TenderDekho Logo
Closed GEM

Bids are Invited For AIR CIRCUT BREAKER ASSY. TYPE,FIXED CONTACT,MOVING CONTACT,MOVING CONTACT CARRIER,FIXED CONTACT CAR in BARDHAMAN, WEST BENGAL

Bid Publish Date

03-Aug-2026, 4:47 pm

Bid End Date

24-Aug-2026, 5:00 pm

Progress

Issue03-Aug-2026, 4:47 pm
AwardPending

Eastern Coalfields Limited has released a public tender for AIR CIRCUT BREAKER ASSY. TYPE, FIXED CONTACT, MOVING CONTACT, MOVING CONTACT CARRIER, FIXED CONTACT CARRIER, ARC CHUTE, SHUNT TRIP COIL UNDER VOLTAGE COIL, CONTROL PANEL ASSY, TEST MICRO SWITCH, ISOLATOR ON OFF HEAVY DUTY, AUXILLIARY TRANSFORMER, EARTH LEAKAGE RELAY 750 MA, AMMETER, THROUGHGOING CABLE BOX in BARDHAMAN, WEST BENGAL. Quantity: 51. Submission Deadline: 24-08-2026 17: 00: 00. Download documents and apply online.

Authority & Contact

Office Name

West Bengal

Grievance Contact

[email protected]

Tender Data

Bid Details

Quantity

51

Category

CONTROL PANEL ASSY

Bid Type

Two Packet Bid

Bid Validity

120 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

3 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Past Performance

10 %

Warranty Period

3 days

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

AIR CIRCUT BREAKER ASSY. TYPE , FIXED CONTACT , MOVING CONTACT , MOVING CONTACT CARRIER , FIXED CONTACT CARRIER , ARC CHUTE , SHUNT TRIP COIL UNDER VOLTAGE COIL , CONTROL PANEL ASSY , TEST MICRO SWITCH , ISOLATOR ON OFF HEAVY DUTY , AUXILLIARY TRANSFORMER , EARTH LEAKAGE RELAY 750 MA , AMMETER , THROUGHGOING CABLE BOX

Payment Timelines

Payments shall be made to the Seller within 21 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

Paschim Bardhaman

Delivery Pincodes

713362

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Patel Hiteshkumar Amratlal713362,Office of GM, Kunustoria Area Topsi Puschim BardhamanPaschim BardhamanWest Bengal713362215-

Authority Records

MINISTRY OF COALCOAL INDIA LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9701736.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 14 Items Sign in for GEM prices

#1

AIR CIRCUT BREAKER ASSY. TYPE

CB200B CB/84

2 nos Delivery: 15 days
#2

FIXED CONTACT

CB200B1

6 nos Delivery: 15 days
#3

MOVING CONTACT

CB200B2

6 nos Delivery: 15 days
#4

MOVING CONTACT CARRIER

CB200B3

6 nos Delivery: 15 days
#5

FIXED CONTACT CARRIER

CB200B4

6 nos Delivery: 15 days
#6

ARC CHUTE

CB200B5

6 nos Delivery: 15 days
#7

SHUNT TRIP COIL UNDER VOLTAGE COIL

CB200B15

2 nos Delivery: 15 days
#8

CONTROL PANEL ASSY

CB200C1N W/T SHUNT TRIP COIL

3 nos Delivery: 15 days
#9

TEST MICRO SWITCH

CB200C5

2 nos Delivery: 15 days
#10

ISOLATOR ON OFF HEAVY DUTY

CB200D1HD

2 nos Delivery: 15 days
#11

AUXILLIARY TRANSFORMER

CB200C1A CB/200C/1

2 nos Delivery: 15 days
#12

EARTH LEAKAGE RELAY 750 MA

CB200C3MA

2 nos Delivery: 15 days
#13

AMMETER

CB200D4

2 nos Delivery: 15 days
#14

THROUGHGOING CABLE BOX

CB200D7A4

4 nos Delivery: 15 days

Categories 25

Required Documents

1

Experience Criteria

2

Past Performance

3

Certificate (Requested in ATC)

4

OEM Authorization Certificate *In case any bidder is seeking exemption from Experience / Turnover Criteria

5

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer