Progress
The Office Of Director General (Missiles) under the Defence Research & Development organization in Hyderabad, Telangana, seeks procurement of ULTRA ISOLATION TRANSFORMERS in three capacity options: 5 KVA, 10 KVA, and 20 KVA. The contract scope includes supply, installation, testing and commissioning, with on-site delivery at the DRDL Kanchanbagh complex in Hyderabad. Bidders must provide a Data Sheet aligned to offered products, and OEM authorization where applicable. The tender emphasizes OEM-certified installation personnel and inclusion of essential installation accessories within the bid price. A 25% quantity flex clause is available, affecting delivery timelines. No BOQ items are disclosed.
Scope: Supply, Installation, Testing and Commissioning (SITC) of ULTRA ISOLATION TRANSFORMERS
Capacities: 5 KVA, 10 KVA, 20 KVA
Delivery: On-site at DRDL, Kanchanbagh, Hyderabad
Data Sheet: Upload with bid; must match offered parameters
OEM authorization: Required when bidding via authorized distributor/reseller
25% quantity adjustment right by purchaser at order and during contract
On-site delivery and installation at DRDL Hyderabad
OEM-certified installation manpower and OEM authorization required
Not specified in available data; bids must reflect standard DRDL practice per ATC and Corrigendum
Delivery timelines governed by option clause; minimum extension time 30 days; commence from last date of original delivery order
Not specified in data; subject to contract terms and purchaser's extended delivery period rules
Bidder must have valid PAN and GSTIN
Data Sheet must align with offered product specifications
Installation to be performed by OEM-certified resource or OEM-authorized reseller
Quantity
8
Category
20 KVA ULTRA ISOLATION TRANSFORMER
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
Yes
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Warranty Period
1 years
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
5 KVA ULTRA ISOLATION TRANSFORMER , 10 KVA ULTRA ISOLATION TRANSFORMER , 20 KVA ULTRA ISOLATION TRANSFORMER
Advisory Bank
State Bank of India
ePBG Percentage
5%
ePBG Duration (Months)
18
Max Delivery Days
90
Delivery Locations
1
Delivery Cities
HYDERABAD
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | HYDERABAD | HYDERABAD | - | - | 4 | 90 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
PAN Card copy
GSTIN copy
Cancelled cheque copy
EFT Mandate
Data Sheet of offered transformer
OEM Manufacturer Authorization (for distributors/partners)
Installation capability proof (OEM-certified personnel)
Any certificates as per ATC/Corrigendum
Key insights about TELANGANA tender market
Bidders must submit PAN, GSTIN, cancelled cheque, EFT mandate, and a Data Sheet matching offered transformers. OEM authorization is mandatory for installation; submit OEM authorization and data sheet with bid. The scope includes SITC at DRDL, Kanchanbagh, Hyderabad, with a 25% quantity option and extended delivery rules.
Required documents include PAN, GSTIN, cancelled cheque, EFT mandate, OEM authorization if bidding through distributors, and the product Data Sheet. Ensure the Data Sheet aligns exactly with the transformer specifications offered and that installation is by OEM-certified personnel.
The tender requires OEM authorization and installation by OEM-certified personnel; data sheet verification is critical to avoid rejection. While specific standards are not listed, align with standard DRDL documentation practices and ensure certifications accompany the submission.
Delivery and commissioning are to be conducted at DOMR Main Building, DRDL, Kanchanbagh, Hyderabad, Telangana. The on-site SITC scope requires inclusion of all installation accessories and authorized installation personnel.
The purchaser may adjust quantity by up to 25%; delivery period will be recalculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum 30 days extension unless the original delivery period already exceeds 30 days.
Scope includes Supply, Installation, Testing and Commissioning of 5/10/20 KVA ULTRA ISOLATION TRANSFORMERS, plus all essential installation accessories required for successful commissioning, as per OEM and ATC/Corrigendum guidelines.
Bid rejection may occur if the Data Sheet does not match offered product specifications, required certificates are missing, or OEM authorization is absent for distributors, or installation is not performed by OEM-certified personnel.
Installation, testing and commissioning are embedded in SITC scope; activities must be conducted by OEM-certified personnel or OEM-authorized resellers, at DRDL Hyderabad, with the delivery timeline governed by the option clause and contract terms.