The issuing authority invites bids for Layer 3 Core Switch, Layer 2 Distribution Switch, Layer 2 POE Plus Switch, Access Point, UPS, SC LC Fibe in GWALIOR, MADHYA PRADESH. Quantity: 13553. Submission Deadline: 25-02-2025 12: 00: 00. Submit your proposal before the deadline.
Tender Category
Goods
Bid To RA
No
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Layer 3 Core Switch
As per attached bid Document
Layer 2 Distribution Switch
As per attached bid Document
Layer 2 POE Plus Switch
As per attached bid Document
Access Point
As per attached bid Document
UPS
As per attached bid Document
SC LC Fiber Patch cord
As per attached bid Document
CAT6 UTP Cable Box
As per attached bid Document
CAT6 Io Box
As per attached bid Document
CAT6 UTP Patch Cord
As per attached bid Document
9U Rack
As per attached bid Document
Electrical wire Box
As per attached bid Document
Power Socket
As per attached bid Document
PVC Conduit
As per attached bid Document
Fibre housing for AP
As per attached bid Document
Electrical Cable laying
As per attached bid Document
Electrical Power Socket install
As per attached bid Document
Rack install
As per attached bid Document
Access Point install
As per attached bid Document
CAT6 Io Box install
As per attached bid Document
CAT6 UTP Cable laying
As per attached bid Document
Commissioning and Documentation
As per attached bid Document
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Layer 3 Core Switch | As per attached bid Document | 1 | nos | [email protected] | 120 | |
| 2 | Layer 2 Distribution Switch | As per attached bid Document | 5 | nos | [email protected] | 120 | |
| 3 | Layer 2 POE Plus Switch | As per attached bid Document | 32 | nos | [email protected] | 120 | |
| 4 | Access Point | As per attached bid Document | 141 | nos | [email protected] | 120 | |
| 5 | UPS | As per attached bid Document | 36 | nos | [email protected] | 120 | |
| 6 | SC LC Fiber Patch cord | As per attached bid Document | 12 | nos | [email protected] | 120 | |
| 7 | CAT6 UTP Cable Box | As per attached bid Document | 24 | nos | [email protected] | 120 | |
| 8 | CAT6 Io Box | As per attached bid Document | 140 | nos | [email protected] | 120 | |
| 9 | CAT6 UTP Patch Cord | As per attached bid Document | 140 | nos | [email protected] | 120 | |
| 10 | 9U Rack | As per attached bid Document | 32 | nos | [email protected] | 120 | |
| 11 | Electrical wire Box | As per attached bid Document | 3 | nos | [email protected] | 120 | |
| 12 | Power Socket | As per attached bid Document | 32 | nos | [email protected] | 120 | |
| 13 | PVC Conduit | As per attached bid Document | 5,000 | mtr | [email protected] | 120 | |
| 14 | Fibre housing for AP | As per attached bid Document | 140 | nos | [email protected] | 120 | |
| 15 | Electrical Cable laying | As per attached bid Document | 270 | mtr | [email protected] | 120 | |
| 16 | Electrical Power Socket install | As per attached bid Document | 32 | nos | [email protected] | 120 | |
| 17 | Rack install | As per attached bid Document | 32 | nos | [email protected] | 120 | |
| 18 | Access Point install | As per attached bid Document | 140 | nos | [email protected] | 120 | |
| 19 | CAT6 Io Box install | As per attached bid Document | 140 | nos | [email protected] | 120 | |
| 20 | CAT6 UTP Cable laying | As per attached bid Document | 7,200 | mtr | [email protected] | 120 | |
| 21 | Commissioning and Documentation | As per attached bid Document | 1 | job | [email protected] | 120 |
Extended Deadline
25-Feb-2025, 12:00 pm
Opening Date
25-Feb-2025, 12:30 pm
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | ACME DIGITEK SOLUTIONS PRIVATE LIMITED Under PMA | - | 25-02-2025 01:32:45 | |
| 2 | BUSINESS AUTOMATION (INDORE) PRIVATE LIMITED Under PMA | - | 24-02-2025 17:44:01 | |
| 3 | NIDHII INDUSTRIES PRIVATE LIMITED Under PMA | - | 24-02-2025 19:03:53 | |
| 4 | SHREENATH ENTERPRISES Under PMA | - | 25-02-2025 11:02:08 |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | ACME DIGITEK SOLUTIONS PRIVATE LIMITED(MSE)( MSE Social Category:General ) Under PMA | Item Categories : Layer 3 Core Switch,Layer 2 Distribution Switch,Layer 2 POE Plus Switch,Access Point,UPS,SC LC Fibe | |
| L2 | BUSINESS AUTOMATION (INDORE) PRIVATE LIMITED Under PMA | Item Categories : Layer 3 Core Switch,Layer 2 Distribution Switch,Layer 2 POE Plus Switch,Access Point,UPS,SC LC Fibe |
Key insights about MADHYA PRADESH tender market
The eligibility requirements for participating in this tender include having a valid registration as a legal entity and proven experience in network installation services, specifically in educational environments. Bidders must comply with local regulations and demonstrate sufficient technical and financial capabilities to execute the project effectively. Additionally, MSEs may find more lenient criteria outlined in the tender documents.
Yes, bidders are required to submit various certificates including technical compliance certifications, financial stability proof, and any specific quality assurance documents relevant to the network installation equipment. It's crucial that all certificates meet the standards outlined in the tender description, ensuring eligibility for consideration during the evaluation process.
All document submissions must be made electronically, and the preferred format is PDF. Bidders should ensure that all files are readable and properly structured, including technical and financial proposals alongside any necessary attachments to avoid disqualification.
Successful bidders will be required to submit a performance security equivalent to a specified percentage of the contract value upon winning the tender. This is to ensure the faithful execution of the contract and to mitigate any risks associated with project completion. Details about the exact percentage and conditions are available in the tender documentation.
The payment terms are typically structured around project milestones and deliverables. Bidders should review the tender documents for detailed information about accepted payment schedules, including any advance payments upon signing the contract and subsequent payments tied to project completion stages. Adherence to the specified terms is crucial for ensuring smooth cash flow during project execution.
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS