Starter Motor Assy,Gear Lever Kit,Gear Lever Shaft,Gear Lever Bearing,Gear Box Assy
Indian Army
FARIDKOT, PUNJAB
Bid Publish Date
26-Oct-2025, 5:51 pm
Bid End Date
05-Nov-2025, 6:00 pm
Location
Progress
Quantity
18
Category
Brake Chamber Kit
Bid Type
Two Packet Bid
Organization: Indian Army, Department Of Military Affairs. Procurement scope includes multiple vehicle components such as Brake Chamber Kit, Kick Starter Lever Assy, Brake Adjusiter Lever, Shackle Pin Gear Lever, Gear Lever Kit, Silencer Assy, Steering Universal Joint, Air Filter, Door Glass RH, Fuel Filter, Wiper Water Supply Pipe, Steering Tie Rod End, Yoke Gear Box, Steering Box End. No explicit start/end dates or estimated value provided. BOQ indicates 15 total items with 15 line items yet no quantities shown. The buyer imposes a flexible quantity clause; up to 25% quantity variation during contract and during delivery extensions, with calculation formula and minimum 30 days extra time. This tender lacks technical specifications in the data but signals a government procurement for automotive spares, potentially requiring OEMs or approved suppliers of military-grade parts. The key differentiator is the option clause enabling quantity adjustments at contracted rates, highlighting a variable-demand procurement model for the DMA. Unique aspect: emphasis on a broad set of components across mechanical and automotive subsystems, possibly requiring cross-compatibility and quality controls aligned to military standards.
Product/service names: Brake Chamber Kit, Kick Starter Lever Assy, Brake Adjusuter Lever, Shackle Pin Gear Lever, Gear Lever Kit, Silencer Assy, Steering Universal Joint, Air Filter, Door Glass RH, Fuel Filter, Wiper Water Supply Pipe, Steering Tie Rod End, Yoke Gear Box, Steering Box End
Quantities: Not disclosed in BOQ
Estimated value: Not disclosed
Experience: Not specified
Quality/standards: Not specified in data
Quantity variation up to 25% with bid and contract
Delivery period adjustments based on formula with minimum 30 days
No explicit EMD amount or start/end dates provided
Not specified in the data provided
Delivery period extends from last date of original delivery order; additional time = (Increased quantity / Original quantity) × Original delivery period, minimum 30 days
Not specified in the data provided
No explicit eligibility criteria listed; bidders should satisfy standard government procurement prerequisites
Possession of OEM authorizations may be required for automotive spare parts
Capability to scale delivery to 25% quantity variation
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
FARIDKOT, PUNJAB
Indian Army
ALLAHABAD, UTTAR PRADESH
Indian Army
DIMAPUR, NAGALAND
Indian Army
GURDASPUR, PUNJAB
Indian Army
DIMAPUR, NAGALAND
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | Brake Chamber Kit | Brake Chamber Kit | 2 | nos | pradeepyadav@856 | 15 |
| 2 | Kick Starter Lever Assy | Kick Starter Lever Assy | 1 | nos | pradeepyadav@856 | 15 |
| 3 | Brake Adjsuter Lever | Brake Adjsuter Lever | 1 | nos | pradeepyadav@856 | 15 |
| 4 | Shackle Pin Gear Lever | Shackle Pin Gear Lever | 1 | nos | pradeepyadav@856 | 15 |
| 5 | Gear Lever Kit | Gear Lever Kit | 1 | nos | pradeepyadav@856 | 15 |
| 6 | Silencer Assy | Silencer Assy | 1 | nos | pradeepyadav@856 | 15 |
| 7 | Strg Universal Joint | Strg Universal Joint | 1 | nos | pradeepyadav@856 | 15 |
| 8 | Air Filter | Air Filter | 1 | nos | pradeepyadav@856 | 15 |
| 9 | Door Glass RH | Door Glass RH | 1 | nos | pradeepyadav@856 | 15 |
| 10 | Fuel Filter | Fuel Filter | 1 | nos | pradeepyadav@856 | 15 |
| 11 | Wiper Water Supply Pipe | Wiper Water Supply Pipe | 1 | nos | pradeepyadav@856 | 15 |
| 12 | Strg Tie Rod End | Strg Tie Rod End | 3 | nos | pradeepyadav@856 | 15 |
| 13 | Yoke Gear Box | Yoke Gear Box | 1 | nos | pradeepyadav@856 | 15 |
| 14 | Strg Universal Joint | Strg Universal Joint | 1 | nos | pradeepyadav@856 | 15 |
| 15 | Strg Box End | Strg Box End | 1 | nos | pradeepyadav@856 | 15 |
GST registration
PAN card
Experience certificates
Financial statements
EMD/Security deposit documents
Technical bid documents
OEM authorizations (if applicable)
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | KAMLESH TRADING CO Under PMA | - | 03-11-2025 13:22:24 | Qualified |
| 2 | MAHAKAL TRADERS Under PMA | - | 03-11-2025 16:57:09 | Qualified |
| 3 | SWATI ENTERPRISE Under PMA | - | 04-11-2025 07:37:05 | Qualified |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | MAHAKAL TRADERS(MSE)( MSE Social Category:General ) Under PMA | ₹44,075 | Item Categories : Brake Chamber Kit,Kick Starter Lever Assy,Brake Adjsuter Lever,Shackle Pin Gear Lever,Gear Lever Ki |
| L2 | KAMLESH TRADING CO (MSE)( MSE Social Category:General ) Under PMA | ₹47,552 | Item Categories : Brake Chamber Kit,Kick Starter Lever Assy,Brake Adjsuter Lever,Shackle Pin Gear Lever,Gear Lever Ki |
| L3 | SWATI ENTERPRISE (MSE)( MSE Social Category:General ) Under PMA | ₹48,481 | Item Categories : Brake Chamber Kit,Kick Starter Lever Assy,Brake Adjsuter Lever,Shackle Pin Gear Lever,Gear Lever Ki |
Key insights about WEST BENGAL tender market
Bidders should prepare standard documents (GST, PAN, financials, experience) and demonstrate OEM authorization where required. The tender allows a 25% quantity variation and requires readiness to scale delivery. Ensure compliance with general government procurement norms and submit technical and financial bids as per DMA guidelines.
Required documents include GST registration, PAN, experience certificates for similar supply, financial statements, EMD/Security deposit evidence, technical bid, and OEM authorizations if applicable. Ensure all documents align with DMA tender submission standards and are valid at the time of bid opening.
Delivery terms allow up to 25% variation in quantity. The schedule starts from the last date of the original delivery order; additional time is calculated as (increased quantity/original quantity) × original delivery period, with a minimum extension of 30 days.
The list covers Brake Chamber Kit, Kick Starter Lever Assembly, Brake Adjusiter Lever, Shackle Pin Gear Lever, Gear Lever Kit, Silencer Assembly, Steering Universal Joint, Air Filter, Door Glass RH, Fuel Filter, Wiper Water Supply Pipe, Steering Tie Rod End, Yoke Gear Box, and Steering Box End.
The data provided does not disclose an estimated value or EMD amount. Bidders should monitor DMA communications or the official tender portal for updates on estimated value, quantity bands, and EMD requirements.
No specific standards or certifications are listed in the provided data. Bidders should be prepared to supply OEM authorizations and comply with general government procurement quality expectations, potentially including ISO/IS standards and vehicle-part certifications as applicable.
Delivery extensions commence from the last date of the original delivery order. If the option clause is exercised, extended delivery time uses the formula stated, with a minimum 30-day extension, ensuring continued supply despite quantity fluctuations.
Obtain official OEM authorization letters, verify part numbers with OEM catalogs, and attach authorization certificates to the technical bid. DMA may require direct supplier eligibility validation, ensuring parts are genuine and compatible with Army vehicles.
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS