Pilibhit Tiger Reserve Circle Solar PV Water Pumping Systems Tender Uttar Pradesh MNRE Q3 2025
Pilibhit Tiger Reserve Circle
PILIBHIT, UTTAR PRADESH
Progress
Quantity
1
Bid Type
Two Packet Bid
Odisha University Of Agriculture And Technology (ouat) announces a tender for Solar Photovoltaic Water Pumping Systems (V2) as per MNRE Specification (Q3) in KALAHANDI, ODISHA. Quantity: 1. Submission Deadline: 31-03-2026 18: 00: 00. Last date to apply is approaching fast!
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Solar Photovoltaic Water Pumping Systems (V2) as per MNRE Specification (Q3)
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
CATALOG Specification
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Pilibhit Tiger Reserve Circle
PILIBHIT, UTTAR PRADESH
N/a
KHERI, UTTAR PRADESH
N/a
BHANDARA, MAHARASHTRA
Navsari Agricultural University Navsari
NAVSARI, GUJARAT
Bhandara District Panchayats
BHANDARA, MAHARASHTRA
Tender Results
Loading results...
| Category | Specification | Requirement |
|---|---|---|
| Generic | Conformity of the specification | As per the attached MNRE specifications |
| Performance Parameter | Type of Solar Pumping System | Shallow Well (Surface) Solar Pumping Systems with D.C. Motor /PMSM/SRM, Shallow Well (Surface) Solar Pumping Systems with A.C. Induction Motor, Solar Deep Well (Submersible) Pumping Systems with D.C. Motor /PMSM/SRM, Solar Deep Well (Submersible) Pumping Systems with A.C. Induction Motor |
| Performance Parameter | Model Number of SPV Water Pumping System | Model-1, Model-2, Model-3, Model-4, Model-5, Model-6, Model-7, Model-8, Model-9, Model-10, Model-11, Model-12, Model-13, Model-14, Model-15, Model-16, Model-17, Model-18, Model-19, Model-20, Model-21, Model-22, Model-23, Model-24, Model-25, Model-26, Model-27, Model-28, Model-29, Model-30, Model-31, Model-32, Model-33, Model-34, Model-35, Model-36, Model-37, Model-38, Model-39 |
| Performance Parameter | Power of Solar Photovoltaic (PV) Array [in Watt-peak(Wp)] | 900, 1800, 2700, 4800, 6750, 9000, 11250, 18000, 20250, 22500, 13500, 15750, 1200, 3000 |
| Performance Parameter | Motor Pump-Set Capacity (in HP) | 1, 2, 3, 5, 7.5, 10, 12.5, 20, 22.5, 25, 15, 17.5 |
| Performance Parameter | Shut Off Dynamic Head (in meters) | 12, 25, 45, 100, 150, 70, 180, 225, 300, 375 |
| Performance Parameter | Water Output (in Liters per day) | 42000 (from a total head of 30 meters), 42000 (from a total head of 70 meters), 43200 (from a total head of 100 meters), 45000 (from a total head of 70 meters), 45600 (from a total head of 30 meters), 50400 (from a total head of 100 meters), 60750 (from a total head of 100 meters), 63000 (from a total head of 30 meters), 63000 (from a total head of 50 meters), 67200 (from a total head of 70 meters), 68400 (from a total head of 30 meters), 69000 (from a total head of 50 meters), 70875 (from a total head of 100 meters), 72000 (from a total head of 70 meters), 75375 (from a total head of 150 meters), 81000 (from a total head of 100 meters), 81000 (from a total head of 250 meters), 84375 (from a total head of 150 meters), 89100 (from a total head of 10 meters), 90000 (from a total head of 200 meters), 90000 (from a total head of 250 meters), 90450 (from a total head of 150 meters), 91125 (from a total head of 250 meters), 94500 (from a total head of 70 meters), 94500 (from a total head of 100 meters), 95625 (from a total head of 120 meters), 99000 (from a total head of 10 meters), 99000 (from a total head of 200 meters), 100800 (from a total head of 50 meters), 105000 (from a total head of 30 meters), 101250 (from a total head of 70 meters), 101250 (from a total head of 100 meters), 101250 (from a total head of 150 meters), 101250 (from a total head of 200 meters), 101250 (from a total head of 250 meters), 105525 (from a total head of 150 meters), 106875 (from a total head of 120 meters), 110400 (from a total head of 50 meters), 111375 (from a total head of 200 meters), 112500 (from a total head of 200 meters), 114000 (from a total head of 30 meters), 114750 (from a total head of 120 meters), 118125 (from a total head of 100 meters), 118125 (from a total head of 150 meters), 120600 (from a total head of 150 meters), 121500 (from a total head of 100 meters), 123750 (from a total head of 200 meters), 126000 (from a total head of 70 meters), 128250 (from a total head of 120 meters), 132300 (from a total head of 20 meters), 133875 (from a total head of 120 meters), 135000 (from a total head of 70 meters), 135000 (from a total head of 150 meters), 135675 (from a total head of 150 meters), 141750 (from a total head of 50 meters), 141750 (from a total head of 100 meters), 148500 (from a total head of 20 meters), 149625 (from a total head of 120 meters), 150750 (from a total head of 150 meters), 151875 (from a total head of 150 meters), 153000 (from a total head of 120 meters), 155250 (from a total head of 50 meters), 157500 (from a total head of 70 meters), 162000 (from a total head of 100 meters), 165375 (from a total head of 100 meters), 168000 (from a total head of 30 meters), 168750 (from a total head of 70 meters), 168750 (from a total head of 150 meters), 171000 (from a total head of 120 meters), 172125 (from a total head of 120 meters), 178200 (from a total head of 10 meters), 182250 (from a total head of 100 meters), 182400 (from a total head of 30 meters), 189000 (from a total head of 50 meters), 189000 (from a total head of 70 meters), 189000 (from a total head of 100 meters), 191250 (from a total head of 120 meters), 192375 (from a total head of 120 meters), 198000 (from a total head of 10 meters), 202500 (from a total head of 70 meters), 202500 (from a total head of 100 meters), 207000 (from a total head of 50 meters), 212625 (from a total head of 100 meters), 213750 (from a total head of 120 meters), 220500 (from a total head of 70 meters), 235200 (from a total head of 20 meters), 236250 (from a total head of 30 meters), 236250 (from a total head of 50 meters), 236250 (from a total head of 70 meters), 236250 (from a total head of 100 meters), 252000 (from a total head of 70 meters), 256500 (from a total head of 30 meters), 264000 (from a total head of 20 meters), 267300 (from a total head of 10 meters), 270000 (from a total head of 70 meters), 283500 (from a total head of 50 meters), 283500 (from a total head of 70 meters), 297000 (from a total head of 10 meters), 303750 (from a total head of 70 meters), 315000 (from a total head of 30 meters), 315000 (from a total head of 70 meters), 330750 (from a total head of 20 meters), 330750 (from a total head of 50 meters), 337500 (from a total head of 70 meters), 342000 (from a total head of 30 meters), 371250 (from a total head of 20 meters), 378000 (from a total head of 50 meters), 393750 (from a total head of 30 meters), 441000 (from a total head of 20 meters), 425250 (from a total head of 50 meters), 465750 (from a total head of 50 meters), 472500 (from a total head of 30 meters), 472500 (from a total head of 50 meters), 475200 (from a total head of 10 meters), 495000 (from a total head of 20 meters), 517500 (from a total head of 50 meters), 528000 (from a total head of 10 meters), 551250 (from a total head of 20 meters), 551250 (from a total head of 30 meters), 630000 (from a total head of 30 meters), 661500 (from a total head of 20 meters ), 668250 (from a total head of 10 meters), 742500 (from a total head of 10 meters), 990000 (from a total head of 10 meters), 1113750 (from a total head of 10 meters), 1237500 (from a total head of 10 meters), 618750 (from a total head of 20 meters), 427500 (from a total head of 30 meters), 258750 (from a total head of 50 meters), 742500 (from a total head of 20 meters), 513000 (from a total head of 30 meters), 310500 (from a total head of 50 meters), 598500 (from a total head of 30 meters), 362250 (from a total head of 50 meters), 684000 (from a total head of 30 meters), 414000 (from a total head of 50 meters) |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
OEM Authorization Certificate
OEM Annual Turnover *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Extended Deadline
31-Mar-2026, 6:00 pm
Opening Date
31-Mar-2026, 6:30 pm
N/a
📍 HARDOI, UTTAR PRADESH
District Rural Development Agency Dahod
📍 DAHOD, GUJARAT
Hingoli District Panchayats
📍 HINGOLI, MAHARASHTRA
Hingoli District Panchayats
📍 HINGOLI, MAHARASHTRA
Pune District Panchayats
📍 PUNE, MAHARASHTRA
Sign up now to access all documents
Main Document
CATALOG Specification
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS