Contract Bidding Open For Grid Ceiling,Gypsum Ceiling,Wooden Laminate False Ceiling,Resilient Vinyl Flooring,70mm Thick Parti in INDORE, MADHYA PRADESH

Bid Publish Date

20-Jan-2026, 4:19 pm

Bid End Date

16-Feb-2026, 9:00 am

EMD

₹2,40,000

Generate Docs

Progress

Issue20-Jan-2026, 4:19 pm
Technical15-02-2026 17:05:18
Financial
Award12-Mar-2026, 4:15 am
Explore all 4 tabs to view complete tender details

Quantity

32196

Category

Executive Table 1500

Bid Type

Two Packet Bid

Categories 156

SPECTROSCOPIC EQUIPMENT PVC PIPE AD FILM APPARELS UG CABLE ALTERATION OF BUILDING ANGLE DIGITAL CROSS CONNECT BATHROOM SET ALTERATION BARITONE HORNS SAFETY GADGET NETWORKING RACK PAINTING INTERIOR UPS EARTH WIRE WALLPAPER POWER CABLE CABBING EQUIPMENTS COMPRESSOR MULTI SERVICE SWITCH AIR CONDITIONER SPARE ANALOG PHONE AIR COOLED ENGINE ELECTRICAL PRODUCTS CABLE LADDER CAMERA WIRING ASSEMBLY CONTRACT OF TRANSPORTATION AMPS ELECTROCARDIOGRAPHY UNITS CHANNEL CANVASES AND FILMS AND BOARDS GEYSER ACRYLIC PAINTS RENEWAL OF BLDG DISTEMPER SAFETY AND SECURITY EQUIPMENT PVC FLOORING DISCRETE COMPONENTS SECURITY CAMERAS XLPE CABLE STEEL WIRE PIPING FALSE CELING RF CABLE CLOTHING INSTRUMENTATION CABLE GI WIRE ACCUMULATOR BLADDERS ELECTRICAL BOXES ELECTRICAL SUBSTATION IP PHONE WATER PIPE LINE WATER CONDUCTOR SYSTEM FIRE WATER LINE WATER SUPPLY PANEL STOMACHERS SUPPLY OF CERAMIC TILE TRANSPORTATION SWITCH PORT CABLING SOCKET SURVEILLANCE EQUIPMENTS POWER NETWORKING COMPONENT REFRIGERATION SYSTEM JUMPER WIRE BRACKET AC PIPES AIR EXHAUSTER COMPUTER ACCESSORIES FLEXIBLE CABLE HIGH TENSION PANEL LED LUMINARIES ATM GLASSWARE LOCAL AREA NETWORK CABLING SWITCH GEAR TUBE LIGHT AIR CONDITIONER SOLAR CELLS FITMENT CABLE TERMINAL BIDET ELECTRODES PVC CABLE SHIELDED CABLE VIDEO MONITORS FALL PROTECTION LANYARD CCTV SYSTEM FIRE ALARM PANEL GL WIRE PNEUMATIC IT EQUIPMENT PRESSURE GAUGE SMOKE DETECTORS CIVIL WORK PARTITIONS NETWORKING POWER WIRE CONSTRUCTION OF FLOORING SPORT VEHICLE SOLAR PHOTOVOLTAIC MODULE TUBE PORT REFRIGERANT GAS PBX SCBA BOX VDC FLOORING WIRE PROVISION OF CERAMIC TILE SOLAR PV PROJECT VIDEO TRACKING SYSTEM CAT NETWORKING EQUIPMENTS EMULSION PAINT COMMUNICATION PROTOCOL SOLAR PHOTOVOLTAIC SYSTEM TUBES AND PIPES GALVANIZED WIRE REPAIR OF FLOORING CITY SURVEILLANCE BARE CABLE GAS BURNERS MESH LIGHTING ANGLE COCK CORE CUTTING TRANSITION METALS CABLE FIRE BREATHING APPARATUS WEB CAMERA FLAME DETECTORS AMP SWITCH BATHROOM REPAIR CONSTRUCTION DEMOLITION VALVE PARTS AND ACCESSORIES ESCRAP GYPSUM BOARD FLUSH DOOR DETECTOR CPVC PIPE PEB CABLE TRAY FAN FIRE FIGHTING EQUIPMENT MINERAL CONTAINER SEAT VALVE JACK AUDIO VISUAL ACCESSORY PAINTING MATERIAL

N/a has released a public tender for Grid Ceiling, Gypsum Ceiling, Wooden Laminate False Ceiling, Resilient Vinyl Flooring, 70mm Thick Parti in INDORE, MADHYA PRADESH. Quantity: 32196. Submission Deadline: 16-02-2026 09: 00: 00. Download documents and apply online.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Authority Records

TRANSPORT DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-8849660.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 199 Items Sign in for GEM prices

#1

Grid Ceiling

Grid Ceiling

310 sqm Delivery: 60 days
#2

Gypsum Ceiling

Gypsum Ceiling

210 sqm Delivery: 60 days
#3

Wooden Laminate False Ceiling

Wooden Laminate False Ceiling

10 sqm Delivery: 60 days
#4

Resilient Vinyl Flooring

Resilient Vinyl Flooring

515 sqm Delivery: 60 days
#5

70mm Thick Partition

70mm Thick Partition

95 sqm Delivery: 60 days
#6

Frameless Toughened Glass Partition

Frameless Toughened Glass Partition

35 sqm Delivery: 60 days
#7

Existing Door Refurbishment

Existing Door Refurbishment

5 sqm Delivery: 60 days
#8

Frameless Toughened Glass Door

Frameless Toughened Glass Door

21 sqm Delivery: 60 days
#9

Flush Door

Flush Door

5 sqm Delivery: 60 days
#10

Teak or Rubber Wood Skirting

Teak or Rubber Wood Skirting

50 rmt Delivery: 60 days
#11

Teak or Rubber Wood Beading

Teak or Rubber Wood Beading

50 rmt Delivery: 60 days
#12

Venetian Translucent Blinds

Venetian Translucent Blinds

25 sqm Delivery: 60 days
#13

Acrylic Emulsion Paint

Acrylic Emulsion Paint

1,000 sqm Delivery: 60 days
#14

Vinyl Coated Wallpaper

Vinyl Coated Wallpaper

15 sqm Delivery: 60 days
#15

Dismantling of Existing Partition or Ceiling

Dismantling of Existing Partition or Ceiling

1 nos Delivery: 60 days
#16

Grid Frame Replacement

Grid Frame Replacement

50 sqm Delivery: 60 days
#17

Gypsum Board Replacement

Gypsum Board Replacement

25 sqm Delivery: 60 days
#18

Mineral Fiber Tile Replacement

Mineral Fiber Tile Replacement

25 sqm Delivery: 60 days
#19

Executive Table 1500

Executive Table 1500

24 nos Delivery: 60 days
#20

Mesh Hi Back Chair

Mesh Hi Back Chair

24 nos Delivery: 60 days
#21

Mesh Mid Back Chair

Mesh Mid Back Chair

48 nos Delivery: 60 days
#22

Wooden Storage

Wooden Storage

44 nos Delivery: 60 days
#23

Both Side Table

Both Side Table

24 nos Delivery: 60 days
#24

Single Side Table

Single Side Table

6 nos Delivery: 60 days
#25

Task Chair

Task Chair

157 nos Delivery: 60 days
#26

Tile Base Partition

Tile Base Partition

70 sqm Delivery: 60 days
#27

Printer Table

Printer Table

1 nos Delivery: 60 days
#28

3 Seater Work Station

3 Seater Work Station

6 nos Delivery: 60 days
#29

4 Seater Work Station

4 Seater Work Station

6 nos Delivery: 60 days
#30

Light Exhaust Fan and Wall Fan Point

Light Exhaust Fan and Wall Fan Point

200 nos Delivery: 60 days
#31

Fan Point with Step Regulator

Fan Point with Step Regulator

40 nos Delivery: 60 days
#32

2 Lights Controlled by 6 Amp Switch

2 Lights Controlled by 6 Amp Switch

10 nos Delivery: 60 days
#33

3 Lights Controlled by 6A Switch

3 Lights Controlled by 6A Switch

10 nos Delivery: 60 days
#34

Bell or Buzzer Point including Buzzer Board

Bell or Buzzer Point including Buzzer Board

10 nos Delivery: 60 days
#35

25mm PVC HMS Conduit

25mm PVC HMS Conduit

2,500 mtr Delivery: 60 days
#36

32mm PVC HMS Conduit

32mm PVC HMS Conduit

100 mtr Delivery: 60 days
#37

1.5 sqmm Phase and Neutral with Earth Wire

1.5 sqmm Phase and Neutral with Earth Wire

1,000 mtr Delivery: 60 days
#38

2.5 sqmm Phase and Neutral with Earth Wire

2.5 sqmm Phase and Neutral with Earth Wire

2,750 mtr Delivery: 60 days
#39

4 sqmm Phase and Neutral with 2.5 sqmm Earth Wire

4 sqmm Phase and Neutral with 2.5 sqmm Earth Wire

200 mtr Delivery: 60 days
#40

6A Switch and Socket Outlet

6A Switch and Socket Outlet

30 nos Delivery: 60 days
#41

16A Switch and 3 nos 6A Sockets for Workstations

16A Switch and 3 nos 6A Sockets for Workstations

135 nos Delivery: 60 days
#42

16A Single Phase Switch and Socket

16A Single Phase Switch and Socket

60 nos Delivery: 60 days
#43

20A Industrial Socket with Pin Top and SP MCB

20A Industrial Socket with Pin Top and SP MCB

1 nos Delivery: 60 days
#44

63A 4 Pole MCB in Metal Box

63A 4 Pole MCB in Metal Box

1 nos Delivery: 60 days
#45

3.5c x 95 Sq mm ALAR XLPE Cable

3.5c x 95 Sq mm ALAR XLPE Cable

15 mtr Delivery: 60 days
#46

3.5c x 50 Sq mm ALAR XLPE Cable

3.5c x 50 Sq mm ALAR XLPE Cable

15 mtr Delivery: 60 days
#47

3.5c x 35 Sq mm ALAR XLPE Cable

3.5c x 35 Sq mm ALAR XLPE Cable

15 mtr Delivery: 60 days
#48

4c x 16 Sq mm ALAR XLPE Cable

4c x 16 Sq mm ALAR XLPE Cable

20 mtr Delivery: 60 days
#49

4c x 10 Sq mm ALAR XLPE Cable

4c x 10 Sq mm ALAR XLPE Cable

20 mtr Delivery: 60 days
#50

4c x 16 Sq mm CUAR XLPE Cable

4c x 16 Sq mm CUAR XLPE Cable

50 mtr Delivery: 60 days
#51

4c x 25 Sq mm CUAR XLPE Cable

4c x 25 Sq mm CUAR XLPE Cable

50 mtr Delivery: 60 days
#52

4c x 2.5 Sq mm CUAR XLPE Cable

4c x 2.5 Sq mm CUAR XLPE Cable

50 mtr Delivery: 60 days
#53

Termination of 3.5c x 95 Sq mm ALAR XLPE Cable

Termination of 3.5c x 95 Sq mm ALAR XLPE Cable

2 set Delivery: 60 days
#54

Termination of 3.5c x 50 Sq mm ALAR XLPE Cable

Termination of 3.5c x 50 Sq mm ALAR XLPE Cable

2 set Delivery: 60 days
#55

Termination of 3.5c x 35 Sq mm ALAR XLPE Cable

Termination of 3.5c x 35 Sq mm ALAR XLPE Cable

2 set Delivery: 60 days
#56

Termination of 4c x 16 Sq mm ALAR XLPE Cable

Termination of 4c x 16 Sq mm ALAR XLPE Cable

8 set Delivery: 60 days
#57

Termination of 4c x 10 Sq mm ALAR XLPE Cable

Termination of 4c x 10 Sq mm ALAR XLPE Cable

8 set Delivery: 60 days
#58

Termination of 4c x 16 Sq mm CUAR XLPE Cable

Termination of 4c x 16 Sq mm CUAR XLPE Cable

4 set Delivery: 60 days
#59

Termination of 4c x 25 Sq mm CUAR XLPE Cable

Termination of 4c x 25 Sq mm CUAR XLPE Cable

4 set Delivery: 60 days
#60

Termination of 4c x 2.5 Sq mm CUAR XLPE Cable

Termination of 4c x 2.5 Sq mm CUAR XLPE Cable

4 set Delivery: 60 days
#61

Termination of 16 sqmm Copper Flexible Cable

Termination of 16 sqmm Copper Flexible Cable

24 set Delivery: 60 days
#62

Termination of 25 sqmm Copper Flexible Cable

Termination of 25 sqmm Copper Flexible Cable

24 set Delivery: 60 days
#63

100 mm GI Raceway

100 mm GI Raceway

50 mtr Delivery: 60 days
#64

150 mm GI Raceway

150 mm GI Raceway

50 mtr Delivery: 60 days
#65

300 mm GI Raceway

300 mm GI Raceway

20 mtr Delivery: 60 days
#66

Fabrications for Cable Tray Support

Fabrications for Cable Tray Support

100 kg Delivery: 60 days
#67

900mm Linear Suspended 15 Watt LED

900mm Linear Suspended 15 Watt LED

2 nos Delivery: 60 days
#68

1200mm Linear Suspended 20 Watt LED

1200mm Linear Suspended 20 Watt LED

2 nos Delivery: 60 days
#69

8FT Linear Suspended 40 Watt LED

8FT Linear Suspended 40 Watt LED

1 nos Delivery: 60 days
#70

120 Degree Axeon V Connector

120 Degree Axeon V Connector

1 nos Delivery: 60 days
#71

120 Degree Axeon Y Connector

120 Degree Axeon Y Connector

1 nos Delivery: 60 days
#72

1.0m Suspension for RCC Ceiling

1.0m Suspension for RCC Ceiling

100 nos Delivery: 60 days
#73

Trim LED Tube Light 4Ft

Trim LED Tube Light 4Ft

10 nos Delivery: 60 days
#74

Trim LED Tube Light 2Ft

Trim LED Tube Light 2Ft

5 nos Delivery: 60 days
#75

2x2 LED Fitting 32 to 36 Watt

2x2 LED Fitting 32 to 36 Watt

50 nos Delivery: 60 days
#76

Down Light Fitting 12 to 15 Watt LED

Down Light Fitting 12 to 15 Watt LED

50 nos Delivery: 60 days
#77

Recess Mounted Spot Light 1 to 3 Watt

Recess Mounted Spot Light 1 to 3 Watt

5 nos Delivery: 60 days
#78

LED Rope Light 5 Watt per Meter

LED Rope Light 5 Watt per Meter

25 mtr Delivery: 60 days
#79

Wall Fan 16 Inch

Wall Fan 16 Inch

20 nos Delivery: 60 days
#80

250mm Exhaust Fan with Louvers

250mm Exhaust Fan with Louvers

18 nos Delivery: 60 days
#81

Ceiling Fan Sweep 1200mm

Ceiling Fan Sweep 1200mm

2 nos Delivery: 60 days
#82

80mm Dia GI Electrode 3 Meter Long

80mm Dia GI Electrode 3 Meter Long

2 nos Delivery: 60 days
#83

8G GI Wire

8G GI Wire

100 mtr Delivery: 60 days
#84

10 sqmm Copper Flexible Cable

10 sqmm Copper Flexible Cable

100 mtr Delivery: 60 days
#85

16 sqmm Copper Flexible Cable

16 sqmm Copper Flexible Cable

50 mtr Delivery: 60 days
#86

Main Lighting and Power 12 Way VTPN DB

Main Lighting and Power 12 Way VTPN DB

1 nos Delivery: 60 days
#87

8 Way ETPN DB

8 Way ETPN DB

1 nos Delivery: 60 days
#88

4 Way ETPN DB

4 Way ETPN DB

1 nos Delivery: 60 days
#89

UPS IN OUT DB 63 Amps 4 Pole

UPS IN OUT DB 63 Amps 4 Pole

1 nos Delivery: 60 days
#90

IP 66 Enclosure for AC Outdoor Units

IP 66 Enclosure for AC Outdoor Units

3 nos Delivery: 60 days
#91

4 Pair Cat 6 Shielded Computer Cable

4 Pair Cat 6 Shielded Computer Cable

1,700 mtr Delivery: 60 days
#92

Tag Block 100 Pair

Tag Block 100 Pair

1 nos Delivery: 60 days
#93

Tag Block 20 Pair

Tag Block 20 Pair

1 nos Delivery: 60 days
#94

50 Pair Armoured PVC Cable

50 Pair Armoured PVC Cable

50 mtr Delivery: 60 days
#95

Telephone Outlet Box with Top Plate

Telephone Outlet Box with Top Plate

70 nos Delivery: 60 days
#96

IP PBX System Cloud Based

IP PBX System Cloud Based

1 each Delivery: 60 days
#97

Standard Phone

Standard Phone

65 each Delivery: 60 days
#98

Executive Phone

Executive Phone

5 each Delivery: 60 days
#99

IP Phone

IP Phone

1 each Delivery: 60 days
#100

Krone Connector 60 Pairs

Krone Connector 60 Pairs

1 each Delivery: 60 days
#101

Cat 6 Computer Cable FR

Cat 6 Computer Cable FR

3,500 mtr Delivery: 60 days
#102

RJ45 Computer Jack Cat6 Modular

RJ45 Computer Jack Cat6 Modular

140 each Delivery: 60 days
#103

42U Rack with Accessories

42U Rack with Accessories

1 each Delivery: 60 days
#104

12U Rack with Accessories

12U Rack with Accessories

1 each Delivery: 60 days
#105

Patch Panel

Patch Panel

3 each Delivery: 60 days
#106

Network Switch 24 Port

Network Switch 24 Port

3 each Delivery: 60 days
#107

Patch Cord 2 Meter

Patch Cord 2 Meter

50 each Delivery: 60 days
#108

Patch Cord 1 Meter

Patch Cord 1 Meter

50 each Delivery: 60 days
#109

Existing Smoke Detector Removing and Installation

Existing Smoke Detector Removing and Installation

30 nos Delivery: 60 days
#110

HDMI Cable 15 Meter

HDMI Cable 15 Meter

2 nos Delivery: 60 days
#111

HDMI Cable 20 Meter

HDMI Cable 20 Meter

2 nos Delivery: 60 days
#112

4MP IP Fixed Rugged Dome Camera

4MP IP Fixed Rugged Dome Camera

1 each Delivery: 60 days
#113

32 Channel NVR with 4 SATA

32 Channel NVR with 4 SATA

1 each Delivery: 60 days
#114

24 Port POE Switch with 4 SFP Ports

24 Port POE Switch with 4 SFP Ports

1 each Delivery: 60 days
#115

32 Inch Flat Screen HD LED Monitor

32 Inch Flat Screen HD LED Monitor

1 each Delivery: 60 days
#116

4 TB Surveillance Hard Disk

4 TB Surveillance Hard Disk

1 each Delivery: 60 days
#117

12U Network Rack with Accessories

12U Network Rack with Accessories

1 each Delivery: 60 days
#118

24 Port Loaded Patch Panel

24 Port Loaded Patch Panel

1 each Delivery: 60 days
#119

5 Meter HDMI Cable

5 Meter HDMI Cable

1 each Delivery: 60 days
#120

3 Meter HDMI Cable

3 Meter HDMI Cable

1 each Delivery: 60 days
#121

1 Meter Patch Cord

1 Meter Patch Cord

12 each Delivery: 60 days
#122

PVC Square Junction Box for CCTV

PVC Square Junction Box for CCTV

12 each Delivery: 60 days
#123

Media Converter

Media Converter

4 each Delivery: 60 days
#124

6 KVA Double Conversion Online UPS

6 KVA Double Conversion Online UPS

1 nos Delivery: 60 days
#125

Floor Popup Boxes 8 Module

Floor Popup Boxes 8 Module

10 nos Delivery: 60 days
#126

Removing of Old Conduit

Removing of Old Conduit

2,900 mtr Delivery: 60 days
#127

Removing of Old Light Point Wiring

Removing of Old Light Point Wiring

5,000 mtr Delivery: 60 days
#128

Removing of Old Circuit Wiring

Removing of Old Circuit Wiring

4,000 mtr Delivery: 60 days
#129

Removing of Old Switch Sockets RJ11 and RJ45

Removing of Old Switch Sockets RJ11 and RJ45

100 nos Delivery: 60 days
#130

Removing of Cat 6 Cable

Removing of Cat 6 Cable

1,000 mtr Delivery: 60 days
#131

Removing and Shifting of Fire Alarm Panel and Smoke Detectors

Removing and Shifting of Fire Alarm Panel and Smoke Detectors

1 ls Delivery: 60 days
#132

Removing of Old 6 Way or 8 Way DB

Removing of Old 6 Way or 8 Way DB

11 nos Delivery: 60 days
#133

Removing of 2x2 and Linear Light Fixtures

Removing of 2x2 and Linear Light Fixtures

70 nos Delivery: 60 days
#134

Installation and Testing of Old Light Fixtures

Installation and Testing of Old Light Fixtures

70 nos Delivery: 60 days
#135

Installation and Testing of Old Power DBs

Installation and Testing of Old Power DBs

11 nos Delivery: 60 days
#136

Removing of Old Power Cables

Removing of Old Power Cables

100 mtr Delivery: 60 days
#137

Removing and Shifting of Old Networking Rack

Removing and Shifting of Old Networking Rack

2 nos Delivery: 60 days
#138

20 HP Cooling Only VRF Unit

20 HP Cooling Only VRF Unit

2 nos Delivery: 60 days
#139

4 TR Round Cassette Unit

4 TR Round Cassette Unit

6 nos Delivery: 60 days
#140

0.8 TR 1 Way Cassette Unit Wind Free

0.8 TR 1 Way Cassette Unit Wind Free

9 nos Delivery: 60 days
#141

1.0 TR 1 Way Cassette Unit Wind Free

1.0 TR 1 Way Cassette Unit Wind Free

2 nos Delivery: 60 days
#142

1.56 TR 1 Way Cassette Unit Wind Free

1.56 TR 1 Way Cassette Unit Wind Free

1 nos Delivery: 60 days
#143

2.0 TR 1 Way Cassette Unit Wind Free

2.0 TR 1 Way Cassette Unit Wind Free

1 nos Delivery: 60 days
#144

Cordless Remote Controller

Cordless Remote Controller

13 nos Delivery: 60 days
#145

Cordless Remote Controller for Round Cassette

Cordless Remote Controller for Round Cassette

6 nos Delivery: 60 days
#146

Y Joints

Y Joints

18 nos Delivery: 60 days
#147

T Joints

T Joints

1 nos Delivery: 60 days
#148

Installation of 20 HP Outdoor Unit

Installation of 20 HP Outdoor Unit

2 nos Delivery: 60 days
#149

Installation of 4 TR Round Cassette Unit

Installation of 4 TR Round Cassette Unit

6 nos Delivery: 60 days
#150

Installation of 0.8 TR 1 Way Cassette Unit Wind Free

Installation of 0.8 TR 1 Way Cassette Unit Wind Free

9 nos Delivery: 60 days
#151

Installation of 1.0 TR 1 Way Cassette Unit Wind Free

Installation of 1.0 TR 1 Way Cassette Unit Wind Free

2 nos Delivery: 60 days
#152

Installation of 1.56 TR 1 Way Cassette Unit Wind Free

Installation of 1.56 TR 1 Way Cassette Unit Wind Free

1 nos Delivery: 60 days
#153

Installation of 2.0 TR 1 Way Cassette Unit Wind Free

Installation of 2.0 TR 1 Way Cassette Unit Wind Free

1 nos Delivery: 60 days
#154

Copper Piping with Nitrile Rubber Insulation

Copper Piping with Nitrile Rubber Insulation

158 rmt Delivery: 60 days
#155

Main Copper Piping for Outdoor to Y Joint

Main Copper Piping for Outdoor to Y Joint

22 rmt Delivery: 60 days
#156

Control and Transmission Cabling 2 Core 1 sqmm

Control and Transmission Cabling 2 Core 1 sqmm

270 rmt Delivery: 60 days
#157

uPVC Insulated Drain Piping 25 mm

uPVC Insulated Drain Piping 25 mm

127 rmt Delivery: 60 days
#158

GI Cable Tray for Copper Piping and Cables

GI Cable Tray for Copper Piping and Cables

180 rmt Delivery: 60 days
#159

Refrigerant Gas Topping

Refrigerant Gas Topping

2 nos Delivery: 60 days
#160

Lifting of Units to Site

Lifting of Units to Site

2 nos Delivery: 60 days
#161

MS Stand for Outdoor Unit Floor Mounted

MS Stand for Outdoor Unit Floor Mounted

2 nos Delivery: 60 days
#162

Freight and Transportation

Freight and Transportation

1 lot Delivery: 60 days
#163

Drier Filter

Drier Filter

2 nos Delivery: 60 days
#164

Core Cutting in RCC or Wall

Core Cutting in RCC or Wall

15 nos Delivery: 60 days
#165

Minor Civil Work for AC

Minor Civil Work for AC

1 nos Delivery: 60 days
#166

Nitrogen Pressure Testing and Recommissioning 30 HP ODU

Nitrogen Pressure Testing and Recommissioning 30 HP ODU

1 nos Delivery: 60 days
#167

Dismantling and Installation of Round Cassette Unit 4 TR

Dismantling and Installation of Round Cassette Unit 4 TR

6 nos Delivery: 60 days
#168

Old VRF Copper Piping Modification

Old VRF Copper Piping Modification

10 rmt Delivery: 60 days
#169

Old VRF Control Cabling Modification

Old VRF Control Cabling Modification

15 rmt Delivery: 60 days
#170

Old VRF Drain Piping Modification

Old VRF Drain Piping Modification

8 rmt Delivery: 60 days
#171

Old VRF GI Cable Tray Work

Old VRF GI Cable Tray Work

10 rmt Delivery: 60 days
#172

Old VRF Gas Topping

Old VRF Gas Topping

1 nos Delivery: 60 days
#173

Installation of Split AC

Installation of Split AC

6 nos Delivery: 60 days
#174

Dismantling of Split AC

Dismantling of Split AC

6 nos Delivery: 60 days
#175

Installation of Cassette AC

Installation of Cassette AC

5 nos Delivery: 60 days
#176

Dismantling of Cassette AC

Dismantling of Cassette AC

5 nos Delivery: 60 days
#177

Copper Piping with Insulation 1.0 to 1.5 TR

Copper Piping with Insulation 1.0 to 1.5 TR

150 ft Delivery: 60 days
#178

Copper Piping with Insulation 2.0 TR

Copper Piping with Insulation 2.0 TR

150 ft Delivery: 60 days
#179

Copper Piping with Insulation 3.0 to 4.0 TR

Copper Piping with Insulation 3.0 to 4.0 TR

150 ft Delivery: 60 days
#180

4 Core 2.5 sqmm Cable Indoor to Outdoor

4 Core 2.5 sqmm Cable Indoor to Outdoor

450 ft Delivery: 60 days
#181

Hard uPVC Drain Piping for Split or Cassette

Hard uPVC Drain Piping for Split or Cassette

225 ft Delivery: 60 days
#182

Outdoor Unit Stand for 1.0 to 2.0 TR

Outdoor Unit Stand for 1.0 to 2.0 TR

5 nos Delivery: 60 days
#183

Outdoor Unit Stand for 3.0 to 4.0 TR

Outdoor Unit Stand for 3.0 to 4.0 TR

4 nos Delivery: 60 days
#184

Jhiri and Minor Civil Work

Jhiri and Minor Civil Work

1 lot Delivery: 60 days
#185

RCC Demolition and Disposal

RCC Demolition and Disposal

5 cum Delivery: 60 days
#186

Nano Coated Wall Hung Water Closet

Nano Coated Wall Hung Water Closet

1 each Delivery: 60 days
#187

Fluoro Polymer Coated Wash Basin with Auto Cock

Fluoro Polymer Coated Wash Basin with Auto Cock

1 each Delivery: 60 days
#188

Fluoro Polymer Coated Urinal

Fluoro Polymer Coated Urinal

1 each Delivery: 60 days
#189

Health Faucet with Flexible Tube and Bracket

Health Faucet with Flexible Tube and Bracket

1 each Delivery: 60 days
#190

CP Brass Two Way Angle Cock

CP Brass Two Way Angle Cock

3 each Delivery: 60 days
#191

Floor and Wall Tile Dismantling

Floor and Wall Tile Dismantling

5 sqm Delivery: 60 days
#192

Vitrified Floor Tiles 800x800mm

Vitrified Floor Tiles 800x800mm

5 sqm Delivery: 60 days
#193

Vitrified Floor Tiles 800x1200mm

Vitrified Floor Tiles 800x1200mm

30 sqm Delivery: 60 days
#194

CP Brass Soap Container with Bracket

CP Brass Soap Container with Bracket

1 each Delivery: 60 days
#195

Single Lever Shower Mixing Diverter

Single Lever Shower Mixing Diverter

1 each Delivery: 60 days
#196

20mm Diameter CPVC Pipe

20mm Diameter CPVC Pipe

20 mtr Delivery: 60 days
#197

25mm Diameter CPVC Pipe

25mm Diameter CPVC Pipe

20 mtr Delivery: 60 days
#198

32mm Diameter CPVC Pipe

32mm Diameter CPVC Pipe

20 mtr Delivery: 60 days
#199

Rigid PVC Waste Pipe 110mm

Rigid PVC Waste Pipe 110mm

30 mtr Delivery: 60 days

Corrigendum Updates

3 Updates
#1

Update

11-Feb-2026

Extended Deadline

16-Feb-2026, 9:00 am

Opening Date

16-Feb-2026, 9:30 am

#2

Update

10-Feb-2026

Extended Deadline

13-Feb-2026, 9:00 am

Opening Date

13-Feb-2026, 9:30 am

#3

Update

10-Feb-2026

Extended Deadline

11-Feb-2026, 9:00 am

Opening Date

11-Feb-2026, 9:30 am

Technical Results

S.No Seller Item Date Status
1
ABBOTTSONS IMPEX PRIVATE LIMITED   Under PMA
-15-02-2026 17:05:18
2
BONTON TECHNOMAKE PVT LTD   Under PMA
-09-02-2026 12:32:39
3
IMPRESSION FURNITURE INDUSTRIES PRIVATE LIMITED   Under PMA
-11-02-2026 13:35:20
4
SHYAMAL KUMAR PAHARI   Under PMA
-09-02-2026 17:45:21

Financial Results

Rank Seller Price Item
L1
BONTON TECHNOMAKE PVT LTD(MII)   Under PMA
Item Categories : Grid Ceiling,Gypsum Ceiling,Wooden Laminate False Ceiling,Resilient Vinyl Flooring,70mm Thick Parti
L2
ABBOTTSONS IMPEX PRIVATE LIMITED (MII)   Under PMA
Item Categories : Grid Ceiling,Gypsum Ceiling,Wooden Laminate False Ceiling,Resilient Vinyl Flooring,70mm Thick Parti
L3
IMPRESSION FURNITURE INDUSTRIES PRIVATE LIMITED (MII)   Under PMA
Item Categories : Grid Ceiling,Gypsum Ceiling,Wooden Laminate False Ceiling,Resilient Vinyl Flooring,70mm Thick Parti

Contract / Result Documents 1

Please sign in or create an account to view contract details and download result documents.