TenderDekho Logo
Closed GEM

Government Tender Published for Excavation,returning,removal,taking out,cutting,same as 7 100mm,supply and welding,di fitting,repai in DARJEELING, WEST BENGAL

Bid Publish Date

22-Jul-2026, 5:17 pm

Bid End Date

05-Aug-2026, 6:00 pm

EMD

₹75,000

Generate Docs

Progress

RA
Issue22-Jul-2026, 5:17 pm
Corrigendum01-Aug-2026
Reverse AuctionCompleted
AwardCompleted

Indian Army invites bids for Excavation, returning, removal, taking out, cutting, same as 7 100mm, supply and welding, di fitting, repaire sluice valve, ci butterfly valve, SITC Of IRP and Filtration Plant, M and L for pcc, m and l for valve chamber in DARJEELING, WEST BENGAL. Quantity: 37. Submission Deadline: 05-08-2026 18: 00: 00. Submit your proposal before the deadline.

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Reverse Auction Results Final Prices

These are the final prices after the reverse auction event. Prices may be lower than initial bids.

Rank Seller Final Price Item
L1M/s Deoki Prasad Agarwal(MII)   Under PMA Winner ₹15,65,900Item Categories : Excavation,returning,removal,taking out,cutting,same as 7 100mm,supply and welding,di fitting,repai
L2DM ENTERPRISES (MII)   Under PMA₹18,71,920Item Categories : Excavation,returning,removal,taking out,cutting,same as 7 100mm,supply and welding,di fitting,repai
L3SILIGURI SALES AGENCY (MII)   Under PMA₹18,89,943Item Categories : Excavation,returning,removal,taking out,cutting,same as 7 100mm,supply and welding,di fitting,repai

🎉 L1 Winner

M/s Deoki Prasad Agarwal(MII)   Under PMA

Final Price: ₹15,65,900

Reverse Auction Schedule

Completed

Start

12-Aug-2026, 5:00 pm

End

17-Aug-2026, 6:00 pm

Duration: 121 hours

Reverse Auction Document

✅ RA concluded. Check financial results for final rankings.

Tender Data

Bid Details

Quantity

37

Category

SITC Of IRP and Filtration Plant

Bid Type

Two Packet Bid

Bid Validity

30 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Past Performance

50 %

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Excavation , returning , removal , taking out , cutting , same as 7 100mm , supply and welding , di fitting , repaire sluice valve , ci butterfly valve , SITC Of IRP and Filtration Plant , M and L for pcc , m and l for valve chamber

Advisory Bank

State Bank of India

ePBG Percentage

1%

ePBG Duration (Months)

3

Delivery Details

Max Delivery Days

60

Delivery Locations

1

Delivery Cities

Darjeeling

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-DarjeelingDarjeeling--260-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9625041.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 13 Items Sign in for GEM prices

#1

Excavation

Excavation in trenches not exc. 1.5 mtr wide and not exc. 1.5 mtr in depth and getting out excavated material for laying taking out pipe line in any type of soft loose soil complete all as specified and directed.

2 cum Delivery: 60 days
#2

returning

Returning filling in including spreading leveling watering and well ramming in layers not exc 25 cm in each layer in any type of soil complete all as specified and directed.

1 cum Delivery: 60 days
#3

removal

Removal of surplus soil to a distance not exc 50 mtr and depositing where directed at a level not exc. 1.5 mtr above the starting point in any type of soil all as specified and directed.

1 cum Delivery: 60 days
#4

taking out

Taking out 100 mm bore CI DI GI Water main from trenches and staking at site complete all as directed.

10 rm Delivery: 60 days
#5

cutting

Cutting of existing cast iron DI pipes in any position for insertion and fitting of new Tee Coller Tail pieces etc for taking out connections branch connections complete all as specified and directed for the following sizes Note a Excavation earth work shall be measured and paid seperately under respective item of schedule. b Fittings shall be measured and paid seperately as supply only under respective item of the schedule

1 each job Delivery: 60 days
#6

same as 7 100mm

same as item no. 7 but for 100 mm dia

6 rm Delivery: 60 days
#7

supply and welding

Supply welding fabrication and testing of ERW MS pipes 100 mm dia including flanges complete all as specified and as directed by engineer in charge.

4 rm Delivery: 60 days
#8

di fitting

M L for DI fittings for spigot and socket pipes of size 80 mm to 150 bore such as bends any type radius and angle tapers any type straight bend increasing decreasing or double socket etc Tee pieces single branch Y junction double branch cross all sockets or socket and spigot collars caps and plugs complete all as specified and directed.

6 kg Delivery: 60 days
#9

repaire sluice valve

S F in repair sluice valve heavy duty with SS spindle H W conforming to IS 14846 both end flanged class PN 1.6 of size 150 mm dia incl necessary nuts bolts washers and gasket complete all as specified and directed.

1 each Delivery: 60 days
#10

ci butterfly valve

S F in repair cast iron butterfly valve heavy duty conforming to IS 14846 both end flanged class PN 1.6 of size 100 mm dia incl necessary nuts bolts washers and gasket complete all as specified and directed.

1 each Delivery: 60 days
#11

SITC Of IRP and Filtration Plant

Supply installation testing and commissioning of Iron removal IRP cum pressure filteration plant of capacity 10 000 Gallon per hour GPH with pressure filter size 2000 mm dia and 1800 mm height with catalytic media oxidation chamber 1000 mm dia and 1200 mm height with filling of gravels and catalytic media including RCC foundation for entire system as per OEM recommendations foundation drawing . The complete layout for pipeline connection and butterfly valves pressure gauge 2 Nos sampling cocks etc complete all as specified and as directed by engineer in charge. Make RMCO or equivalent

1 each job Delivery: 60 days
#12

M and L for pcc

M L for PCC 1 3 6 type C2 using 40mm graded stone aggregate 100 mm thick as in road PCC or any other works required on site requirement all as directed by Engr in Charge.

2 sqm Delivery: 60 days
#13

m and l for valve chamber

M L for construction of valve chamber with MS sheet cover 3mm thick with angle iron frame of size 50 x 50 x 6mm and locking arrangements with handle duly painted with one coat of primer and two coats of black synthetic enamel paints including excavation and earth work in any type of soil PCC 1 4 8 type D2 in foundation PCC benching 1 2 4 type B 1 PCC 1 5 8 block masonry 20 cm thick in cement mortar 1 6 10 mm thick plastering in CM 1 4 PCC bed in 1 3 6 and coping 50mm thick in cement concrete 1 2 4 type B1 using 20mm stone aggregate including necessary formwork painting one coat of red oxide and two coats of bituminous black paint on all metallic surfaces as specified and as directed of sizes 1000mm x 1000mm x 1000mm internal dimensions complete all as specified and as directed.

1 each job Delivery: 60 days

Categories 112

BLOCK WORK PIPE AND TUBE FITTINGS WIND MILL ENERGY PROJECT WATER DISTRIBUTION APPARELS FILTERS PLATFORM SCALE BRIDGE CONSTRUCTION SLUICE VALVE ANGLE APFC PANEL POLYETHYLENE PIPE BUILDING CONSTRUCTION MISCELLANEOUS VALVE PAINTING STRUCTURE FABRICATION BUTTERFLY VALVES MANUFACTURING MACHINERY WALL CONSTRUCTION AIR CYLINDERS PIPE PROJECT TUBE AND FITTING ARNO STARTING CONTACTOR STEEL FURNITURE HARDWARE AND FASTENERS AIR REGULATORS WELL TESTING EQUIPMENTS FERROUS ALLOY SUPPLY DISTEMPER BED MILLING MACHINE OIL REGENERATION RUBBER GASKET SOIL EARTH SNG CLOTHING MUSICAL INSTRUMENT PARTS AND ACCESSORIES BED STOMACHERS INDICATING AND RECORDING INSTRUMENTS SOCKET POWER PRESSURE INDICATORS ALUMINIUM ALLOY SEALING RING HYDRANT LINE FLOW REGULATOR GINNING OIL FLUID MECHANICS EQUIPMENT TREATMENT OF DRINKING WATER RCC BLOCK CEMENT FITMENT RADIAL DRILLING MACHINE EARTH AND STONE BEARING HOLDERS BRANDY LABORATORY PRESSES PNEUMATIC BOLTS PRESSURE GAUGE AROMATIC SPIRIT VALVES WASHERS GASKETS AND SEALS RCC WORK GATE VALVES PRESSURE REGULATOR TECHNICAL SERVICES NUTS DRINKING WATER SYSTEM VALVE WATER LEVEL RECORDER SANITARY FITTING WATER SUPPLY MATERIAL PRESSURE MEASURING AND CONTROL INSTRUMENTS FILTER RETAINERS GRAVELS PENDA FUME HOODS ERECTION OF STRUCTURAL PUMP HOUSE CONSTRUCTION DRINKING WATER SUPPLY FILLING RAIN CUT SLIDER VALVES PAINTS AND PRIMERS FIBERS THREADS AND YARNS TUBES AND PIPES ANAESTHESIA MACHINE ANGLE COCK BACKHOE TRANSITION METALS FIRE BREATHING APPARATUS FABRICATOR WATER TRANSMISSION GAUGE BUTTERFLY LUG PATTERN VALVES VALVE PARTS AND ACCESSORIES EXCAVATION STRUCTURE EARTH WORK BRICK BUNDI PEB PIPES UPVC PIPE PAINTS METAL PRODUCTS BOYLES APPARATUS EARTH MOVING TEE CONSTRUCTION MANUFACTURING SERVICES

Corrigendum Updates

1 Update
#1

Update

01-Aug-2026

Extended Deadline

05-Aug-2026, 12:30 pm

Opening Date

05-Aug-2026, 1:00 pm