Quantity

715

Category

Shifting and re-installation of existing cameras

Bid Type

Two Packet Bid

Categories 26

Survey Of India invites bids for Shifting and re-installation of existing cameras, Shifting and re-installation of existing NVR, Replacement of faulty cameras, 16-channel standalone NVR system, Supply of 2TB surveillance HDD, Supply of LED monitor for live display, Supply and fixing of 5A switch, Supply, laying, and fixing of Cat 6 cable, Supply, laying, and fixing of 1 inch PVC casing, Supply, laying, and fixing of 2. 5 sqmm power cable, Supply and installation of 6U network rack, Supply of 20A DP junction boxes, Commissioning full functionality, other accessories in BANGALORE, KARNATAKA. Quantity: 715. Submission Deadline: 13-10-2025 11: 00: 00. Submit your proposal before the deadline.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Shifting and re-installation of existing cameras , Shifting and re-installation of existing NVR , Replacement of faulty cameras , 16-channel standalone NVR system , Supply of 2TB surveillance HDD , Supply of LED monitor for live display , Supply and fixing of 5A switch , Supply, laying, and fixing of Cat 6 cable , Supply, laying, and fixing of 1 inch PVC casing , Supply, laying, and fixing of 2.5 sqmm power cable , Supply and installation of 6U network rack , Supply of 20A DP junction boxes , Commissioning full functionality , other accessories

Authority Records

MINISTRY OF SCIENCE AND TECHNOLOGYSCIENCE AND TECHNOLOGY DEPARTMENTSURVEY OF INDIA

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-8381521.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 14 Items Sign in for GEM prices

#1

Shifting and re-installation of existing cameras

Shifting and re-installation of existing cameras from Display Room to Admin Office, including re-orientation for optimal viewing angles

6 nos Delivery: 30 days
#2

Shifting and re-installation of existing NVR

Shifting and re-installation of existing NVR units from Display Room to Admin Office

3 nos Delivery: 30 days
#3

Replacement of faulty cameras

Replacement of faulty cameras with equivalent or better specification

3 nos Delivery: 30 days
#4

16-channel standalone NVR system

Supply, installation, and commissioning of 16-channel standalone NVR system with two SATA ports

1 nos Delivery: 30 days
#5

Supply of 2TB surveillance HDD

Supply and fixing of Seagate or WD 2TB surveillance HDD

1 nos Delivery: 30 days
#6

Supply of LED monitor for live display

Supply and fixing of 32 inch or 40 inch LED monitor for live display

1 nos Delivery: 30 days
#7

Supply and fixing of 5A switch

Supply and fixing of 5A switch or socket box

1 nos Delivery: 30 days
#8

Supply, laying, and fixing of Cat 6 cable

Supply, laying, and fixing of Cat 6 cable with necessary accessories

305 mtrs Delivery: 30 days
#9

Supply, laying, and fixing of 1 inch PVC casing

Supply, laying, and fixing of 1 inch PVC casing or pipe

65 mtrs Delivery: 30 days
#10

Supply, laying, and fixing of 2.5 sqmm power cable

Supply, laying, and fixing of 2.5 sqmm power cable

305 mtrs Delivery: 30 days
#11

Supply and installation of 6U network rack

Supply and installation of 6U network rack

1 nos Delivery: 30 days
#12

Supply of 20A DP junction boxes

Supply and installation of 20A DP junction boxes mounted on poles

21 nos Delivery: 30 days
#13

Commissioning full functionality

Testing, commissioning, and ensuring full functionality of the complete CCTV system

1 job Delivery: 30 days
#14

other accessories

Any other accessories, connectors, mounts, or hardware necessary for proper functioning of the system

1 job Delivery: 30 days

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Annual Turnover *In case any bidder is seeking exemption from Experience / Turnover Criteria

6

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Technical Results

S.No Seller Item Date Status
1
AUTOSEC SYSTEMS   Under PMA
-13-10-2025 10:52:52
2
NEXGEN INNOVATION   Under PMA
-03-10-2025 19:33:32
3
SAHYADRI TELECOM   Under PMA
-11-10-2025 16:27:37
4
Vedant Office Automations   Under PMA
-11-10-2025 14:37:24

Financial Results

Rank Seller Price Item
L1
NEXGEN INNOVATION(MSE,MII)( MSE Social Category:General )    Under PMA
Item Categories : Shifting and re-installation of existing cameras,Shifting and re-installation of existing NVR,Repla
L2
SAHYADRI TELECOM (MSE,MII)( MSE Social Category:General )    Under PMA
Item Categories : Shifting and re-installation of existing cameras,Shifting and re-installation of existing NVR,Repla
L3
Vedant Office Automations (MSE,MII)( MSE Social Category:General )    Under PMA
Item Categories : Shifting and re-installation of existing cameras,Shifting and re-installation of existing NVR,Repla
L4
AUTOSEC SYSTEMS (MSE,MII)( MSE Social Category:General )    Under PMA
Item Categories : Shifting and re-installation of existing cameras,Shifting and re-installation of existing NVR,Repla

Contract / Result Documents 1

Please sign in or create an account to view contract details and download result documents.