TenderDekho Logo
GEM

Bokaro Steel Plant CLEANER/DEFOAMER Procurement Tender BOKARO Jharkhand 2026 ISO-ISO/IS 550 Compliant

Bid Publish Date

18-Jun-2026, 5:38 pm

Bid End Date

29-Jun-2026, 6:00 pm

Progress

Issue18-Jun-2026, 5:38 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

522228

Category

CLEANER FOR HDGL CRM-III

Bid Type

Two Packet Bid

Key Highlights

  • Quantity variation up to 25% with no price change
  • GST handling and reimbursement rules specified
  • Data Sheet upload mandatory to verify technical parameters
  • OEM authorization required for distributors
  • Post-receipt inspection at Bokaro Steel Plant Store
  • Scope includes installation, testing, commissioning, and operator training
  • Invoices must be in consignee name with consignee GSTIN

Categories 2

Tender Overview

Bokaro Steel Plant, a unit of the Steel Authority of India Limited, invites bids for CLEANER FOR HDGL CRM-III, DEFOAMER FOR HDGL CRM-III, CLEANER FOR ECL CRM-III, DEFOAMER FOR ECL CRM-III, and APPLICATION INSTALL CLEANER FOR ECL AND HDGL CRM-III. Estimated value and exact quantities are not disclosed; however, the contract covers supply, installation, testing, commissioning, and operator training, with statutory clearances if required. The tender permits a quantity variation of up to 25% during and after the contract with rates unchanged, and requires data sheet alignment with offered technical parameters. Bidder must ensure GST handling and invoice alignment with consignee GSTIN. A pre-dispatch inspection may be waived; post-receipt inspection occurs at BSL Store, Bokaro. A data sheet upload is mandatory to match specifications.

Technical Specifications & Requirements

  • Product names: CLEANER, DEFOAMER, and APPLICATION INSTALLER for CRM-III systems at HDGL and ECL units
  • Scope: Supply, installation, testing, commissioning, operator training, and any required statutory clearances
  • Data Sheet: Must accompany bid; mismatch could lead to bid rejection
  • Authorization: OEM authorization required if bid is from an Authorized Distributor or service provider
  • Invoices: Must be raised in the consignee name with consignee GSTIN; GST invoicing and GST portal payment proof required
  • Inspection: Post-receipt inspection at Bokaro Steel Plant Store; pre-dispatch waived if ATC allows
  • Quality/Compliance: Data sheet alignment with offered parameters is mandatory; non-conformance may lead to rejection

Terms, Conditions & Eligibility

  • Option clause: Purchaser may increase/decrease order quantity up to 25% at contracted rates; extended delivery period calculations apply with minimum 30 days
  • GST: Bidder bears applicable GST; reimbursement as per actuals or applicable rates, up to quoted GST percentage
  • Data Sheet: Upload mandatory; ensure parameter match with product
  • Manufacturer Authorization: Required from OEM for distributors
  • Invoice GST: Must reflect consignor GSTIN and GST portal screenshot confirming payment
  • Scope of Supply: Includes supply, installation, testing, commissioning, operator training, and any required clearances
  • Inspection: Post-receipt inspection at BSL Store, Bokaro City; pre-dispatch waived if ATC selected
  • Documentation: Bid must include certificates/docs as requested; missing certificates may lead to rejection

Key Specifications

    • Product names: Cleaner and Defoamer for CRM-III systems at HDGL and ECL units
    • Scope: Supply, Installation, Testing, Commissioning, operator training, and statutory clearances
    • Data Sheet: Upload with bid; must match offered parameters
    • Authorization: OEM/Original Service Provider authorization required
    • Invoice: In consignee name with consignee GSTIN; GST portal payment proof
    • Inspection: Post-receipt inspection at Bokaro Steel Plant Store

Terms & Conditions

  • 25% quantity variation at bid/contract stage

  • GST handling aligned to consignee GSTIN and actual rates

  • Data Sheet alignment essential for bid acceptance

Important Clauses

Payment Terms

GST refunds and invoicing to be aligned with consignee GSTIN; reimbursement as per actuals or applicable rates

Delivery Schedule

Delivery period extended proportionally if option clause exercised; minimum 30 days for added time

Penalties/Liquidated Damages

Not explicitly stated; delivery extensions governed by option clause; LD, if any, not defined here

Bidder Eligibility

  • Experience in supplying cleaners/defoamers or similar chemical additives for CRM-III systems

  • Manufacturer authorization for OEM or authorized distributor

  • GST registration with current GSTIN and compliance history

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

CLEANER FOR HDGL CRM-III , DEFOAMER FOR HDGL CRM-III , CLEANER FOR ECL CRM-III , DEFOAMER FOR ECL CRM-III , APPLICATION INSTALL CLEANER FOR ECL AND HDGL CRM-III

Authority Records

MINISTRY OF STEELSTEEL AUTHORITY OF INDIA LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9474162.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 5 Items Sign in for GEM prices

#1

CLEANER FOR HDGL CRM-III

CLEANER FOR HDGL CRM-III AS PER ATTACHED SPECIFICATION DOCUMENT

177,804 kg Delivery: 365 days
#2

DEFOAMER FOR HDGL CRM-III

DEFOAMER FOR HDGL CRM-III AS PER ATTACHED SPECIFICATION DOCUMENT

18,858 kg Delivery: 365 days
#3

CLEANER FOR ECL CRM-III

CLEANER FOR ECL CRM-III AS PER ATTACHED SPECIFICATION DOCUMENT

19,963 kg Delivery: 365 days
#4

DEFOAMER FOR ECL CRM-III

DEFOAMER FOR ECL CRM-III AS PER ATTACHED SPECIFICATION DOCUMENT

2,369 kg Delivery: 365 days
#5

APPLICATION INSTALL CLEANER FOR ECL AND HDGL CRM-III

APPLICATION INSTALL CLEANER FOR ECL AND HDGL CRM-III AS PER ATTACHED SPECIFICATION DOCUMENT

303,234 ton Delivery: 365 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

PAN card

3

Experience certificates (similar supply)

4

Financial statements

5

EMD/Security deposit (if applicable in terms)

6

OEM authorization or manufacturer authorization

7

Data Sheet of offered products

8

Technical bid documents

9

GST portal GST invoice screenshot (payment proof)

Frequently Asked Questions

Key insights about JHARKHAND tender market

What documents are required for tender in Bokaro steel plant cleaners?

Bidders must submit GST registration, PAN, experience certificates for similar work, financial statements, OEM authorization if applicable, data sheet of offered products, and GST invoice proof. Ensure post-receipt inspection readiness and data sheet alignment with stated parameters to avoid rejection.

How to handle quantity variation in this Bokaro CRM-III tender?

Contract allows up to 25% increase/decrease of bid quantity during placement and currency; rates remain contracted. Delivery time adapts using the formula (Additional quantity/Original quantity) × Original delivery period with a minimum of 30 days.

What is required for OEM authorization in this procurement bid?

Bids from distributors require a Manufacturer Authorization form/certificate detailing OEM name, address, email, and phone. This must accompany the bid to validate product sourcing and compliance with CRM-III specifications.

When will post-receipt inspection occur for Bokaro Steel Plant bid?

Post-receipt inspection is conducted at the Bokaro Steel Plant Store, Bokaro City after delivery acceptance. Pre-dispatch inspection may be waived if ATC allows; ensure all data sheets match offered products.

What are the GST requirements for invoicing in this tender?

Invoices must be raised in the consignee name with the consignee GSTIN. Upload scanned GST invoice copies on GeM and provide GST portal payment proof; reimbursement will follow actual rates or the quoted GST percentage.

What technical details must be included in the data sheet?

Data sheets must precisely match offered product parameters for cleaners and defoamers for CRM-III systems; mismatches can lead to bid rejection. Include composition, packaging, performance metrics, and installation requirements.

What is the scope of supply for this Bokaro tender?

Scope includes supply, installation, testing, commissioning, operator training, and any required statutory clearances. Ensure data sheet and post-installation support align with CRM-III system needs at HDGL and ECL units.

How does the option clause affect delivery timelines in this bid?

Option clause allows extended delivery time based on increased quantity; calculated as (Increased quantity ÷ Original quantity) × Original delivery period with a minimum of 30 days, and may extend to the original delivery period.