Power Generator - DG Set (up to 900 KVA)
N/a
UJJAIN, MADHYA PRADESH
Progress
Quantity
100
Bid Type
Two Packet Bid
The Directorate Of Employment & Training (Gujarat) invites bids for a complete Power Generator installation and DG Set package up to 900 KVA, including installation as per CPWD General Specifications for Electrical works - Part VII. The project scope covers various output capacities (single and three-phase ranges up to 900 kVA), engine specifications, control panels, trailer, and on-site installation. Estimated value is ₹30,00,000? and an EMD of ₹9,00,000. The order may include up to 25% quantity variation and requires advance sample approval within 15 days post-award. Deliveries align with the option clause and extended timelines, with supplier responsibilities for consumables.
The tender emphasizes compliance with technical standards, integration of control panels with meters, and warranty coverage for the complete DG Set. Unique aspects include the need for test reports, warranty terms, and PM visits during the warranty period. This is a procurement opportunity in Gujarat, targeting vendors with experience in bulk DG set supply and installation under government terms.
Keywords: tender in Gujarat, DG Set procurement, 900 KVA generator, CPWD electrical specs, advance sample, delivery extension, PM visits, warranty terms.
DG Set up to 900 KVA with CPWD-compliant installation
Nominal rated capacity across 5-7 kVA to 900 kVA three-phase range
Engine: rated power, cooling type, governor type, RPM, starting voltage
Governing class: transient recovery time; speed change percentages
Alternator: voltage rating, efficiency at 75% load, IP rating
Control panel with meters and indicators
25% quantity variation allowed during contract
Advance sample approval within 15 days post-award
Delivery timeline adjustments without LD for sample delays
Advance sample approval; DD/online EMD; contract payment terms not fully specified beyond sample and general bid terms.
Delivery period linked to original delivery order date; extended period for option-based quantity changes with minimum 30 days.
LD provisions not detailed; sample-driven delivery adjustments may avoid LD during buyer-approved delays.
Experience in supplying and installing DG sets up to 900 KVA
Demonstrated capability for CPWD-grade electrical installations
GST registration and financial stability sufficient for large-scale procurement
N/a
UJJAIN, MADHYA PRADESH
E-municipalities - Eservices To Citizens And Employees Of Urban Local Bodies Of Uttar Pradesh
MAU, UTTAR PRADESH
North Eastern Railway
Indian Army
KUPWARA, JAMMU & KASHMIR
South East Central Railway
BILASPUR, CHHATTISGARH
Tender Results
Loading results...
| Category | Specification | Requirement |
|---|---|---|
| Power Generator INSTALLATION CONFIGURATIONS | Power Generator installation configurations as defined in CPWD General Specifications for Electrical works - Part VII (DG Set) | Fixed (Power Generators are permanently installed)" |
| OUTPUT CAPACITY RATING/ PHASE | Nominal Rated Capacity (kVA) | 15 |
| OUTPUT CAPACITY RATING/ PHASE | No of Phase (Single Phase-3-5kVA) (Single Phase or Three Phase-5 & 7-5, 10,15, 20, 25, 30 & 40 kVA) (Three Phase-50 to 900 kVA) | Three Phase |
| ENGINE | Rated Engine Power (kWm) | 110 % of the required powered at STP(Standard Temperature Pressure) i.e equal to (Nominal Rated Capacity (KVA) of power generator Any Auxilary power Consumption by the Power generator) x Power factor(0.8) / Alternator efficience Or higher |
| ENGINE | Type of Engine cooling | Liquid Cooled |
| ENGINE | Type of governer | Electronic Or higher |
| ENGINE | Rated RPM of Engine (RPM) | 1500 |
| ENGINE | Fuel | High Speed Diesel (HSD) |
| ENGINE | Starting voltage (volt) | 12 |
| ENGINE | Salient Features of Engine | Direct injection Fuel System, Naturally aspirated engine |
| GOVERNING CLASS | "Maximum Recovery Time in Seconds on suddenly taking-off the rated load(Transient) " | 10.0 |
| GOVERNING CLASS | Maximum Change of Speed as a Percentage of Rated Speed on suddenly taking-off the rated load(Permanent) | 3 |
| GOVERNING CLASS | "Maximum Change of Speed as a Percentage of Rated Speed On a change of load, both on and off, by all steps of 25 percent of the rated load (Transient) " | 3 |
| GOVERNING CLASS | "Maximum Recovery Time in Seconds on a change of load, both on and off, by all steps of 25 percent of the rated load(Transient) " | 3.0 |
| GOVERNING CLASS | "Maximum Change of Speed as a Percentage of Rated Speed On a change of load, both on and off, by all steps of 25 percent of the rated load (Permanent) | 1 |
| ALTERNATOR | Alternator Voltage Rating | 415.0 |
| ALTERNATOR | Efficiency at rated Power factor at 75% of full Load | 85.0 - 100.0 Or higher |
| ALTERNATOR | Voltage Regulation Grade | VG 3 Or higher |
| ALTERNATOR | Alternator IP Rating | IP 23 Or higher |
| CONTROL PANEL | Control Panel | Manual Control Panel |
| CONTROL PANEL | Control Panel Location | Inside the canopy |
| CONTROL PANEL | Display meters in the control panel (with appropriate rating and accuracy class ) - inclusive in the scope of supply | Multifunctional Digital display meter (displaying Voltage, Current, Frequency, Power Factor) |
| CONTROL PANEL | Indicators | Low Lube oil pressure, High water / coolant / cylinder head temperature, Low fuel level, Over speed |
| TRAILER | Trailer | NA for Fixed/Skid Mounted Power Generator |
| TRAILER | Pay load of the Trailer | 0, 500, 1000, 2000 Or higher |
| SCOPE OF INSTALLATION | Installation | with installation - inclusive in the scope of supply Or higher |
| WARRANTY/SERVICES | Warranty on Complete power genertor/DG Set | 24, 36 Or higher |
| WARRANTY/SERVICES | Warranty in running hours | 5000.0 - 5000.0 Or higher |
| WARRANTY/SERVICES | Number of preventive maintenance visits offered in an year during warranty period (Supply of all consumables is the buyer's responsibilty)* | 1 |
| TEST REPORTS | Test report Available for (Test/approval) | Type Approval Certificate for the specified rating of the Power Generator from any of the designated agency authorized by CPCB, COP Certificate for engine, Type test report and Endurance test report for Engine as per IS: 10001 latest / IS: 10002 latest, Type test report for Alternator as per IS:13364 (Part-1) latest / IS:13364 (Part-2) latest to prove conformity to the specifications |
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates for DG set installation projects
Financial statements (last 3 years)
EMD proof (DD or online payment receipt)
Technical bid documents and compliance certificates
OEM authorizations or unit dealership certificates
Test reports and approvals relevant to DG sets
Key insights about GUJARAT tender market
Bidders should submit GST, PAN, experience certificates, financials, EMD of ₹9,00,000, OEM authorizations, and technical bid documents. Ensure CPWD Part VII DG Set compliance, provide tests, and obtain advance sample approval within 15 days. Follow option clause for quantity adjustments up to 25%.
Required documents include GST certificate, PAN, experience certificates for DG set projects, last 3 years financial statements, EMD proof, technical compliance certificates, OEM authorization, and test reports. Ensure all documents are uploaded and hard copies delivered within 5 days of bid end date.
Specifications include CPWD-compliant electrical installation, three-phase 50-900 kVA range, engine power, cooling and governor type, rated RPM, starting voltage, alternator efficiency at 75% load, IP rating, and integrated control panel with meters and indicators.
EMD is ₹9,00,000. Payment terms are not fully detailed; supplier must provide EMD via DD or online, with submission proof. Advance sample processes may affect delivery timelines, and bulk payment terms will be per contract norms.
Advance sample approval must be submitted within 15 days of the contract award. If approved, bulk supply proceeds with modifications as per buyer feedback; delays in approval may shift the delivery schedule without LD.
Eligibility requires prior DG set experience up to 900 KVA, CPWD electrical installation capability, GST registration, and financial capacity to handle a ₹30 million estimated value project. OEM authorizations or dealership certificates are required to demonstrate compliance.
Delivery can extend with the option clause permitting up to 25% quantity variation during contract and currency. Delivery timelines rely on the last date of the original delivery order; extended periods must be calculated using the formula provided in the clause.
Sign up now to access all documents
Main Document
CATALOG Specification
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS