Bid Publish Date
10-Feb-2025, 10:34 pm
Bid End Date
05-Mar-2025, 11:00 am
EMD
₹58,200
Value
₹29,09,111
Location
Progress
Public procurement opportunity for Airports Authority Of India, rhq Nr - Rangpuri Operation and Maintenance of Airport Systems, Providing one number electric battery operated, 4Core 10 Sqmm Cable, 4Core 10 Sqmm end termination, Laying upto 35 Sq mm in existing pipe, Laying upto 35 Sq mm on wall, Wiring of 2 X 1 5 sq mm, Wiring of 2 X 2 5 sq mm, Wiring of 2 X 4 sq mm, Wiring of 4 X 4 sq mm in GHAZIABAD, UTTAR PRADESH. Quantity: 674 issued by. Submission Deadline: 05-03-2025 11: 00: 00. View full details and respond.
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | NEXPO POWER SOLUTIONS PRIVATE LIMITED Under PMA | - | 05-03-2025 10:57:55 | |
| 2 | S. N. ELECTRIC & MAINTENANCE PRIVATE LIMITED Under PMA | - | 03-03-2025 17:52:48 | |
| 3 | VIHAWK TECH SOLUTIONS PRIVATE LIMITED Under PMA | - | 04-03-2025 10:33:47 |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | NEXPO POWER SOLUTIONS PRIVATE LIMITED(MII) Under PMA | Item Categories : Operation and Maintenance of Airport Systems,Providing one number electric battery operated,4Core 1 | |
| L2 | S. N. ELECTRIC & MAINTENANCE PRIVATE LIMITED (MSE,MII)( MSE Social Category:General ) Under PMA | Item Categories : Operation and Maintenance of Airport Systems,Providing one number electric battery operated,4Core 1 | |
| L3 | VIHAWK TECH SOLUTIONS PRIVATE LIMITED (MSE,MII)( MSE Social Category:General ) Under PMA | Item Categories : Operation and Maintenance of Airport Systems,Providing one number electric battery operated,4Core 1 |
Quantity
674
Bid Type
Two Packet Bid
Bid Validity
90 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
4 Days
Min. Avg. Annual Turnover
9
OEM Avg. Turnover
9
Past Performance
80 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Operation and Maintenance of Airport Systems , Providing one number electric battery operated , 4Core 10 Sqmm Cable , 4Core 10 Sqmm end termination , Laying upto 35 Sq mm in existing pipe , Laying upto 35 Sq mm on wall , Wiring of 2 X 1 5 sq mm , Wiring of 2 X 2 5 sq mm , Wiring of 2 X 4 sq mm , Wiring of 4 X 4 sq mm
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
OTHER
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC)
Additional Doc 3 (Requested in ATC)
Additional Doc 4 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Key insights about UTTAR PRADESH tender market
The qualification requirements include being a registered entity, fulfilling the experience criteria, and proving the minimum average annual turnover of ₹9 Lakh. Additionally, bidders must submit various certificates, including an OEM Authorization Certificate, to validate their capabilities.
Bidders are required to submit various documents such as Experience Criteria, Past Performance documentation, a Bidder Turnover Certificate, and an OEM Authorization Certificate. It’s crucial to check the tender documents for any other additional requirements and ensure compliance to avoid disqualification.
To ensure compliance with the technical specifications, bidders must thoroughly review the specifications laid out in the tender documents and confirm that their equipment and procedures meet all outlined standards and requirements. Communication with the issuing authority can also clarify any uncertainties.
The Earnest Money Deposit (EMD) required for this tender is ₹58,200. Performance security may also be required from the successful bidder, as specified in the tender documents, to ensure contract compliance and project deliverables.
Bidders must submit their documents electronically as specified in the tender documentation. Ensure that all files are in the accepted formats and submitted within the deadlines outlined in the tender details to avoid any disqualification.
These FAQs aim to guide potential bidders through the essential aspects of the tender, ensuring clarity and compliance throughout the bidding process.