TenderDekho Logo
Active GEM

Uttar Pradesh Power Corporation Limited Repair & Installation Tender UP 2026 – Electrical Systems, SEMI TURNKEY

Bid Publish Date

24-Jul-2026, 12:38 pm

Bid End Date

03-Aug-2026, 3:00 pm

Value

₹5,00,000

Location

HAMIRPUR , UTTAR PRADESH

Progress

Issue24-Jul-2026, 12:38 pm
AwardPending
Explore all 6 tabs to view complete tender details

Quantity

1

Bid Type

Two Packet Bid

Key Highlights

  • Brand/OEM requirements: Not specified in available data
  • Technical certifications/standards: Not specified
  • Special clauses: ATC terms referenced in buyer uploaded document
  • Eligibility criteria: Experience in repair/maintenance/installation of electrical plant or systems implied
  • Warranty/AMC: Not specified
  • Penalties/Performance bonds: Not specified
  • Delivery/Installation: SEMI TURNKEY scope within Uttar Pradesh
  • Delivery location: Uttar Pradesh, India

Categories 3

Tender Overview

The Uttar Pradesh Power Corporation Limited (UPPCL) invites tenderers for the repair, maintenance, and installation of plant, systems and electrical equipment under a semi turnkey framework. Estimated value is ₹5,00,000. Location is Uttar Pradesh, with the scope covering electrical system installation and related services within the Energy Department of Uttar Pradesh. No BOQ items are listed, and the specific start/end dates are not disclosed. The procurement emphasizes repair and installation capabilities within an SEMI TURNKEY model, with involvement from the Energy Department. The ATC terms will govern participation and compliance.

Technical Specifications & Requirements

There are no explicit technical specifications in the provided data. Tender scope is described as repair, maintenance, and installation of plant/systems/equipment under a semi turnkey approach. Expected deliverables may include electrical system upkeep, installation work, and associated mechanical-electrical integration. Bidders should anticipate generic compliance checks, with emphasis on safety, installation quality, and timely commissioning per semi turnkey norms. Since no BOQ exists, readiness to scale to the project value of ₹5,00,000 and align to Uttar Pradesh regulations will be essential.

Terms & Eligibility

Key terms include an unspecified Earnest Money Deposit (EMD) amount, absence of listed start/end dates, and ATC documents referenced by the buyer. Bidders must comply with bidder-specific ATC terms, provide standard company credentials, and demonstrate capability for repair/maintenance/installation projects in a semi turnkey format. Ensure readiness to align with UP energy sector procurement norms and the Energy Department’s compliance expectations.

Key Specifications

  • Category: Repair, Maintenance, and Installation of Plant/Systems/Equipments (Version 2) - Commercial; Electrical System or Installation; SEMI TURNKEY

  • Estimated value: ₹5,00,000

  • BOQ: Total Items – 0 (no BOQ items available)

  • Location: Uttar Pradesh (Energy Department UP), India

  • Standards/certifications: Not specified in available data

  • Delivery scope: SEMI TURNKEY electrical system repair/installation inside UP

  • Experience: Implied capability in electrical system repair/installation within government procurement

Terms & Conditions

  • EMD amount is not specified in the provided tender data

  • ATC terms are referenced and must be reviewed in the uploaded document

  • Semi turnkey delivery model with electrical system repair/installation scope

Important Clauses

Payment Terms

Payment terms are governed by buyer ATC; exact percentages and milestones are defined in the ATC document uploaded by the buyer.

Delivery Schedule

Delivery and installation timelines will be defined in the ATC terms; bidders should expect project completion within the semi turnkey framework and must adhere to Uttar Pradesh procurement timelines.

Penalties/Liquidated Damages

Penalties, if any, and performance bonds will be specified in the ATC document; bidders should review for LD rates and security requirements.

Bidder Eligibility

  • Experience in repair, maintenance, and installation of electrical plant or systems

  • Demonstrated ability to perform semi turnkey electrical projects in government settings

  • Financial stability evidenced by recent financial statements and tax compliance

Additional Tender Data

Commercial Details

Tender Category

Service

Bid To RA

No

Bid To RA Enabled

No

Item Category

Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - Commercial; Electrical System or Installation; SEMI TURNKEY

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of service delivery acceptance certificate (SDAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Delivery Locations

1

Delivery Cities

Hamirpur

Delivery Pincodes

210301

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Gyan Chandra Yadav210301,Electricity Distribution Circle, 33/11 Aman Saheed HamirpurHamirpurUttar Pradesh210301Project / Lumpsum Based-Estimated Cost of Spare/Consumable s/Items on Reimbursement basis in Rs (please input 0 if not applicable) : 5

Authority Records

ENERGY DEPARTMENTUTTAR PRADESH POWER CORPORATION LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 9

GeM-Bidding-9655959.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST Registration Certificate

2

Permanent Account Number (PAN)

3

Experience certificates highlighting similar repair/maintenance/installation projects

4

Financial statements for the last 2–3 years

5

EMD/Security Deposit (as per ATC terms in supplier tender terms)

6

Technical bid documents demonstrating capability for electrical systems work

7

OEM authorizations or certifications (if applicable per ATC)

Frequently Asked Questions

How to bid in UPPCL repair and installation tender in Uttar Pradesh 2026?

Bidders should review the uploaded ATC terms, ensure GST registration and PAN validity, and prepare technical bids showing capability for repair/maintenance/installation of electrical systems. The estimated value is ₹5,00,000, and ATC governs submission, with SEMI TURNKEY scope in UP.

What documents are required for UPPCL electrical tender submission in UP?

Required documents typically include GST certificate, PAN, experience certificates for similar projects, last 2–3 years of financial statements, EMD as per ATC, and technical compliance documents. OEM authorizations may be needed if specified in ATC.

What are the technical specifications for the UP electrical tender in UP?

No explicit technical specifications are listed in the data. The scope includes repair, maintenance, and SEMI TURNKEY installation of electrical plant/systems. Bidders should anticipate standard safety and installation quality checks and be ready to demonstrate capability for integrated electrical work.

What is the EMD amount for the UP tender in Uttar Pradesh?

The EMD amount is not specified in the provided tender data; bidders must consult the uploaded ATC to determine the exact EMD or security deposit requirements and submit proof accordingly.

When is the delivery/completion deadline for the UP electrical project?

Delivery timelines are defined in the ATC document; the SEMI TURNKEY model implies staged commissioning. Bidders should verify the exact schedule in the ATC and align project plans to UP procurement timelines.

What eligibility criteria are required for the UPPCL tender bid?

Eligibility includes demonstrated experience in electrical repair/maintenance/installation, financial stability evidenced by recent statements, and compliance with GST/PAN requirements. OEMauthorizations may be required per ATC specifics.

What payment terms apply to this UP government supply contract?

Payment terms are defined by the ATC; bidders should expect milestone-based payments linked to delivery phases, with potential advance and final settlement as per the specified terms in the ATC.

How to access the ATC terms for the UP tender in UP 2026?

The ATC is uploaded in the buyer’s terms and conditions section. Bidders should download and review the ATC document to understand submission rules, EMD, compliance, and any brand or OEM requirements.