Bid Publish Date
23-May-2025, 1:10 pm
Bid End Date
28-Aug-2025, 9:00 am
Location
Progress
Quantity
6
Category
ITEM NO-1 AUTO ACTUATED HIGH VELOCITY SPRAY SYSTEM TRANSFORMER TR-021 AS PER ATC PAGE NO-23
Bid Type
Two Packet Bid
Public procurement opportunity for Bridge And Roof Company (india) Limited ITEM NO-1 AUTO ACTUATED HIGH VELOCITY SPRAY SYSTEM TRANSFORMER TR-021 AS PER ATC PAGE NO-23, ITEM NO- 2 AUTO ACTUATED HIGH VELOCITY SPRAY SYSTEM TRANSFORMER TR-022 AS PER ATC PAGE NO-23, ITEM NO- 3 AS PER ATC PAGE NO-23, ITEM NO-4 MANDATORY SPARES AS PER ATC PAGE NO-23, ITEM NO-5 MANDATORY SPARES AS PER ATC PAGE NO-23 in DARJEELING, WEST BENGAL. Quantity: 6 issued by. Submission Deadline: 28-08-2025 09: 00: 00. View full details and respond.
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
ITEM NO-1 AUTO ACTUATED HIGH VELOCITY SPRAY SYSTEM TRANSFORMER TR-021 AS PER ATC PAGE NO-23 , ITEM NO- 2 AUTO ACTUATED HIGH VELOCITY SPRAY SYSTEM TRANSFORMER TR-022 AS PER ATC PAGE NO-23 , ITEM NO- 3 AS PER ATC PAGE NO-23 , ITEM NO-4 MANDATORY SPARES AS PER ATC PAGE NO-23 , ITEM NO-5 MANDATORY SPARES AS PER ATC PAGE NO-23
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
ITEM NO-1 AUTO ACTUATED HIGH VELOCITY SPRAY SYSTEM TRANSFORMER TR-021 AS PER ATC PAGE NO-23
DESIGN ENGINEERING PROCUREMENT TESTING SUPPLY OF ALL MATERIALS AND EQUIPMENT AND TOOLS TACKLES SPECIFICATIONS DRAWINGS DATA SHEETS ETC. FOR AUTO ACTUATED HIGH VELOCITY SPRAY SYSTEM ON TRANSFORMERS INCLUDING TAKING APPROVAL OF THE COMPLETE SYSTEM FROM TAC ACCREDITED AGENCY ANY OTHER AGENCY APPOINTED BY INSURANCE COMPANY CLIENT SUPERVISION ASSISTANCE FOR INSTALLATION PRE- COMMISSIONING COMMISSIONING AND ANY OTHER ACTIVITY REQUIRED TO COMPLETE THE WORKS IN ALL RESPECTS INCLUDING PERFORMANCE GUARANTEE RUN HANDING OVER TO CLIENT IN CONNECTION WITH SILIGURI MAKETING TERMINAL AUGMENTATION PROJECT AT NUMALIGARH REFINERY LIMITED SILIGURI WEST BENGAL
ITEM NO-2 AUTO ACTUATED HIGH VELOCITY SPRAY SYSTEM TRANSFORMER TR-022 AS PER ATC PAGE NO-23
DESIGN ENGINEERING PROCUREMENT TESTING SUPPLY OF ALL MATERIALS AND EQUIPMENT AND TOOLS TACKLES SPECIFICATIONS DRAWINGS DATA SHEETS ETC. FOR AUTO ACTUATED HIGH VELOCITY SPRAY SYSTEM ON TRANSFORMERS INCLUDING TAKING APPROVAL OF THE COMPLETE SYSTEM FROM TAC ACCREDITED AGENCY ANY OTHER AGENCY APPOINTED BY INSURANCE COMPANY CLIENT SUPERVISION ASSISTANCE FOR INSTALLATION PRE- COMMISSIONING COMMISSIONING AND ANY OTHER ACTIVITY REQUIRED TO COMPLETE THE WORKS IN ALL RESPECTS INCLUDING PERFORMANCE GUARANTEE RUN HANDING OVER TO CLIENT IN CONNECTION WITH SILIGURI MAKETING TERMINAL AUGMENTATION PROJECT AT NUMALIGARH REFINERY LIMITED SILIGURI WEST BENGAL
ITEM NO-3 AS PER ATC PAGE NO-23
TPI CHARGES FOR BOTH ITEM A AND ITEM B
ITEM NO-4 MANDATORY SPARES AS PER ATC PAGE NO-23
10 PERCENT SPRAY NOZZLE EACH TYPE AND QUARTZOID BULB DETCETOR FOR TR-021
ITEM NO-5 MANDATORY SPARES AS PER ATC PAGE NO-23
10 PERCENT SPRAY NOZZLE EACH TYPE AND QUARTZOID BULB DETCETOR FOR TR-022
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | ITEM NO-1 AUTO ACTUATED HIGH VELOCITY SPRAY SYSTEM TRANSFORMER TR-021 AS PER ATC PAGE NO-23 | DESIGN ENGINEERING PROCUREMENT TESTING SUPPLY OF ALL MATERIALS AND EQUIPMENT AND TOOLS TACKLES SPECIFICATIONS DRAWINGS DATA SHEETS ETC. FOR AUTO ACTUATED HIGH VELOCITY SPRAY SYSTEM ON TRANSFORMERS INCLUDING TAKING APPROVAL OF THE COMPLETE SYSTEM FROM TAC ACCREDITED AGENCY ANY OTHER AGENCY APPOINTED BY INSURANCE COMPANY CLIENT SUPERVISION ASSISTANCE FOR INSTALLATION PRE- COMMISSIONING COMMISSIONING AND ANY OTHER ACTIVITY REQUIRED TO COMPLETE THE WORKS IN ALL RESPECTS INCLUDING PERFORMANCE GUARANTEE RUN HANDING OVER TO CLIENT IN CONNECTION WITH SILIGURI MAKETING TERMINAL AUGMENTATION PROJECT AT NUMALIGARH REFINERY LIMITED SILIGURI WEST BENGAL | 1 | ls | [email protected] | 90 | |
| 2 | ITEM NO-2 AUTO ACTUATED HIGH VELOCITY SPRAY SYSTEM TRANSFORMER TR-022 AS PER ATC PAGE NO-23 | DESIGN ENGINEERING PROCUREMENT TESTING SUPPLY OF ALL MATERIALS AND EQUIPMENT AND TOOLS TACKLES SPECIFICATIONS DRAWINGS DATA SHEETS ETC. FOR AUTO ACTUATED HIGH VELOCITY SPRAY SYSTEM ON TRANSFORMERS INCLUDING TAKING APPROVAL OF THE COMPLETE SYSTEM FROM TAC ACCREDITED AGENCY ANY OTHER AGENCY APPOINTED BY INSURANCE COMPANY CLIENT SUPERVISION ASSISTANCE FOR INSTALLATION PRE- COMMISSIONING COMMISSIONING AND ANY OTHER ACTIVITY REQUIRED TO COMPLETE THE WORKS IN ALL RESPECTS INCLUDING PERFORMANCE GUARANTEE RUN HANDING OVER TO CLIENT IN CONNECTION WITH SILIGURI MAKETING TERMINAL AUGMENTATION PROJECT AT NUMALIGARH REFINERY LIMITED SILIGURI WEST BENGAL | 1 | ls | [email protected] | 90 | |
| 3 | ITEM NO-3 AS PER ATC PAGE NO-23 | TPI CHARGES FOR BOTH ITEM A AND ITEM B | 2 | ls | [email protected] | 90 | |
| 4 | ITEM NO-4 MANDATORY SPARES AS PER ATC PAGE NO-23 | 10 PERCENT SPRAY NOZZLE EACH TYPE AND QUARTZOID BULB DETCETOR FOR TR-021 | 1 | ls | [email protected] | 90 | |
| 5 | ITEM NO-5 MANDATORY SPARES AS PER ATC PAGE NO-23 | 10 PERCENT SPRAY NOZZLE EACH TYPE AND QUARTZOID BULB DETCETOR FOR TR-022 | 1 | ls | [email protected] | 90 |
Discover companies most likely to bid on this tender
Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Extended Deadline
28-Aug-2025, 9:00 am
Opening Date
28-Aug-2025, 9:30 am
Extended Deadline
23-Aug-2025, 9:00 am
Opening Date
23-Aug-2025, 9:30 am
Extended Deadline
14-Aug-2025, 9:00 am
Opening Date
14-Aug-2025, 9:30 am
Extended Deadline
01-Aug-2025, 12:00 pm
Opening Date
01-Aug-2025, 12:30 pm
Extended Deadline
18-Jul-2025, 12:00 pm
Opening Date
18-Jul-2025, 12:30 pm
Extended Deadline
05-Jul-2025, 1:00 pm
Opening Date
05-Jul-2025, 1:30 pm
Extended Deadline
27-Jun-2025, 1:00 pm
Opening Date
27-Jun-2025, 1:30 pm
Extended Deadline
20-Jun-2025, 12:00 pm
Opening Date
20-Jun-2025, 12:30 pm
Key insights about WEST BENGAL tender market
The eligibility requirements for interested bidders include being a registered entity with a valid business license. Bidders must demonstrate compliance with local procurement laws and possess technical capabilities that reflect previous successful projects in the field. Submissions should include proof of registration and any relevant industry certifications.
The technical specifications require that the Auto Actuated High Velocity Spray Systems meet industry standards for safety and performance. Bidders must ensure that their offered systems comply with specified parameters in the ATC documentation on page 23. Certification of quality standards is mandatory to proceed with the tender evaluation.
The payment terms will be clarified upon bid acceptance, commonly involving milestone-based payments linked to project delivery stages. Bidders should provide clarity in their financial proposals, ensuring they align with standard practices for debt recovery within the procurement framework.
The evaluation and selection process will involve a detailed review of technical and financial proposals. Bids will be assessed based on criteria such as cost-effectiveness, adherence to technical specifications, and delivery timelines. Transparency in scoring and methodology will ensure fair assessment during the tendering process.
MSEs will be provided with certain benefits such as relaxed eligibility norms and preferential pricing considerations. This encourages Make in India initiatives by fostering local talent and production, thereby supporting regional economic growth and sustainability in procurement practices.
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS