TenderDekho Logo
Active GEM

Uttar Pradesh Power Corporation Limited Repair & Installation Tender UP - Electrical Systems & Semi Turnkey 2026

Bid Publish Date

24-Jul-2026, 12:19 pm

Bid End Date

03-Aug-2026, 3:00 pm

Value

₹10,00,000

Location

HAMIRPUR , UTTAR PRADESH

Progress

Issue24-Jul-2026, 12:19 pm
AwardPending
Explore all 6 tabs to view complete tender details

Quantity

1

Bid Type

Two Packet Bid

Key Highlights

  • CRITICAL brand/organization: Uttar Pradesh Power Corporation Limited (UPPCL) procurement
  • Critical scope: Repair, Maintenance, and Installation of Plant/Systems/Equipments (Version 2) - Commercial; Electrical System or Installation; Semi Turnkey
  • Estimated contract value: ₹1,000,000
  • Location detail: procurement under UP state energy sector; precise city not provided
  • ATC involvement: Buyer Uploaded ATC document governs terms and eligibility
  • No BOQ items listed (Total Items: 0); inspect ATC for itemized expectations
  • Delivery, payment, and warranty terms to be drawn from ATC and main tender documents
  • Documentation set: standard bidder submissions to be confirmed via ATC (GST, PAN, experience, financials)

Categories 3

Tender Overview

The opportunity is issued by Uttar Pradesh Power Corporation Limited (UPPCL) under the Energy Department Uttar Pradesh for the repair, maintenance, and installation of Plant/Systems/Equipments (Version 2) in the commercial category, with a proposed scope that covers electrical system installation activities and semi-turnkey delivery. The estimated procurement value is ₹1,000,000. The tender lacks explicit BOQ items (Total Items: 0) and does not specify a start or end date in the data provided. A linked ATC document is referenced, indicating there are buyer-specific terms governing participation. This tender is positioned as a specialized electrical services procurement requiring disciplined project execution and adherence to UPPCL’s tender terms. The absence of detailed specifications suggests bidders should review the ATC for scope, safety, and installation expectations before submitting proposals.

Technical Specifications & Requirements

  • Category/Scope: Repair, maintenance, and installation of plant and electrical systems; semi turnkey delivery; Version 2, Commercial.
  • Estimated Value: ₹1,000,000.
  • Location: Uttar Pradesh (state-level procurement program via UPPCL).
  • BOQ: Total Items: 0; no itemized quantities available in the data.
  • Standards/Documentation: Buyer-uploaded ATC document referenced; bidders must consult this for exact compliance, safety, and performance requirements.
  • Standards/Compliance: Not explicitly listed in the provided data; recommended to review ATC for specific standards and certification expectations.
  • Delivery/Execution: Details not specified; refer to ATC for schedule and installation milestones.
  • Experience/Capability: No explicit requirement in the data; ATC may contain eligibility criteria.

Terms, Conditions & Eligibility

  • EMD/SD: Not specified in the available data; confirm in ATC or tender documents.
  • Delivery Timeline: Not explicitly stated in the data; ATC will define delivery and installation schedule.
  • Payment Terms: Not stated; expected to be defined in ATC and main tender documents.
  • Documents to Submit: Require examination of the Terms/Conditions; GST, PAN, experience certificates, financials, and technical bid may be required as per standard UPPCL practice.
  • ATC Reference: A Buyer Added ATC document is linked; bidders must review for exact eligibility criteria and compliance requirements.
  • Warranty/Penalties: Not specified in provided data; penalties or warranties would be defined in ATC.
  • Qualification: No explicit years of experience or turnover data in the data; ATC is the primary source for these criteria.

Key Specifications

  • Repair, maintenance, and installation of electrical plant/systems

  • Semi-turnkey approach under Version 2, commercial category

  • Estimated value ₹1,000,000

  • No BOQ items available (0 items listed in data)

  • ATC governs exact eligibility, safety, and compliance requirements

  • Review ATC for delivery timelines, warranty, penalties, and payment terms

Terms & Conditions

  • EMD and detailed payment terms to be confirmed in ATC

  • Delivery schedule and penalties to be defined in ATC

  • Documentation requirements hinge on ATC–review prior to bid submission

Important Clauses

Payment Terms

Details to be specified in Buyer Added ATC; bidders must review for advance/milestone payments and payment timelines

Delivery Schedule

Delivery and installation milestones to be defined in ATC; non-compliance penalties may apply per ATC

Penalties/Liquidated Damages

LD provisions will be defined in ATC; bidders should verify LD rate and cap before submission

Bidder Eligibility

  • Must review and satisfy terms in the Buyer Added ATC

  • Demonstrated experience in electrical plant repair/installation

  • Financial capacity to execute a ₹1,000,000 contract

Additional Tender Data

Commercial Details

Tender Category

Service

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - Commercial; Electrical System or Installation; Semi Turnkey

Advisory Bank

Bank of India

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of service delivery acceptance certificate (SDAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Delivery Locations

1

Delivery Cities

Hamirpur

Delivery Pincodes

210301

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Gyan Chandra Yadav210301,Electricity Distribution Circle, 33/11 Aman Saheed HamirpurHamirpurUttar Pradesh210301Project / Lumpsum Based-Estimated Cost of Spare/Consumable s/Items on Reimbursement basis in Rs (please input 0 if not applicable) : 10

Authority Records

ENERGY DEPARTMENTUTTAR PRADESH POWER CORPORATION LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 9

GeM-Bidding-9655754.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar electrical repair/installation projects

4

Financial statements or bank statements demonstrating financial capacity

5

EMD / security deposit documents (as specified in ATC)

6

Technical bid documents and certificates of compliance

7

OEM authorizations or warranties for electrical equipment (if required by ATC)

8

Any other documents specifically listed in the Buyer Added ATC

Frequently Asked Questions

How to bid in the UPPCL repair tender in Uttar Pradesh 2026 with semi turnkey scope

Bidders must review the Buyer Added ATC for eligibility criteria, and submit GST, PAN, experience certificates, and financial statements along with technical bid. The estimated value is ₹1,000,000; ensure compliance with ATC delivery, payment terms, and any OEM authorizations required.

What documents are required for UPPCL electrical maintenance tender in UP 2026

Prepare GST certificate, PAN card, at least one or more experience certificates for electrical repair projects, financial statements, and EMD as specified in the ATC. Include technical compliance documents and OEM authorizations if mandated by the ATC.

What are the technical specifications for UPPCL electrical installation tender 2026

Official technical specs are defined in the Buyer Added ATC; the data provided lists no BOQ items and relies on ATC for exact scope, safety standards, and performance criteria. Review the ATC thoroughly to confirm equipment, standards, and installation procedures.

When is the delivery schedule for UPPCL semi turnkey project in UP

Delivery timelines are specified in the ATC; no dates appear in the data. Bidders should extract precise milestones, installation completion targets, and acceptance criteria from the ATC to align bids and prove schedule capability.

What are the payment terms for the UPPCL electrical services contract

Payment terms will be described in the ATC; typical arrangements may include milestone-based payments or progress payments following acceptance. Verify advance, running, and final payments, plus any penalties for late delivery in the ATC.

What eligibility criteria must electrical contractors meet for UPPCL UP tender 2026

Eligibility is defined in the ATC and standard UPPCL practices; bidders should demonstrate prior electrical repair/installation experience, financial stability, and compliance with GST/PAN requirements. OEM authorizations may be required depending on equipment in scope.

How to verify the ATC requirements for UPPCL energy department tender

Access the Buyer Added ATC linked to the tender to view exact eligibility, warranties, warranties, safety standards, and penalties. Ensure your organization can meet all conditions before bid submission and prepare all documents accordingly.

What is the estimated contract value for the UP electrical works tender 2026

The tender estimates the value at ₹1,000,000 for repair, maintenance, and installation of electrical plant/systems under a semi turnkey approach. Align your bid with this value and ensure quotes cover all scope defined in the ATC.