TenderDekho Logo
GEM

Contract Bidding Open For SITC of Multi Giga PoE Network Switch,SITC of SFP Module 10G with RoHS Compliant,SITC of Wi-Fi 6 Ac in NEW DELHI, DELHI

Bid Publish Date

15-Dec-2025, 4:25 pm

Bid End Date

05-Jan-2026, 5:00 pm

EMD

₹4,57,765

Progress

Issue15-Dec-2025, 4:25 pm
Technical01-May-2026, 1:23 pm
Financial
Award11-Feb-2026, 1:08 am
Explore all 4 tabs to view complete tender details

Quantity

33345

Category

SITC of Multi Giga PoE Network Switch

Bid Type

Two Packet Bid

Categories 46

Public procurement opportunity for Central Water Commission (cwc) SITC of Multi Giga PoE Network Switch, SITC of SFP Module 10G with RoHS Compliant, SITC of Wi-Fi 6 Access Point 4x internal antennas with 2. 5 G Port and MTCTE certified, SITC of Hardware Wireless Lan Controller, SITC of OFC Patch Cord 3M LSZH, SITC of Cat6A LAN Cable, SITC of 24 Port Cat-6A Loaded Patch Panel Rack side, SITC of 24 Port Cat- 6A UnLoaded Patch Panel Rack side, SITC of CAT 6 A Patch cord 1 mtr rack side, SITC of Cat6A Patch Cord 2 Mtr Field Side LSZH, SITC of Cat-6A IO for Rack side for AP, SITC of Cat-6A IO for User Side, SITC of Simplex Faceplate and Back Box protect from dust, SITC of PVC Conduit 32 mm MMS FRLS, SITC of PVC Conduit 40 mm MMS FRLS, SITC of PVC Conduit 25 mm MMS FRLS, SITC of PVC Duct 100X50 mm Medium, SITC of PVC Duct 50X50 mm Medium, SITC of PVC Channel 25 mm Medium, SITC of PVC Channel 32 mm Medium, SITC of of PVC Flexible Pipe 25 mm, SITC of of PVC Flexible Pipe 32 mm, SITC of PVC Flexible Pipe 40 mm, Dismantle Existing Network Rack with network switch, Dismantle of Existing cable cat-6, ITC of Penta Scanning Performance Testing Charges, Performance Testing Charges towards Testing of wireless Access point Fiber cable and Lan cable OTDR in NEW DELHI, DELHI. Quantity: 33345 issued by. Submission Deadline: 05-01-2026 17: 00: 00. View full details and respond.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

SITC of Multi Giga PoE Network Switch , SITC of SFP Module 10G with RoHS Compliant , SITC of Wi-Fi 6 Access Point 4x internal antennas with 2.5 G Port and MTCTE certified , SITC of Hardware Wireless Lan Controller , SITC of OFC Patch Cord 3M LSZH , SITC of Cat6A LAN Cable , SITC of 24 Port Cat-6A Loaded Patch Panel Rack side , SITC of 24 Port Cat- 6A UnLoaded Patch Panel Rack side , SITC of CAT 6 A Patch cord 1 mtr rack side , SITC of Cat6A Patch Cord 2 Mtr Field Side LSZH , SITC of Cat-6A IO for Rack side for AP , SITC of Cat-6A IO for User Side , SITC of Simplex Faceplate and Back Box protect from dust , SITC of PVC Conduit 32 mm MMS FRLS , SITC of PVC Conduit 40 mm MMS FRLS , SITC of PVC Conduit 25 mm MMS FRLS , SITC of PVC Duct 100X50 mm Medium , SITC of PVC Duct 50X50 mm Medium , SITC of PVC Channel 25 mm Medium , SITC of PVC Channel 32 mm Medium , SITC of of PVC Flexible Pipe 25 mm , SITC of of PVC Flexible Pipe 32 mm , SITC of PVC Flexible Pipe 40 mm , Dismantle Existing Network Rack with network switch , Dismantle of Existing cable cat-6 , ITC of Penta Scanning Performance Testing Charges , Performance Testing Charges towards Testing of wireless Access point Fiber cable and Lan cable OTDR

Authority Records

MINISTRY OF JAL SHAKTICENTRAL WATER COMMISSION

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-8717041.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 27 Items Sign in for GEM prices

#1

SITC of Multi Giga PoE Network Switch

Supply, Installation, Testing, Commissioning of Multi Giga PoE Network Switch 8 x 2.5Gbps Multi-G Ethernet Ports 2 x 10Gbps SFP+ Ports Fanless Design. 6KV Surge protection for all 2.5GE ports with MTCTE certified

29 number Delivery: 90 days
#2

SITC of SFP Module 10G with RoHS Compliant

Supply, Installation, Testing, Commissioning of SFP Module 10G with RoHS Compliant

58 number Delivery: 90 days
#3

SITC of Wi-Fi 6 Access Point 4x internal antennas with 2.5 G Port and MTCTE certified

Supply, Installation, Testing, Commissioning of Wi-Fi 6 Access Point 4x internal antennas with 2.5 G Port and MTCTE certified

169 number Delivery: 90 days
#4

SITC of Hardware Wireless Lan Controller

Supply, Installation, Testing, Commissioning of Hardware Wireless Lan Controller WLC up to 500 AP management LAN Interface 4x 2.5GbE RJ45 port and complies with IEEE 802.3u, 802.3ab, 802.3bz

1 number Delivery: 90 days
#5

SITC of OFC Patch Cord 3M LSZH

Supply, Installation, Testing, Commissioning of OFC Patch Cord 3M LSZH with (IEC 61754/TIA/EIA).

29 number Delivery: 90 days
#6

SITC of Cat6A LAN Cable

Supply, Installation, Testing, Commissioning of Cat6A LAN Cable 23 AWG LSZH tested up to 500MHz.

24,095 meter Delivery: 90 days
#7

SITC of 24 Port Cat-6A Loaded Patch Panel Rack side

Supply, Installation, Testing, Commissioning of 24 Port Cat-6A Loaded Patch Panel Rack side

12 number Delivery: 90 days
#8

SITC of 24 Port Cat-6A UnLoaded Patch Panel Rack side

Supply, Installation, Testing, Commissioning of 24 Port Cat-6A UnLoaded Patch Panel Rack side

22 number Delivery: 90 days
#9

SITC of CAT 6 A Patch cord 1 mtr rack side

Supply, Installation, Testing, Commissioning of CAT 6 A Patch cord 1 mtr rack side

399 number Delivery: 90 days
#10

SITC of Cat6A Patch Cord 2 Mtr Field Side LSZH

Supply, Installation, Testing, Commissioning of Cat6A Patch Cord 2 Mtr Field Side LSZH .

399 number Delivery: 90 days
#11

SITC of Cat-6A IO for Rack side for AP

Supply, Installation, Testing, Commissioning of Cat-6A I/O for Rack side for AP ANSI/TIA/EIA 568 C.2 & ISO 11801 standard.

169 number Delivery: 90 days
#12

SITC of Cat-6A IO for User Side

Supply, Installation, Testing, Commissioning of Cat-6A I/O for User Side ANSI/TIA/EIA 568 C.2 & ISO 11801 standard.

399 number Delivery: 90 days
#13

SITC of Simplex Faceplate and Back Box protect from dust

Supply, Installation, Testing, Commissioning of Simplex Faceplate & Back Box protect from dust.

399 number Delivery: 90 days
#14

SITC of PVC Conduit 32 mm MMS FRLS

Supply, Installation, testing, commissioning of PVC Conduit 32 mm MMS FRLS with all required accessories

4,140 meter Delivery: 90 days
#15

SITC of PVC Conduit 40 mm MMS FRLS

Supply, Installation, testing, commissioning of PVC Conduit 40 mm MMS FRLS with all required accessories

675 meter Delivery: 90 days
#16

SITC of PVC Conduit 25 mm MMS FRLS

Supply, Installation, testing, commissioning of PVC Conduit 25 mm MMS FRLS with all required accessories

450 meter Delivery: 90 days
#17

SITC of PVC Duct 100X50 mm Medium

Supply, Installation, testing, commissioning of PVC Duct 100X50 mm Medium

120 meter Delivery: 90 days
#18

SITC of PVC Duct 50X50 mm Medium

Supply, Installation, testing, commissioning of PVC Duct 50X50 mm Medium

96 meter Delivery: 90 days
#19

SITC of PVC Channel 25 mm Medium

Supply, Installation, testing, commissioning of PVC Channel 25 mm Medium

150 meter Delivery: 90 days
#20

SITC of PVC Channel 32 mm Medium

Supply, Installation, testing, commissioning of PVC Channel 32 mm Medium

150 meter Delivery: 90 days
#21

SITC of of PVC Flexible Pipe 25 mm

Supply, Installation, testing, commissioning of PVC Flexible Pipe 25 mm

125 meter Delivery: 90 days
#22

SITC of of PVC Flexible Pipe 32 mm

Supply, Installation, testing, commissioning of PVC Flexible Pipe 32 mm

175 meter Delivery: 90 days
#23

SITC of PVC Flexible Pipe 40 mm

Supply, Installation, testing, commissioning of PVC Flexible Pipe 40 mm

80 meter Delivery: 90 days
#24

Dismantle Existing Network Rack with network switch

Dismantle of Existing Network Rack with network switch, patch panel, patch cord from 36U/ 24U/ 17U/ 15U/12U/9U

6 number Delivery: 90 days
#25

Dismantle of Existing cable cat-6

Dismantle of Existing cable cat-6 with I/O, Faceplate, etc

200 node Delivery: 90 days
#26

ITC of Penta Scanning Performance Testing Charges

Installtion, testing, commissioning of Penta Scanning Performance Testing Charges towards Testing of Copper Cable

399 each Delivery: 90 days
#27

Performance Testing Charges towards Testing of wireless Access point Fiber cable and Lan cable OTDR

Performance Testing Charges towards Testing of wireless Access point Fiber cable/Lan cable OTDR

399 number Delivery: 90 days

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Additional Doc 1 (Requested in ATC)

8

Additional Doc 2 (Requested in ATC)

9

Additional Doc 3 (Requested in ATC)

10

Additional Doc 4 (Requested in ATC)

11

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

12

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Technical Results

S.No Seller Item Date Status
1
AAR ESS EXIM PRIVATE LIMITED   Under PMA
-05-01-2026 13:23:49
2
ARTEK ENTERPRISES PRIVATE LTD.   Under PMA
-05-01-2026 16:35:48
3
OPTIMUM SECURITY SOLUTIONS PRIVATE LIMITED   Under PMA
-03-01-2026 13:41:00
4
SAM INFOSYSTEMS   Under PMA
-02-01-2026 18:41:42
5
SENSECURE INTEGRATED SOLUTIONS PRIVATE LIMITED   Under PMA
-04-01-2026 20:10:49
6
TATVIK SYSTEM SOLUTIONS PRIVATE LIMITED   Under PMA
-05-01-2026 15:51:31

Financial Results

Rank Seller Price Item
L1
SAM INFOSYSTEMS(MII)   Under PMA
Item Categories : SITC of Multi Giga PoE Network Switch,SITC of SFP Module 10G with RoHS Compliant,SITC of Wi-Fi 6 Ac
L2
SENSECURE INTEGRATED SOLUTIONS PRIVATE LIMITED (MII)   Under PMA
Item Categories : SITC of Multi Giga PoE Network Switch,SITC of SFP Module 10G with RoHS Compliant,SITC of Wi-Fi 6 Ac
L3
OPTIMUM SECURITY SOLUTIONS PRIVATE LIMITED (MII)   Under PMA
Item Categories : SITC of Multi Giga PoE Network Switch,SITC of SFP Module 10G with RoHS Compliant,SITC of Wi-Fi 6 Ac

Contract / Result Documents 1

Please sign in or create an account to view contract details and download result documents.