto14 | 120 | |
| 2 | Water Flow switch | Water Flow switch WFS 1001 H | 1 | pieces | dto14 | 120 | |
| 3 | Hydrolic Hose | Hydrolic Hose 37 DEG flare female swivel | 1 | pieces | dto14 | 120 | |
| 4 | Air eliminator repair kit | Air eliminator repair kit | 1 | pieces | dto14 | 120 | |
| 5 | Wadding Filter Mesh | Wadding Filter Mesh | 1 | pieces | dto14 | 120 | |
| 6 | 2nd Stage Coalescer | 2nd Stage Coalescer | 1 | pieces | dto14 | 120 |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Annual Turnover *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Start
17-Jul-2026, 2:00 pm
End
20-Jul-2026, 1:54 pm
Duration: 72 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS