Indian Coast Guard Water Purification & Conditioning System AMC JAMNAGAR Gujarat 2025
Indian Coast Guard
JAMNAGAR, GUJARAT
Bid Publish Date
02-Jul-2026, 11:30 am
Bid End Date
06-Jul-2026, 12:00 pm
Location
Progress
Quantity
1
Bid Type
Two Packet Bid
The Central Board Of Excise And Customs (cbec) invites bids for Annual Maintenance Services of the Water Purification and Conditioning System (Version 2) — a potable water purification setup with an inbuilt water cooler. The scope covers PACKAGE-1: Water purifier and conditioning system maintenance involving basic servicing. The tender references a single package with unspecified start/end dates, and no listed estimated value or EMD. This procurement targets vendors capable of routine preventive maintenance and fault rectification for municipal-grade water purification units within government frameworks. Key differentiator lies in Version 2 compliance and ongoing service coverage for the potable system.
Scope: Annual maintenance for potable water purification system with inbuilt cooler (Version 2)
Package-1: Water purifier and conditioning system maintenance involving basic servicing
No explicit technical measurements or standards provided in data
ATC document will define eligibility, timelines, and submission details
Targeted capability: routine service, fault diagnosis, calibration for government water systems
EMD amount and payment terms to be defined in ATC
Delivery timeline and service frequency to be specified in ATC
Submission requirements governed by Buyer Uploaded ATC document
Details to be provided in ATC; bidders should review for milestone payments and acceptance criteria
ATC will specify service windows, response times, and periodic maintenance cadence
Not specified in current data; ATC will cover LD terms, if any
Experience in maintenance of potable water purification systems
Capability to perform basic servicing and fault diagnosis
Compliance with ATC terms and government procurement standards
Tender Category
Service
Bid To RA
No
Bid To RA Enabled
No
Item Category
ANNUAL MAINTENANCE SERVICES FOR WATER PURIFICATION AND CONDITIONING SYSTEM (Version 2) - Potable water purification system with inbuilt water cooler.; 1; PACKAGE-1 : Water purifier and conditioning system maintenance involving basic servicing
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Coast Guard
JAMNAGAR, GUJARAT
E-municipalities - Eservices To Citizens And Employees Of Urban Local Bodies Of Uttar Pradesh
SHRAWASTI, UTTAR PRADESH
Indian Navy
SOUTH GOA, GOA
Aligarh Muslim University (amu)
ALIGARH, UTTAR PRADESH
Aligarh Muslim University (amu)
ALIGARH, UTTAR PRADESH
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for water purification system maintenance
Financial statements (last 2-3 years)
EMD/Security deposit documentation (as per ATC guidance)
Technical bid documents and method statements
OEM authorizations or certifications (if required by ATC)
Any site-specific work orders or maintenance licenses referenced in ATC
Bidders should first review the ATC document uploaded by the buyer to understand scope, timelines, and submission requirements. Prepare documents like GST, PAN, experience certificates, financials, and OEM authorizations. Ensure compliance with Version 2 maintenance scope for PACKAGE-1 and submit through the designated portal.
Required documents include GST certificate, PAN card, recent experience certificates in potable water purification maintenance, financial statements, and EMD documentation as per ATC. Technical bid documents and OEM authorizations may be needed; ensure they reflect Version 2 compliance and package scope.
The tender specifies Annual Maintenance Services for a potable water purification system with inbuilt cooler (Version 2). Detailed technical specs will be in the ATC. Focus on routine servicing, fault diagnosis, calibration, and preventive maintenance as part of PACKAGE-1 scope.
The current data does not reveal dates. The ATC will define service cadence, response times, and periodic maintenance windows once published. Bidders should monitor the ATC for delivery milestones and scheduling obligations tied to PACKAGE-1 maintenance.
Payment terms are not disclosed in the provided data. The ATC is expected to specify milestone-based or periodic payments for Annual Maintenance Services. Bidder should confirm interim payments and final settlement timelines within the ATC document.
Eligibility includes demonstrated capability in potable water system maintenance, adherence to government procurement processes, and submission of all mandatory documents (GST, PAN, experience, financials) as per ATC. OEM authorizations may be required for PACKAGE-1 components.
Prepare a complete bid package including technical and financial bids, ensure all documents align with ATC requirements, and submit via the designated portal. Review OEM authorizations, deliverables for PACKAGE-1, and ensure compliance with Version 2 maintenance guidelines.
N/a
📍 UNNAO, UTTAR PRADESH
Dg Of Defence Estate
📍 KOLKATA, WEST BENGAL
N/a
📍 BHAVNAGAR, GUJARAT
Central Board Of Direct Taxes (cbdt)
📍 NAGPUR, MAHARASHTRA
National Institute For Locomotor Disabilities
Sign up now to access all documents
Main Document
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS