TenderDekho Logo
GEM

Mod Seclet Establishment Steel Storage Container Tender Department Of Defence, India 2026

Bid Publish Date

18-Feb-2026, 8:16 pm

Bid End Date

28-Feb-2026, 9:00 pm

Progress

Issue18-Feb-2026, 8:16 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

70

Bid Type

Two Packet Bid

Categories 2

Tender Overview

Mod Sectt Establishment of the Department Of Defence invites bids for the procurement of Steel Storage Containers. The contract scope includes Supply, Installation, Testing and Commissioning of the goods. The tender contemplates quantity adjustments up to 25% during procurement and contract execution, with rates fixed for contracted quantities. Delivery timelines hinge on the original delivery period and any extended period, calculated with a minimum 30-day floor. This procurement sits under the Government e-Market (GEM) portal framework and targets standardization of steel storage solutions used in defence logistics. The BOQ shows no listed items, indicating potential placeholder or generic scope pending finalization. Unique terms emphasize flexibility in quantity while maintaining contracted rates, a common feature for defence material handling equipment. The tender’s emphasis on supply-and-installation underscores a turnkey approach, potentially including on-site testing and commissioning. Key differentiators include the option clause and the obligation to adhere to delivery-time computations aligned with the extended period. The outcome will influence subsequent deployment of steel storage infrastructure within defence establishments. Overall, bidders should prepare to align with the option-quantity framework and readiness for installation and commissioning activities within the defence logistics ecosystem.

Key Specifications

    • Product: Steel Storage Container
    • Scope: Supply, Installation, Testing and Commissioning
    • Quantity flexibility: up to 25% change
    • Delivery timeline: based on (extra Qty / Original Qty) × Original delivery period, minimum 30 days
    • Standards: Not specified; ensure compatibility with defence storage requirements and safety norms
    • Certifications: Not specified; bidders should propose applicable quality/safety certifications

Terms & Conditions

  • Option clause allows ±25% quantity variation with contracted rates

  • Delivery period calculated with minimum 30 days extension

  • Scope includes supply, installation, testing and commissioning

Important Clauses

Payment Terms

Contracted rates apply; payment terms to be defined in final contract; EMD not disclosed

Delivery Schedule

Delivery timeframe tied to original delivery period with potential extension based on option clause

Penalties/Liquidated Damages

Not specified in available data; standard defence tenders typically include LD for delays

Bidder Eligibility

  • Experience in supplying steel storage containers or related defence logistics equipment

  • Financial capability to handle turnkey installation projects

  • Compliance with defence procurement norms and security considerations

Documents 3

GeM-Bidding-9009056.pdf

Main Document

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Steel storage shelving systems with plastic storage bins

Office Of Dg (aero)

BANGALORE, KARNATAKA

Posted: 20 February 2025
Closed: 13 March 2025
GEM

STEEL RACKS FOR STORAGE

Indian Air Force

COIMBATORE, TAMIL NADU

Posted: 16 September 2025
Closed: 29 September 2025
GEM

Indian Army Mild Steel Tiered Storage System Tender Jalandhar Punjab 2026 - 25% Quantity Option & Detailed Design Drawings

Indian Army

JALANDHAR, PUNJAB

Posted: 12 January 2026
Closed: 22 January 2026
GEM

STAINLESS STEEL WORKING TABLE WITH STORAGE

Bharat Electronics Limited (bel)

Posted: 11 November 2024
Closed: 22 November 2024
GEM

Indian Army Mild Steel Heavy Duty Storage Racks Tender Allahabad Uttar Pradesh 2026

Indian Army

ALLAHABAD, UTTAR PRADESH

Posted: 20 January 2026
Closed: 30 January 2026
GEM

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar steel storage/container projects

4

Audited financial statements for last 2-3 years

5

EMD payment proof (if applicable) and payment details

6

Technical bid documents and compliance certificates

7

OEM authorizations (if bidding as dealer/distributor)

8

Any relevant installation and commissioning certifications

Frequently Asked Questions

Key insights about ARUNACHAL PRADESH tender market

How to bid for steel storage container tender in defence sector 2026

Bidders must submit standard supplier documents (GST, PAN) and demonstrate capability for supply, installation, testing, and commissioning. The tender allows up to 25% quantity variation with contracted rates; ensure compliance with option-clause delivery calculations and provide installation plans within the defence logistics framework.

What documents are required for defence steel container bid 2026

Required documents typically include: GST certificate, PAN card, experience certificates for similar projects, audited financial statements, EMD proof, OEM authorizations if applicable, and technical bid/compliance certificates demonstrating capability for supply and on-site commissioning.

What are the technical specifications for steel storage containers in this GEM tender

No detailed technical specs were published. Bidders should align with standard steel storage container safety and durability practices and prepare documentation for supply, installation, testing, and commissioning. Propose conforming materials, corrosion resistance, and load-bearing capacity as per defence utility norms.

When is delivery expected under the 25% option clause for defence containers

Delivery extension is calculated as (Additional quantity ÷ Original quantity) × Original delivery period with a minimum of 30 days. Purchaser may extend delivery up to the original delivery period, so bidders should plan procurement and installation buffers accordingly.

What are the payment terms for supply of steel containers for defence

Payment terms are tied to final contract; the bid includes contracted rates for added quantities with delivery, installation, testing, and commissioning. Ensure you provide clear invoicing milestones aligned to commissioning completion and acceptance testing per defence standards.

What eligibility criteria apply to defence GEM tenders for storage equipment

Eligibility typically requires prior experience in similar projects, adequate financial capacity, GST registration, and compliance with security and quality standards. Bidders should also demonstrate ability to perform turnkey installation and testing within defence infrastructure contexts.

What is the scope of work for this steel container tender in defence

The scope encompasses Supply, Installation, Testing and Commissioning of steel storage containers. The contract contemplates quantity flex, with rates fixed for contracted quantities; installation and commissioning imply on-site work and acceptance testing following delivery.

Which location is this defence steel container tender targeted for

The tender is issued under the Defence sector via GEM; location details are not disclosed in available data. Bidders should anticipate deployment across defence storage facilities and align logistics and installation plans to centralized procurement guidelines.