Bid Publish Date
18-Jun-2026, 8:15 pm
Bid End Date
29-Jun-2026, 9:00 pm
Location
Progress
Quantity
5
Category
Armature
Bid Type
Single Packet Bid
The Indian Army, Department Of Military Affairs, announces a procurement opportunity in Udhampur, Jammu & Kashmir (postal code 182101) for multiple mechanical and labour services including Armature, Main Starter, Field Coil, Lathe Work and Labour Charge. The scope covers five BOQ items with unspecified quantities but requires data sheet alignment and conformity to technical parameters. The tender emphasizes the option clause allowing up to 25% quantity variation at contracted rates, with delivery extensions calculated from the original delivery period. Consortium submissions are allowed with a designated leader and joint responsibility. A Data Sheet upload is mandatory for technical verification, ensuring alignment with offered product specifications. This procurement targets suppliers capable of manufacturing, assembling or processing mechanical components and performing associated labour work under strict conformity checks.
This opportunity is distinguished by its blended mix of electrical/mechanical components and machine shop labour, plus the governance of quantity variation and consortium collaboration. The requirement to attach a Data Sheet for product verification reduces scope ambiguity and fosters transparency in parameter matching. The need for coordinated delivery under option clauses can affect production scheduling and lead times. Bidders should prepare capability demonstrations and ensure alignment with the data verification process for tender success.
Product categories: Armature, Main Starter, Field Coil, Lathe Work, Labour Charge
Five BOQ items with unspecified quantities
Data Sheet submission required to verify parameters
Option clause permitting ±25% quantity variation
Delivery period adjustments based on extended quantity and 30-day minimum
Consortium permitted with joint liability
Up to 25% quantity variation at contract and during currency with proportional delivery extension
Mandatory Data Sheet alignment; mismatches may cause rejection
Consortium allowed; lead firm bears full contractual responsibility
Purchaser may increase/decrease quantity by up to 25% at contracted rates; delivery extension formula and minimum 30-day extension.
Sellers can form a consortium; each member is equally responsible; an undertaking must be uploaded with bid.
Data Sheet of offered products must be uploaded; buyer will verify consistency with technical parameters.
Experience in manufacturing/assembly of mechanical/electrical components (armature, starters, field coils)
Ability to provide Data Sheet aligned with BOQ specifications
Compliance with consortium participation and joint liability requirements
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Armature , Main Starter , Field Coil , Lathe Work , Labour Charge
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Armature
Armature Assy Rewinding
Main Starter
Main Starter Assy Rewinding
Field Coil
Field Coil Rewinding
Lathe Work
Lathe Work
Labour Charge
Labour Charge
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Armature | Armature Assy Rewinding | 1 | pieces | eswaramadaka@960 | 15 | |
| 2 | Main Starter | Main Starter Assy Rewinding | 1 | pieces | eswaramadaka@960 | 15 | |
| 3 | Field Coil | Field Coil Rewinding | 1 | pieces | eswaramadaka@960 | 15 | |
| 4 | Lathe Work | Lathe Work | 1 | pieces | eswaramadaka@960 | 15 | |
| 5 | Labour Charge | Labour Charge | 1 | pieces | eswaramadaka@960 | 15 |
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar contracts
Financial statements (audited/unaudited as applicable)
EMD/Security deposit documentation (as per bid terms)
Technical bid documents
OEM authorizations (if applicable) and Data Sheet alignment
Consortium undertaking (if applicable) confirming joint responsibility
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | M/S OMKAAR TRADERS(MSE)( MSE Social Category:General ) Under PMA | Item Categories : Armature,Main Starter,Field Coil,Lathe Work,Labour Charge | |
| L2 | Dream Homz Enterprises( MSE Social Category:General ) Under PMA | Item Categories : Armature,Main Starter,Field Coil,Lathe Work,Labour Charge | |
| L3 | SSTRADING( MSE Social Category:SC ) Under PMA | Item Categories : Armature,Main Starter,Field Coil,Lathe Work,Labour Charge |
Key insights about JAMMU AND KASHMIR tender market
Bidders need to submit a Data Sheet aligned with offered armature, main starter and field coil specifications. Include consortium undertaking if applicable and ensure conformity to the 25% quantity variation clause. Provide GST, PAN, and financial statements as part of the submission alongside technical bid documents.
Required documents include GST certificate, PAN, experience certificates for similar contracts, financial statements, EMD documentation, technical bid, OEM authorizations (if applicable) and Data Sheet alignment with BOQ items. Consortium undertakings should be included if applicable.
A Data Sheet must be uploaded with the bid, precisely matching the technical parameters of the offered armature, main starter, field coil, and lathe work. Any unexplained mismatch can lead to bid rejection, so ensure parameter parity with BOQ items.
The purchaser may increase or decrease quantity up to 25% at contracted rates both at initial order and during currency. Delivery time extensions are calculated by (increased/Original quantity) × Original delivery period, with a minimum of 30 days.
Delivery extension rules apply when quantity changes occur; minimum extension is 30 days if original period is shorter. The exact delivery schedule depends on the final approved quantity and delivery period defined in the purchase order.
Bidders may form a consortium with other sellers; one company acts as the leader and all members share equal responsibility for execution. An undertaking to this effect must be uploaded with the bid.
From the available terms, explicit warranty or penalty clauses are not specified. Bidders should rely on standard army procurement practices and await formal contract terms for warranty and potential penalties.
Cross-check each parameter in the Data Sheet with the corresponding technical parameters in the BOQ and product specifications. Any mismatch can trigger bid rejection, so ensure all entries are exact and verifiable.
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS