Bid Publish Date
06-Mar-2026, 12:45 pm
Bid End Date
27-Mar-2026, 9:00 am
Location
Progress
RAQuantity
71
Category
REFILLING OF HFC 227EA GAS 1,1,1,2,3,3,3 HEPTA FLURO PROPANE, ZERO ODP, STORED PRESSURE, GAS
Bid Type
Two Packet Bid
Indian Navy has released a public tender for REFILLING OF HFC 227EA GAS 1, 1, 1, 2, 3, 3, 3 HEPTA FLURO PROPANE, ZERO ODP, STORED PRESSURE, GAS, CONVENTIONAL GAS RELEASE PANEL WITH BATTERY BACKUP AND CROSS ZONING FACILITY 2-ZONE WITH FIRE EXT AUTOMATIC MINI INTUITIVE FK-5-1-2 300GM SS SP RED 79 C WITH NRV, MS CONTAINER STRAP FOR MOUNTING AND FIXING THE AGENT CONTAINERS TO THE WALL, UL CONTAINER STRAP FOR MOUNTING AND FIXING THE AGENT CONTAINER TO THE WALL, VALVE ASSEMBLY AND ARRANGEMENT FOR SUPERVISORY SWITCH CONNECTION FOR MONITORING CYLINDER PRESSURE, A PRESSURE GAUGE WITH A SAFETY BURST DISC AND A SAFETY CAP 25 BAR, PRESSURE GAUGE CUM SWITCH FOR MONITORING THE CYLINDER PRESSURE 0-60 BAR, 22. 50 BAR SWITCH POINT PRESSURE SWITCH WASCO SWITCH POINT 5BAR 72. 5 PSIG IMP WITH FIRE EXT AUTOMATIC WM FK 5-1-12 4KG, HYDRO STATIC PRESSURE TEST 50 BAR, INVERTED BAKER TEST, HELIUM LEAK DETECTION TEST, EPOXY POWDER PAINTING, DISMANTLING, COMMISSIONING CHARGES, CONVENTIONAL OPTICAL SMOKE DETECTOR WITH DOUBLE DUST TRAP CHAMBER DESIGN, OPTIMIZED PERFORMANCE USING INTERNAL ALGORITHM, CENTRAL LED FOR 360 STATUS VISIBILITY, COMPILES TO EN 54-7 STANDARD, CONVENTIONAL RATE OF RISE HEAT DETECTOR, HEAT ALARM THRESHOLD TEMPERATURE 58 C CENTRAL LED FOR 360 STATUS VISIBILITY, COMPLIES TO EN 54-7 STANDARD AND APPROVED BY LPCB, VDS, INSTALLATION AND DELIVERY CHARGES in VISAKHAPATNAM, ANDHRA PRADESH. Quantity: 71. Submission Deadline: 27-03-2026 09: 00: 00. Download documents and apply online.
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
REFILLING OF HFC 227EA GAS 1,1,1,2,3,3,3 HEPTA FLURO PROPANE, ZERO ODP, STORED PRESSURE, GAS , CONVENTIONAL GAS RELEASE PANEL WITH BATTERY BACKUP AND CROSS ZONING FACILITY 2-ZONE WITH FIRE EXT AUTOMATIC MINI INTUITIVE FK-5-1-2 300GM SS SP RED 79 C WITH NRV , MS CONTAINER STRAP FOR MOUNTING AND FIXING THE AGENT CONTAINERS TO THE WALL , UL CONTAINER STRAP FOR MOUNTING AND FIXING THE AGENT CONTAINER TO THE WALL , VALVE ASSEMBLY AND ARRANGEMENT FOR SUPERVISORY SWITCH CONNECTION FOR MONITORING CYLINDER PRESSURE, A PRESSURE GAUGE WITH A SAFETY BURST DISC AND A SAFETY CAP 25 BAR , PRESSURE GAUGE CUM SWITCH FOR MONITORING THE CYLINDER PRESSURE 0-60 BAR, 22.50 BAR SWITCH POINT PRESSURE SWITCH WASCO SWITCH POINT 5BAR 72.5 PSIG IMP WITH FIRE EXT AUTOMATIC WM FK 5-1-12 4KG , HYDRO STATIC PRESSURE TEST 50 BAR, INVERTED BAKER TEST, HELIUM LEAK DETECTION TEST, EPOXY POWDER PAINTING, DISMANTLING, COMMISSIONING CHARGES , CONVENTIONAL OPTICAL SMOKE DETECTOR WITH DOUBLE DUST TRAP CHAMBER DESIGN, OPTIMIZED PERFORMANCE USING INTERNAL ALGORITHM, CENTRAL LED FOR 360 STATUS VISIBILITY, COMPILES TO EN 54-7 STANDARD , CONVENTIONAL RATE OF RISE HEAT DETECTOR, HEAT ALARM THRESHOLD TEMPERATURE 58 C CENTRAL LED FOR 360 STATUS VISIBILITY, COMPLIES TO EN 54-7 STANDARD AND APPROVED BY LPCB, VDS , INSTALLATION AND DELIVERY CHARGES
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
REFILLING OF HFC 227EA GAS 1,1,1,2,3,3,3 HEPTA FLURO PROPANE, ZERO ODP, STORED PRESSURE, GAS
REFILLING OF HFC 227EA GAS 1,1,1,2,3,3,3 HEPTA FLURO PROPANE, ZERO ODP, STORED PRESSURE, GAS
CONVENTIONAL GAS RELEASE PANEL WITH BATTERY BACKUP AND CROSS ZONING FACILITY 2-ZONE WITH FIRE EXT AUTOMATIC MINI INTUITIVE FK-5-1-2 300GM SS SP RED 79 C WITH NRV
CONVENTIONAL GAS RELEASE PANEL WITH BATTERY BACKUP AND CROSS ZONING FACILITY 2-ZONE WITH FIRE EXT AUTOMATIC MINI INTUITIVE FK-5-1-2 300GM SS SP RED 79 C WITH NRV
MS CONTAINER STRAP FOR MOUNTING AND FIXING THE AGENT CONTAINERS TO THE WALL
MS CONTAINER STRAP FOR MOUNTING AND FIXING THE AGENT CONTAINERS TO THE WALL
UL CONTAINER STRAP FOR MOUNTING AND FIXING THE AGENT CONTAINER TO THE WALL
UL CONTAINER STRAP FOR MOUNTING AND FIXING THE AGENT CONTAINER TO THE WALL
VALVE ASSEMBLY AND ARRANGEMENT FOR SUPERVISORY SWITCH CONNECTION FOR MONITORING CYLINDER PRESSURE, A PRESSURE GAUGE WITH A SAFETY BURST DISC AND A SAFETY CAP 25 BAR
VALVE ASSEMBLY AND ARRANGEMENT FOR SUPERVISORY SWITCH CONNECTION FOR MONITORING CYLINDER PRESSURE, A PRESSURE GAUGE WITH A SAFETY BURST DISC AND A SAFETY CAP 25 BAR
PRESSURE GAUGE CUM SWITCH FOR MONITORING THE CYLINDER PRESSURE 0-60 BAR, 22.50 BAR SWITCH POINT PRESSURE SWITCH WASCO SWITCH POINT 5BAR 72.5 PSIG IMP WITH FIRE EXT AUTOMATIC WM FK 5-1-12 4KG
PRESSURE GAUGE CUM SWITCH FOR MONITORING THE CYLINDER PRESSURE 0-60 BAR, 22.50 BAR SWITCH POINT PRESSURE SWITCH WASCO SWITCH POINT 5BAR 72.5 PSIG IMP WITH FIRE EXT AUTOMATIC WM FK 5-1-12 4KG
HYDRO STATIC PRESSURE TEST 50 BAR, INVERTED BAKER TEST, HELIUM LEAK DETECTION TEST, EPOXY POWDER PAINTING, DISMANTLING, COMMISSIONING CHARGES
HYDRO STATIC PRESSURE TEST 50 BAR, INVERTED BAKER TEST, HELIUM LEAK DETECTION TEST, EPOXY POWDER PAINTING, DISMANTLING, COMMISSIONING CHARGES
CONVENTIONAL OPTICAL SMOKE DETECTOR WITH DOUBLE DUST TRAP CHAMBER DESIGN, OPTIMIZED PERFORMANCE USING INTERNAL ALGORITHM, CENTRAL LED FOR 360 STATUS VISIBILITY, COMPILES TO EN 54-7 STANDARD
CONVENTIONAL OPTICAL SMOKE DETECTOR WITH DOUBLE DUST TRAP CHAMBER DESIGN, OPTIMIZED PERFORMANCE USING INTERNAL ALGORITHM, CENTRAL LED FOR 360 STATUS VISIBILITY, COMPILES TO EN 54-7 STANDARD
CONVENTIONAL RATE OF RISE HEAT DETECTOR, HEAT ALARM THRESHOLD TEMPERATURE 58 C CENTRAL LED FOR 360 STATUS VISIBILITY, COMPLIES TO EN 54-7 STANDARD AND APPROVED BY LPCB, VDS
CONVENTIONAL RATE OF RISE HEAT DETECTOR, HEAT ALARM THRESHOLD TEMPERATURE 58 C CENTRAL LED FOR 360 STATUS VISIBILITY, COMPLIES TO EN 54-7 STANDARD AND APPROVED BY LPCB, VDS
INSTALLATION AND DELIVERY CHARGES
INSTALLATION AND DELIVERY CHARGES
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | REFILLING OF HFC 227EA GAS 1,1,1,2,3,3,3 HEPTA FLURO PROPANE, ZERO ODP, STORED PRESSURE, GAS | REFILLING OF HFC 227EA GAS 1,1,1,2,3,3,3 HEPTA FLURO PROPANE, ZERO ODP, STORED PRESSURE, GAS | 60 | kg | mihir_sahoo1 | 90 | |
| 2 | CONVENTIONAL GAS RELEASE PANEL WITH BATTERY BACKUP AND CROSS ZONING FACILITY 2-ZONE WITH FIRE EXT AUTOMATIC MINI INTUITIVE FK-5-1-2 300GM SS SP RED 79 C WITH NRV | CONVENTIONAL GAS RELEASE PANEL WITH BATTERY BACKUP AND CROSS ZONING FACILITY 2-ZONE WITH FIRE EXT AUTOMATIC MINI INTUITIVE FK-5-1-2 300GM SS SP RED 79 C WITH NRV | 1 | nos | mihir_sahoo1 | 90 | |
| 3 | MS CONTAINER STRAP FOR MOUNTING AND FIXING THE AGENT CONTAINERS TO THE WALL | MS CONTAINER STRAP FOR MOUNTING AND FIXING THE AGENT CONTAINERS TO THE WALL | 2 | nos | mihir_sahoo1 | 90 | |
| 4 | UL CONTAINER STRAP FOR MOUNTING AND FIXING THE AGENT CONTAINER TO THE WALL | UL CONTAINER STRAP FOR MOUNTING AND FIXING THE AGENT CONTAINER TO THE WALL | 2 | nos | mihir_sahoo1 | 90 | |
| 5 | VALVE ASSEMBLY AND ARRANGEMENT FOR SUPERVISORY SWITCH CONNECTION FOR MONITORING CYLINDER PRESSURE, A PRESSURE GAUGE WITH A SAFETY BURST DISC AND A SAFETY CAP 25 BAR | VALVE ASSEMBLY AND ARRANGEMENT FOR SUPERVISORY SWITCH CONNECTION FOR MONITORING CYLINDER PRESSURE, A PRESSURE GAUGE WITH A SAFETY BURST DISC AND A SAFETY CAP 25 BAR | 1 | nos | mihir_sahoo1 | 90 | |
| 6 | PRESSURE GAUGE CUM SWITCH FOR MONITORING THE CYLINDER PRESSURE 0-60 BAR, 22.50 BAR SWITCH POINT PRESSURE SWITCH WASCO SWITCH POINT 5BAR 72.5 PSIG IMP WITH FIRE EXT AUTOMATIC WM FK 5-1-12 4KG | PRESSURE GAUGE CUM SWITCH FOR MONITORING THE CYLINDER PRESSURE 0-60 BAR, 22.50 BAR SWITCH POINT PRESSURE SWITCH WASCO SWITCH POINT 5BAR 72.5 PSIG IMP WITH FIRE EXT AUTOMATIC WM FK 5-1-12 4KG | 1 | nos | mihir_sahoo1 | 90 | |
| 7 | HYDRO STATIC PRESSURE TEST 50 BAR, INVERTED BAKER TEST, HELIUM LEAK DETECTION TEST, EPOXY POWDER PAINTING, DISMANTLING, COMMISSIONING CHARGES | HYDRO STATIC PRESSURE TEST 50 BAR, INVERTED BAKER TEST, HELIUM LEAK DETECTION TEST, EPOXY POWDER PAINTING, DISMANTLING, COMMISSIONING CHARGES | 1 | nos | mihir_sahoo1 | 90 | |
| 8 | CONVENTIONAL OPTICAL SMOKE DETECTOR WITH DOUBLE DUST TRAP CHAMBER DESIGN, OPTIMIZED PERFORMANCE USING INTERNAL ALGORITHM, CENTRAL LED FOR 360 STATUS VISIBILITY, COMPILES TO EN 54-7 STANDARD | CONVENTIONAL OPTICAL SMOKE DETECTOR WITH DOUBLE DUST TRAP CHAMBER DESIGN, OPTIMIZED PERFORMANCE USING INTERNAL ALGORITHM, CENTRAL LED FOR 360 STATUS VISIBILITY, COMPILES TO EN 54-7 STANDARD | 1 | nos | mihir_sahoo1 | 90 | |
| 9 | CONVENTIONAL RATE OF RISE HEAT DETECTOR, HEAT ALARM THRESHOLD TEMPERATURE 58 C CENTRAL LED FOR 360 STATUS VISIBILITY, COMPLIES TO EN 54-7 STANDARD AND APPROVED BY LPCB, VDS | CONVENTIONAL RATE OF RISE HEAT DETECTOR, HEAT ALARM THRESHOLD TEMPERATURE 58 C CENTRAL LED FOR 360 STATUS VISIBILITY, COMPLIES TO EN 54-7 STANDARD AND APPROVED BY LPCB, VDS | 1 | nos | mihir_sahoo1 | 90 | |
| 10 | INSTALLATION AND DELIVERY CHARGES | INSTALLATION AND DELIVERY CHARGES | 1 | job | mihir_sahoo1 | 90 |
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Start
25-Apr-2026, 1:00 pm
End
27-Apr-2026, 1:00 pm
Duration: 48 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | LAKSHMI SURYA TRADERS Under PMA | - | 26-03-2026 17:24:04 | |
| 2 | LALITHA ENTERPRISES Under PMA | - | 26-03-2026 07:47:23 | |
| 3 | RudV Technical Services Under PMA | - | 26-03-2026 20:30:52 | |
| 4 | SGS ENTERPRISES Under PMA | - | 26-03-2026 18:24:37 | |
| 5 | SHIVA SHAKTI ENTERPRISES Under PMA | - | 25-03-2026 20:52:33 | |
| 6 | SUPREMEX EQUIPMENTS Under PMA | - | 26-03-2026 19:32:07 |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | SGS ENTERPRISES(MSE,MII)( MSE Social Category:General ) Under PMA | Item Categories : REFILLING OF HFC 227EA GAS 1,1,1,2,3,3,3 HEPTA FLURO PROPANE, ZERO ODP, STORED PRESSURE, GAS,CONVEN | |
| L2 | RudV Technical Services (MSE,MII)( MSE Social Category:General ) Under PMA | Item Categories : REFILLING OF HFC 227EA GAS 1,1,1,2,3,3,3 HEPTA FLURO PROPANE, ZERO ODP, STORED PRESSURE, GAS,CONVEN | |
| L3 | LAKSHMI SURYA TRADERS (MSE,MII)( MSE Social Category:General ) Under PMA | Item Categories : REFILLING OF HFC 227EA GAS 1,1,1,2,3,3,3 HEPTA FLURO PROPANE, ZERO ODP, STORED PRESSURE, GAS,CONVEN |
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS