Maint Preservation of components of Bailey Bridge CL 3 1A,Paint OG Make Berger Asian,Paint White Ma
Indian Army
SONITPUR, ASSAM
Progress
RAQuantity
5
Category
Removing of BAILEY BRIDGE WOODEN ACCESSORIES from stacking as per specification RFP
Bid Type
Two Packet Bid
The Indian Army, Department Of Military Affairs, invites bids for removal, ground arrangement, surface cleaning, dipping of Bailey Bridge wooden accessories in a 50:50 mix of used engine oil and creosote oil, and re-stacking as directed by AGE EM oblice GE EP Jodhpur. The scope includes supply, installation, testing, commissioning, operator training, and obtaining statutory clearances. The contract allows a 25% quantity fluctuation, with delivery terms extending from the original schedule. The bid targets work at GE EP Jodhpur and requires advance sample approval before bulk manufacture.
Scope includes removal, on-ground arrangement, cleaning, dipping in 50:50 used engine oil and creosote oil, and re-stacking
Dip composition: 50% used engine oil + 50% creosote oil
Delivery location: GE EP Jodhpur
Advance sample submission: within 5 days of contract award, approval within 5 days
Scope of supply: installation, testing, commissioning, operator training, statutory clearances
Quantity options: up to +25% during contract execution
Site: AGE EM oblice GE EP Jodhpur instruction-based operations
Option clause allows ±25% quantity variation at contract; delivery timing adjusts proportionally with minimum 30 days
Advance sample approval required within 5 days; bulk supply contingent on approved sample; potential replications if deviations
Delivery and installation at GE EP Jodhpur; includes testing, commissioning, and operator training
Not specified in available data; bidders should align with standard government procurement payment practices and contractual terms
Delivery commences from the last date of original delivery order; extended time for increased quantity calculated as (increased quantity ÷ original quantity) × original delivery period, minimum 30 days
Not detailed; follow generic LD terms typical to govt contracts; ensure compliance with advance sample deviations
Experience in handling Bailey Bridge wooden components or similar temporary bridge accessories
Capability to perform removal, arrangement, cleaning, dipping, and re-stacking per spec
Ability to supply with installation, testing, commissioning, operator training, and statutory clearances
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
SONITPUR, ASSAM
Indian Army
JODHPUR, RAJASTHAN
Indian Army
LUCKNOW, UTTAR PRADESH
Indian Army
MUZAFFARNAGAR, UTTAR PRADESH
Indian Navy
MUMBAI, MAHARASHTRA
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | Removing of BAILEY BRIDGE WOODEN ACCESSORIES from stacking as per specification RFP | Scope of works as per appx A attached last page RFP | 1 | job | janakiramanm | 60 |
| 2 | Arranging of BAILEY BRIDGE WOODEN ACCESSORIES on ground as per specification | Scope of works as per appx A attached last page RFP | 1 | job | janakiramanm | 60 |
| 3 | Cleaning of the surface of BAILEY BRIDGE WOODEN ACCESSORIES by with wire brush or other brush as per specification | Scope of works as per appx A attached last page RFP | 1 | job | janakiramanm | 60 |
| 4 | Dipping BAILEY BRIDGE WOODEN ACCESSORIES in the ration of 50 by 50 mixture of used engine oil and creosote oil as per specification | Scope of works as per appx A attached last page RFP | 1 | job | janakiramanm | 60 |
| 5 | Re stacking of BAILEY BRIDGE WOODEN ACCESSORIES as per directed by AGE EM oblice GE EP jodhpur | Scope of works as per appx A attached last page RFP | 1 | job | janakiramanm | 60 |
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar Bailey Bridge accessory handling projects
Financial statements or proof of financial stability
EMD submission documentation (as per buyer instruction, if applicable)
Technical bid documentation showing process capabilities
OEM authorizations or approvals for wooden accessory handling equipment
Advance sample submission plan and timeline
Extended Deadline
12-Feb-2026, 1:00 pm
Opening Date
12-Feb-2026, 1:30 pm
Start
13-Feb-2026, 2:00 pm
End
16-Feb-2026, 10:00 am
Duration: 68 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
These are the final prices after the reverse auction event. Prices may be lower than initial bids.
| Rank | Seller | Final Price | Item |
|---|---|---|---|
| L1 | SIDHI VINAYAK ENTERPRISES Under PMA Winner | ₹45,700 | Item Categories : Removing of BAILEY BRIDGE WOODEN ACCESSORIES from stacking as per specification RFP,Arranging of BA |
| L2 | M/S SUSHIL UDYOG Under PMA | ₹49,512 | Item Categories : Removing of BAILEY BRIDGE WOODEN ACCESSORIES from stacking as per specification RFP,Arranging of BA |
| L3 | B & Y ENTERPRISES Under PMA | ₹49,778 | Item Categories : Removing of BAILEY BRIDGE WOODEN ACCESSORIES from stacking as per specification RFP,Arranging of BA |
🎉 L1 Winner
SIDHI VINAYAK ENTERPRISES Under PMA
Final Price: ₹45,700
Key insights about RAJASTHAN tender market
Bidders must submit GST, PAN, experience certificates, financial statements, and EMD documents along with technical bids. Ensure advance sample is prepared within 5 days of award and obtain buyer approval within 5 days. Adhere to the 25% quantity option and site delivery at GE EP Jodhpur.
Required documents include GST certificate, PAN, experience certificates for similar work, financial statements, EMD details, OEM authorizations if applicable, technical bid documents, and an advance sample submission plan with timelines to secure bulk approval.
Wooden accessories must be dipped in a 50:50 mixture of used engine oil and creosote oil, with cleaning of surfaces by wire brush prior to dipping, and re-stacking as directed by AGE EM at GE EP Jodhpur.
The contractor must submit 1 advance sample within 5 days of award; buyer will approve or request modifications within 5 days; bulk supply follows approval without LD for buyer delays.
The Purchaser reserves the right to increase or decrease quantity up to 25 percent at the time of contract placement and during the contract currency, with delivery period adjusted accordingly.
Delivery, installation, and commissioning will be conducted at GE EP Jodhpur, with all operations following the specified directives from AGE EM and GE EP Jodhpur.
Scope includes supply, installation, testing, commissioning of goods, operator training, and providing statutory clearances, ensuring end-to-end execution at the GE EP Jodhpur site.
Exact payment terms are not specified here; bidders should anticipate standard govt terms, including milestone payments after testing/commissioning and compliance with approved samples, with potential advance payments per contract norms.
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS