TenderDekho Logo
Active GEM

Open Tender for MMO Anode-1,Anode interconnecting cable,Reference Electrode,Reference Electrode cable,Ship Hull mod in KANNUR, KERALA

Bid Publish Date

03-Oct-2026, 10:28 am

Bid End Date

24-Oct-2026, 11:00 am

EMD

₹55,000

Progress

Issue03-Oct-2026, 10:28 am
AwardPending

Indian Navy announces a tender for MMO Anode-1, Anode interconnecting cable, Reference Electrode, Reference Electrode cable, Ship Hull model cathode, Sea water tank, ICCP on board Ship panel, PLC Allen -Bradely Micro 820, SCADA Optix studio software or higher, Software integration tools, Control Panel Enclosure, Auto Transformer Manual variac, Rectifier Unit, Digital Multimeter, DC Voltmeter, DC Ammeter, AC Voltmeter, Internal and external panel wiring and routing, Panel control Accessories and working model Charts, Industrial Rugged PC, UPS System in KANNUR, KERALA. Quantity: 26. Submission Deadline: 24-10-2026 11: 00: 00. Last date to apply is approaching fast!

Advertisement

Tender Data

Bid Details

Quantity

26

Category

MMO Anode-1

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

5 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

9

Warranty Period

2 years

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

MMO Anode-1 , Anode interconnecting cable , Reference Electrode , Reference Electrode cable , Ship Hull model cathode , Sea water tank , ICCP on board Ship panel , PLC Allen -Bradely Micro 820 , SCADA Optix studio software or higher , Software integration tools , Control Panel Enclosure , Auto Transformer Manual variac , Rectifier Unit , Digital Multimeter , DC Voltmeter , DC Ammeter , AC Voltmeter , Internal and external panel wiring and routing , Panel control Accessories and working model Charts , Industrial Rugged PC , UPS System

Advisory Bank

State Bank of India

ePBG Percentage

3%

ePBG Duration (Months)

28

Delivery Details

Max Delivery Days

45

Delivery Locations

1

Delivery Cities

KANNUR

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-KANNURKANNUR--445-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9933024.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Indian Navy

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 21 Items Sign in for GEM prices

#1

MMO Anode-1

As per SOR para 2 ser 1

4 nos Delivery: 45 days
#2

Anode interconnecting cable

As per SOR para 2 ser 2

1 set Delivery: 45 days
#3

Reference Electrode

As per SOR para 2 ser 3

2 nos Delivery: 45 days
#4

Reference Electrode cable

As per SOR para 2 ser 4

2 nos Delivery: 45 days
#5

Ship Hull model cathode

As per SOR para 2 ser 5

1 nos Delivery: 45 days
#6

Sea water tank

As per SOR para 2 ser 6

1 nos Delivery: 45 days
#7

ICCP on board Ship panel

As per SOR para 2 ser 7

1 nos Delivery: 45 days
#8

PLC Allen -Bradely Micro 820

As per SOR para 2 ser 8

1 nos Delivery: 45 days
#9

SCADA Optix studio software or higher

As per SOR para 2 ser 9

1 nos Delivery: 45 days
#10

Software integration tools

As per SOR para 2 ser 10

1 set Delivery: 45 days
#11

Control Panel Enclosure

As per SOR para 2 ser 11

1 nos Delivery: 45 days
#12

Auto Transformer Manual variac

As per SOR para 2 ser 12

1 nos Delivery: 45 days
#13

Rectifier Unit

As per SOR para 2 ser 13

1 nos Delivery: 45 days
#14

Digital Multimeter

As per SOR para 2 ser 14

1 nos Delivery: 45 days
#15

DC Voltmeter

As per SOR para 2 ser 15

1 nos Delivery: 45 days
#16

DC Ammeter

As per SOR para 2 ser 16

1 nos Delivery: 45 days
#17

AC Voltmeter

As per SOR para 2 ser 17

1 nos Delivery: 45 days
#18

Internal and external panel wiring and routing

As per SOR para 2 ser 18

1 set Delivery: 45 days
#19

Panel control Accessories and working model Charts

As per SOR para 2 ser 19

1 set Delivery: 45 days
#20

Industrial Rugged PC

As per SOR para 2 ser 20

1 set Delivery: 45 days
#21

UPS System

As per SOR para 2 ser 21

1 nos Delivery: 45 days

Categories 52

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Bidder Turnover

3

Certificate (Requested in ATC)

4

Additional Doc 1 (Requested in ATC)

5

Additional Doc 2 (Requested in ATC)

6

Additional Doc 3 (Requested in ATC)

7

Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

8

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Advertisement