Bid Publish Date
07-Jul-2026, 11:33 am
Bid End Date
18-Jul-2026, 12:00 pm
EMD
₹3,00,000
Location
Progress
Quantity
36
Bid Type
Single Packet Bid
The Rural Development Department Uttar Pradesh invites bids for the procurement of Octagonal Pole (V2) systems including associated add-on items and testing services. The project covers the complete scope from supply, installation, testing, to commissioning of poles designed for luminaire fitment, with on-site warranty and wind-load compliant construction. The bid includes options to increase quantity up to 25% of bid quantity and potentially extend delivery within defined parameters. A bidder must demonstrate OEM capability, in-country after-sales presence, and adherence to central government testing standards. The opportunity centers on delivering poles with specified brackets, junction boxes, and safety features for regional deployments.
Octagonal pole construction with specified sheet thickness and stiffeners
Bracket type and length for luminaire mounting
Maximum LEDs per bracket and on-site warranty duration
Pole material, base plate material, base plate dimensions and bolt specifications
Conformity of bolts and nuts to standards
Regional wind withstand capacity (m/s)
Galvanized lightning finial and aviation obstruction lights as add-ons
Junction box material, IP rating, ISI-marked cables to luminaires
Terminal box with circuit breakers and MCB counts per junction box
Winch mechanism for maintenance with interlocking and wiring
Quantity can increase by up to 25% at contract stage with proportional delivery time
OEM/authorized seller must have registered office in India for after-sales service
Functional Service Centre required in each consignee state or established within 30 days
Bid price must include all costs; no separate post-bid payments; service center setup evidence required for payment release
Delivery period commences from last date of original delivery order; extended delivery time formula applies for option quantities
Not specified in provided terms; ensure to confirm LD or performance bond requirements in final tender
Availability of in-country after-sales service center or plan within 30 days of award
Experience certificates for supply, installation, testing of similar pole luminaires
OEM authorization for imported components and registered Indian office
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Octagonal Pole (V2) (Q3)
Advisory Bank
State Bank of India
Payment Timelines
Payments shall be made to the Seller within 15 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Gorakhpur
Delivery Pincodes
273152
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Shailendra Kumar Mishra | 273152,BLOCK DEVELOPMENT OFFICE PIPRICH DISTIC GORAKHPUR UTTAR PRADESH PIN CODE-273152 | Gorakhpur | Uttar Pradesh | 273152 | 36 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
GEM_CATEGORY_SPECIFICATION
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
| Category | Specification | Requirement |
|---|---|---|
| GENERIC | Height of Octagonal pole (in Meters) | 4, 5, 6, 7, 8, 9, 10, 11, 12 |
| GENERIC | Type of bracket for suitable fitment of luminaire on the Octagonal pole | Single Arm |
| GENERIC | Each bracket length (in mm) | 1000 |
| GENERIC | No of LED Luminaires can be fitted in the bracket of each octagonal pole (in Nos) | 1 |
| GENERIC | On site warranty (in Months) | 12 |
| OCTAGONAL POLE CONSTRUCTION | Material of Octagonal pole | Grade ISH430LA as per IS:5986:2017 latest |
| OCTAGONAL POLE CONSTRUCTION | Octagonal pole sheet thickness (in mm) | 3 |
| OCTAGONAL POLE CONSTRUCTION | No. of stiffners per pole | No |
| OCTAGONAL POLE CONSTRUCTION | Door opening on base of the pole (opening permits clear access to equipment like MCB, Switches, cables, etc., ) | Door opening: 500 mm height from base plate, Size: 100 mm x 500 mm with Gasket |
| OCTAGONAL POLE CONSTRUCTION | Type of locking arrangement for door | Pad lock with key |
| BASE PLATE | Base plate material | Grade: E250, Quality:BR (as per IS:2062:2011 latest) |
| BASE PLATE | Base plate size - ( Length in mm x Width in mm x Thickness in mm) | 300X300X16 |
| BASE PLATE | Bolt size | M24x750 |
| BASE PLATE | Conformity of specification for Bolts and Nuts | as per IS:1367 (Part 2) , Grade A |
| WIND LOAD | Regional wind withstand capacity which the pole structure support is suitable to withstand (in m/s) | 47 |
| ADD ON ITEMS | Galvanized lightning finial for each pole (in Nos) | Without Lightning Finial |
| ADD ON ITEMS | Aviation obstruction lights on top of each pole with vertical stand and with LED/GLS (in Nos) | Without Aviation Light |
| ADD ON ITEMS | Junction box on the Carriage Assembly as required, from which the interconnections for the designed number of the light fixtures on the carriages | No |
| ADD ON ITEMS | Material of Junction Box | Without Junction Box |
| ADD ON ITEMS | Ingress protection class of Junction Box | Without Junction Box |
| ADD ON ITEMS | Cable (ISI Marked Cable) connections from the top junction box to the individual luminaries of each pole | Without Cable Connection |
| ADD ON ITEMS | Cable (ISI Marked Cable) connections from the Bottom of the pole i.e. from pole's door opening (Base compartment) to top junction box of each pole | Without Cable Connection |
| ADD ON ITEMS | Terminal Box with Circuit breakers and backlite sheet for cable termination at door opening (Base compartment) for each pole | Without MCBs |
| ADD ON ITEMS | No.of MCB per Junction Box (in Nos.) | Without MCBs |
| ADD ON ITEMS | Suitable winch mechanism (raising and lowering mechanism) according to pole height and according to no.of LED luminaires with necessary interlocking , wires and ropes for maintenance | Without Winch Mechanism |
| CERTIFICATIONS | Availability of type test reports for the entire system including for Pole construction , wind load (velocity) tests, Winch Mechanism, from Central Govt., Lab/NABL. ILAC accredited lab to prove conformity of the specification | Yes |
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates for similar pole projects
Financial statements (last 2 quarters/years)
EMD submission document (online/DD as applicable)
Technical bid documents showing compliance with octagonal pole specs
OEM authorization/registered office proof in India for imported products
Escalation matrix for service support
Certificate of service centers in the state or plan to establish within 30 days of award
Type test reports from Central Govt./NABL/ILAC accredited labs
Key insights about UTTAR PRADESH tender market
Bidders should submit GST, PAN, experience certificates, financials, and EMD ₹300,000. Provide OEM authorizations for imported parts, service-center plan in state, and type-test reports from NABL/ILAC labs proving wind-load compliance and pole construction standards.
Required documents include GST certificate, PAN, experience certificates, financial statements, EMD submission proof, OEM authorization for imported items, and technical bid detailing bracket type, luminaire count per pole, wind-load capacity, and junction box specifications.
Standards include IS-based pole construction requirements, NABL/ILAC accredited type tests for wind velocity and winch mechanism, ISI-marked cables, and conformity of bolts/nuts with specified dimensions and base-plate specifications.
EMD is ₹300,000. The tender requires bid price to include all costs; payment terms depend on contract conditions and service-center evidence; confirm any milestone payments tied to installation, testing, and commissioning.
Option allows up to 25% higher quantity with delivery time adjusted using formula: (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days; delivery period starts from last date of original order.
Add-ons include galvanized lightning finial, aviation obstruction lights with stand, junction box with IP-rated cable connections, ISI-marked cables to luminaires, and a winch mechanism for maintenance.
Bidder must have or establish a functional service center in each consignee state; provide escalation matrix and evidence of center setup before final payment or contract award release.
Region-specific wind withstand capacity is required in m/s; type-test reports must cover wind-load tests performed by Central Govt./NABL/ILAC accredited labs to prove conformity.
Sign up now to access all documents
Main Document
GEM_CATEGORY_SPECIFICATION
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS